7/23/2008  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for  7/23/2008 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         54678.00  65534       83.43        4.44       191.94     -369.00
COLD SPRINGS  13707.75  38000       36.07        0.00       144.16     -295.49



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL            15.29    UMATILLA R. @ PENDLETON          74.38
FEED (HID) CANAL NR ECHO        0.00    UMATILLA R. @ YOAKUM            243.94
WESTLAND CANAL                162.30    UMATILLA R. BL FEED CANAL       252.99
DILLON CANAL                    5.25    UMATILLA R. BL DILLON            64.57
MAXWELL (HID) CANAL            41.27    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL            144.16    UMATILLA R. @UMATILLA           101.00
WEST EXTENSION(WEID) CANAL    131.28    WILDHORSE CRK NR PENDLETON        1.16
FEED CANAL NR HERMISTON         0.00    MCKAY CRK NR PILOT ROCK QIN       4.44
                                        MCKAY CRK NR PENDLETON          191.94
                                        BIRCH CRK NR RIETH                0.63



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                       126.34
PHASE 2 @ COLUMBIA RIVER             113.13
PHASE 2 @ COLD SPRINGS RELIFT        103.79
PHASE 2 @ COLD SPRGS RES SPILL         9.34
PHASE 2 @ STANFIELD RELIFT
      

OPERATIONAL COMMENTS:
---------------------

	UMATILLA RIVER
        --------------
               
                HID STOPPED DIVERTING FLOW TO COLD SPRINGS RESERVOIR
                5/4/06
                WID STARTED DIVERTING FOR IRRIGATION ON 3/25/06
                WEID STARTED DIVERTING ON 3/19/06
                SID STARTED DIVERTING ON 5/25/06
                HID STARTED DIVERTING INTO MAXWELL ON 4/10/06 

        EXCHANGES
        ---------
                PHASE II HID EXCHANGE BEGAN ON 11/2/05 FOR WY 2006
                PHASE II SID LIVE FLOW EXCHANGE BEGAN ON 5/15/06 AND 6/11/06
                AND 6/19/06. Continuing to run Phase II exchange into July 06.
                PHASE II STARTED DIVERTING ON 5/14/06.
                PHASE I EXCHANGE BEGAN ON 6/12/06 and 6/20/06 and 7/13/06.
		PHASE I STARTED DIVERTING ON 3/01/06 for Brownell Ditch.

        PUMPING PLANTS
        --------------
                STANFIELD AND ECHO PUMPING PLANTS ONLINE ON 5/15/06.
		COLUMBIA, COLD SPRINGS AND WEID PUMPING PLANTS STARTED PUMPING
		    EXCHANGE WATER ON 5/14/06 AND 6/12/06. 

        MCKAY RESERVOIR
        ---------------
                FLOOD CONTROL RELEASES began 6/4/06 through 6/10/06.  
                BEGAN RELEASING FOR FISH ON 6/21/06. 
                BEGAN RELEASING FOR IRRIGATION ON 6/23/06.
		FISH WATER WAS RELEASED FROM THROUGH 6/21/06-6/30/06 and 7/4/06-.
                through 7/15/06.
   
        COLD SPRINGS RESERVOIR
        ----------------------
                STARTED RELEASING FOR IRRIGATION ON 4/27/06