Bureau of Reclamation Banner

Hyrum Dam

Photo of Hyrum Dam
Related Projects & Facilities
Hyrum Project
Related Links
Printable View
Overview General Dimensions Hydraulics & Hydrology Contact Information
Structural Height116 ft
Hydraulic Height (Normal Operating Depth at Dam)82 ft
Crest Elevation4680 ft
Crest Length540 ft
Volume of Dam Construction Materials430,000 cu. yards
Streambed at Dam Axis4590.0 ft
Top of Active Conservation Pool (Elevation)4672.0 ft
Top of Inactive Conservation Pool (Elevation)4633.5 ft
Top of Dead Storage Pool (Elevation)4629.6 ft

Last updated: Mar 05, 2009