| Structural Height | 164.0 ft |
| Hydraulic Height (Normal Operating Depth at Dam) | 143.0 ft |
| Spillway Crest Elevation | 4254.0 ft |
| Crest Elevation | 4301.0 ft |
| Crest Length | 3675.0 ft |
| Volume of Dam Construction Materials | 2,250.00 cu yds |
| Streambed at Dam Axis | 4154.0 ft |
| Top of Joint Use Pool (Elevation) | 4297.0 ft |
| Top of Active Conservation Pool (Elevation) | 4261.0 ft |
| Top of Dead Storage Pool (Elevation) | 4200.0 ft |