Bureau of Reclamation Banner

Jordanelle Dam

Photo of Jordanelle Dam
Related Projects & Facilities
Central Utah Project - Bonneville Unit
Related Links
Printable View
Overview General Dimensions Hydraulics & Hydrology Contact Information
Structural Height345.0 ft
Hydraulic Height (Normal Operating Depth at Dam)283.0 ft
Spillway Crest Elevation6169.0 ft
Crest Elevation6185.0 ft
Crest Length3700.0 ft
Volume of Dam Construction Materials14,500,000 cu. yards
Streambed at Dam Axis5886.0 ft
Top of Joint Use Pool (Elevation)6166.4 ft
Top of Active Conservation Pool (Elevation)6130.0 ft
Top of Dead Storage Pool (Elevation)5902.0 ft

Last updated: Mar 05, 2009