4/28/2015  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for  4/28/2015 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         50879.00  65534       77.64       28.00       180.00     -249.00
COLD SPRINGS  21151.62  38000       55.66        0.00       108.00     -231.68



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL            15.00    UMATILLA R. @ PENDLETON         216.00
FEED (HID) CANAL NR ECHO   998877.00    UMATILLA R. @ YOAKUM            405.00
WESTLAND CANAL                204.00    UMATILLA R. BL FEED CANAL       399.00
DILLON CANAL                    6.10    UMATILLA R. BL DILLON           173.00
MAXWELL (HID) CANAL            33.61    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL            108.00    UMATILLA R. @UMATILLA           189.00
WEST EXTENSION(WEID) CANAL     91.90    WILDHORSE CRK NR PENDLETON        9.40
FEED CANAL NR HERMISTON         0.00    MCKAY CRK NR PILOT ROCK QIN      28.00
                                        MCKAY CRK NR PENDLETON          180.00
                                        BIRCH CRK NR RIETH               29.00



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                        90.11
PHASE 2 @ COLUMBIA RIVER             129.00
PHASE 2 @ COLD SPRINGS RELIFT         67.00
PHASE 2 @ COLD SPRGS RES SPILL        62.00
PHASE 2 @ STANFIELD RELIFT