Construction of a Third Hydroelectric Generating Unit - Black Canyon Dam |
||
Reclamation’s public involvement included comments received from an individual via a letter, and two phone messages from Idaho Department of Parks the Corps and where appropriate, the Final EA was revised to reflect their concerns. Reclamation did incorporate editorial revisions to clarify aspects of the document and to ensure accuracy. These revisions did not substantially change the environmental impacts discussed in the Draft EA. The findings of the FONSI are based on the Final EA and the comment summary and responses. Based on a thorough review of the comments received and analysis of the environmental impacts, mitigation measures, and implementation of all environmental commitments as presented in the Final EA and FONSI, Reclamation concluded that implementation of the recommended action alternative of constructing a third hydroelectric generation unit at Black Canyon Dam will not have a significant effect on the quality of the human environment or natural and cultural resources. The effects of the recommended action alternative will be short-term, minor, and localized. Therefore, Reclamation concludes that preparation of an Environmental Impact Statement (EIS) is not required and that the FONSI satisfies the requirements of NEPA. |
||
Documents |
||
| 10/2011 | Final Environmental Assessment Finding of No Significant Impact Construction of a Third Hydroelectric Generating Unit - Black Canyon Dam | PDF 2.22 mb |
| 06/2011 | Construction of a Third Hydroelectric Generating Unit - Black Canyon Dam Draft Environmental Assessment | PDF 2.21 mb |
| Contact | ||
Gretchen Fitzgerald Bureau of Reclamation |
||
|
Last Update: February 13, 2012 3:38 PM |
||


