Savage Rapids Dam Fish Passage Improvement Project
Environmental Assessment and FONSI |
 |
|
The Bureau of Reclamation issued a Draft Environmental Assessment evaluating impacts of the installation of pumping facilities and subsequent removal of Savage Rapids Dam, near Grants Pass, Oregon. The purpose of the action is to improve fish passage while maintaining a water diversion for the Grants Pass Irrigation District.
Although these actions were previously evaluated by Reclamation in a 1995 planning report and final Environmental Impact Statement, the revised preferred alternative is presented in this current EA differs from the original plan.
Few comments were received on the draft EA and the additional information provided only supplemented existing discussion. Therefore, the draft EA was not revised and serves as the final EA.
A copy of the EA and FONSI may be obtained at the Grants Pass Irrigation District office at 200 Fruitdale Drive in Grants Pass, Oregon, or by contacting Mr. Robert Hamilton at (208) 378-5087 or via email at rhamilton@usbr.gov.
|
 |
Download Files |
| FONSI |
Full Document |
3 mb PDF |
EA: Fish Passage Improvements, Savage Rapids Dam, Grants Pass Project, Oregon |
Full Document |
1.23 mb PDF |
Appendices |
Full Document, |
7.2 mb PDF |
Appendix A: Proposed Conservation Measures
Appendix B: EA Distribution List
Appendix C: ESA-Related Correspondence |
pp. 1-30 |
661 kb PDF |
Appendix D: Final Supp. Coord. Act Report |
pp. 31-164 |
2.5 mb PDF |
Appendix E: Letters to Tribal Governments |
pp. 165-170 |
29 kb PDF |
|
 |
1995 Planning Report
& Final Environmental Statement
|
Josephine County Water Management Improvement Study--Oregon |
Full Document |
12 mb PDF |
Appendices |
Full Document |
7 mb PDF |
Cover
Record of Decision
Amendment to Record of Decision
Preparers
Abbreviations/Acronyms
Summary |
pp. 1-35 |
1.7 mb PDF |
Contents
Chapter 1: Introduction |
pp. 36-68 |
1.6 mb PDF |
Chapter 2: Need for Action
Chapter 3: Preferred Alternative |
pp. 69-100 |
1.6 mb PDF |
Chapter 4: Dam Retention Alternative
Chapter 5: No Action Alternative |
pp. 101-128 |
1.18 mb PDF |
Chapter 6: Affected Environment
& Environmental Consequences |
pp. 129-177 |
2.36 mb PDF |
Chapter 7: Consultation & Coordination
Chapter 8: Formulation & Evaluation
Chapter 9: Bibliography
Chapter 10: List of Preparers
Chapter 11: Index |
pp. 178-229 |
1.69 mb PDF |
Appendix A: Glossary
Appendix B: GPID Temporary Water Permit
Appendix C: USFWS Report & ESA Correspondence |
pp. 1-80 |
3 mb PDF |
Appendix D: ODFW Documents |
pp. 81-148 |
1.54 mb PDF |
Appendix E: GPID Resolution
Appendix F: Environmental Commitments
Appendix G: Oregon Water Resources Commission Order |
pp. 149-182 |
883 kb PDF |
Appendix H: SHPO Letter |
pp. 183-193 |
374 kb PDF |
Appendix I: Comments and Responses |
pp. 193-292 |
2.2 mb PDF |
Appendix J: Wild & Scenic Rivers Determination |
pp. 293-304 |
386 mb PDF |
|
 |
Last Update:
May 21, 2009 12:06 PM
|