Bureau of Reclamation Banner

Avalon Dam

Needs a description
Related Projects & Facilities
Carlsbad Project
Sumner Dam
Related Links
Printable View
Overview General Dimensions Hydraulics & Hydrology Contact Information
Structural Height60.0 ft
Hydraulic Height (Normal Operating Depth at Dam)33.4 ft
Crest Elevation3194.0 ft
Crest Length1025.0 ft
Volume of Dam Construction Materials 202,000 cu. yards
Streambed at Dam Axis3152.0 ft
Top of Active Conservation Pool (Elevation)3177.4 ft
Top of Dead Storage Pool (Elevation)3157.0 ft

Last updated: Feb 20, 2009