11/ 7/2009  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for 11/ 7/2009 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         10813.00  65534       16.50        7.04       125.00     -218.00
COLD SPRINGS    985.50  38000        2.59   998877.00    998877.00       -3.50



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL        998877.00    UMATILLA R. @ PENDLETON          78.98
FEED (HID) CANAL NR ECHO        0.00    UMATILLA R. @ YOAKUM            198.47
WESTLAND CANAL             998877.00    UMATILLA R. BL FEED CANAL       211.00
DILLON CANAL               998877.00    UMATILLA R. BL DILLON           233.00
MAXWELL (HID) CANAL        998877.00    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL         998877.00    UMATILLA R. @UMATILLA           239.00
WEST EXTENSION(WEID) CANAL 998877.00    WILDHORSE CRK NR PENDLETON        9.63
FEED CANAL NR HERMISTON    998877.00    MCKAY CRK NR PILOT ROCK QIN       7.04
                                        MCKAY CRK NR PENDLETON          125.00
                                        BIRCH CRK NR RIETH                4.23



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                         0.04
PHASE 2 @ COLUMBIA RIVER          998877.00
PHASE 2 @ COLD SPRINGS RELIFT     998877.00
PHASE 2 @ COLD SPRGS RES SPILL         0.00
PHASE 2 @ STANFIELD RELIFT
      

OPERATIONAL COMMENTS:
---------------------

	UMATILLA RIVER
        --------------
               
                HID STOPPED DIVERTING FLOW TO COLD SPRINGS RESERVOIR
                5/4/06
                WID STARTED DIVERTING FOR IRRIGATION ON 3/25/06
                WEID STARTED DIVERTING ON 3/19/06
                SID STARTED DIVERTING ON 5/25/06
                HID STARTED DIVERTING INTO MAXWELL ON 4/10/06 

        EXCHANGES
        ---------
                PHASE II HID EXCHANGE BEGAN ON 11/2/05 FOR WY 2006
                PHASE II SID LIVE FLOW EXCHANGE BEGAN ON 5/15/06 AND 6/11/06
                AND 6/19/06. Continuing to run Phase II exchange into July 06.
                PHASE II STARTED DIVERTING ON 5/14/06.
                PHASE I EXCHANGE BEGAN ON 6/12/06 and 6/20/06 and 7/13/06.
		PHASE I STARTED DIVERTING ON 3/01/06 for Brownell Ditch.

        PUMPING PLANTS
        --------------
                STANFIELD AND ECHO PUMPING PLANTS ONLINE ON 5/15/06.
		COLUMBIA, COLD SPRINGS AND WEID PUMPING PLANTS STARTED PUMPING
		    EXCHANGE WATER ON 5/14/06 AND 6/12/06. 

        MCKAY RESERVOIR
        ---------------
                FLOOD CONTROL RELEASES began 6/4/06 through 6/10/06.  
                BEGAN RELEASING FOR FISH ON 6/21/06. 
                BEGAN RELEASING FOR IRRIGATION ON 6/23/06.
		FISH WATER WAS RELEASED FROM THROUGH 6/21/06-6/30/06 and 7/4/06-.
                through 7/15/06.
   
        COLD SPRINGS RESERVOIR
        ----------------------
                STARTED RELEASING FOR IRRIGATION ON 4/27/06