2/27/2015  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for  2/27/2015 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         44252.00  65534       67.53      150.00         8.94      177.00
COLD SPRINGS  23345.15  38000       61.43      162.00    998877.00      283.89



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL        998877.00    UMATILLA R. @ PENDLETON         594.00
FEED (HID) CANAL NR ECHO      203.00    UMATILLA R. @ YOAKUM            595.00
WESTLAND CANAL                 34.60    UMATILLA R. BL FEED CANAL       255.32
DILLON CANAL               998877.00    UMATILLA R. BL DILLON           290.00
MAXWELL (HID) CANAL        998877.00    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL         998877.00    UMATILLA R. @UMATILLA           291.00
WEST EXTENSION(WEID) CANAL 998877.00    WILDHORSE CRK NR PENDLETON       26.00
FEED CANAL NR HERMISTON       162.00    MCKAY CRK NR PILOT ROCK QIN     150.00
                                        MCKAY CRK NR PENDLETON            8.94
                                        BIRCH CRK NR RIETH               35.00



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                         0.16
PHASE 2 @ COLUMBIA RIVER          998877.00
PHASE 2 @ COLD SPRINGS RELIFT     998877.00
PHASE 2 @ COLD SPRGS RES SPILL    998877.00
PHASE 2 @ STANFIELD RELIFT