| Structural Height | 165.0 ft |
| Hydraulic Height (Normal Operating Depth at Dam) | 86.0 ft |
| Crest Elevation | 2415.0 ft |
| Crest Length | 5665.0 ft |
| Streambed at Dam Axis | 2300.0 ft |
| Top of Joint Use Pool (Elevation) | 2366.1 ft |
| Top of Active Conservation Pool (Elevation) | 2366.1 ft |
| Top of Inactive Conservation Pool (Elevation) | 2343.0 ft |
| Top of Dead Storage Pool (Elevation) | 2355.0 ft |