Bureau of Reclamation Banner

Vallecito Dam

Photo of Vallecito Dam
Related Projects & Facilities
Pine River Project
Related Links
Printable View
Overview General Dimensions Hydraulics & Hydrology Contact Information
Structural Height162.00 ft
Hydraulic Height (Normal Operating Depth at Dam)121.5 ft
Spillway Crest Elevation7646.00 ft
Crest Elevation7673.0 ft
Crest Length4010.00 ft
Volume of Dam Construction Materials3,738,000 cu yds
Streambed at Dam Axis7547.00 ft
Top of Joint Use Pool (Elevation)7665.00 ft
Top of Dead Storage Pool (Elevation)7582.54 ft

Last updated: Apr 10, 2009