Bureau of Reclamation Banner

Starvation Dam

Photo of Starvation Dam
Related Projects & Facilities
Central Utah Project - Bonneville Unit
Related Links
Printable View
Overview General Dimensions Hydraulics & Hydrology Contact Information
Structural Height200.3 ft
Hydraulic Height (Normal Operating Depth at Dam)162.0 ft
Crest Elevation5725.0 ft
Crest Length3070.0 ft
Volume of Dam Construction Materials483,600 cu yds
Streambed at Dam Axis5563.0 ft
Top of Joint Use Pool (Elevation)5712.0 ft
Top of Inactive Conservation Pool (Elevation)5624.8 ft
Top of Dead Storage Pool (Elevation)5595.0 ft

Last updated: Aug 04, 2009