| Structural Height | 150.00 ft |
| Hydraulic Height (Normal Operating Depth at Dam) | 134.8 ft |
| Crest Elevation | 6840.00 ft |
| Crest Length | 1,021 ft |
| Crest Width | 5.0 ft |
| Base Width | 15.0 ft |
| Volume of Dam Construction Materials | 238.672 cu yds |
| Streambed at Dam Axis | 6760.9 ft |
| Top of Active Conservation Pool (Elevation) | 6826.6 ft |
| Top of Inactive Conservation Pool (Elevation) | 6780.0 ft |
| Top of Dead Storage Pool (Elevation) | 6760.9 ft |