                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for  9/29/2016 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         17625.00  65534       26.89   998877.00       102.00     -218.00
COLD SPRINGS   2408.58  38000        6.34   998877.00        87.00     -352.49



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL        998877.00    UMATILLA R. @ PENDLETON          45.00
FEED (HID) CANAL NR ECHO   998877.00    UMATILLA R. @ YOAKUM            144.00
WESTLAND CANAL                 29.00    UMATILLA R. BL FEED CANAL       138.00
DILLON CANAL                    5.00    UMATILLA R. BL DILLON            95.00
MAXWELL (HID) CANAL            11.00    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL             87.00    UMATILLA R. @UMATILLA           143.00
WEST EXTENSION(WEID) CANAL     61.60    WILDHORSE CRK NR PENDLETON        2.00
FEED CANAL NR HERMISTON    998877.00    MCKAY CRK NR PILOT ROCK QIN  998877.00
                                        MCKAY CRK NR PENDLETON          102.00
                                        BIRCH CRK NR RIETH           998877.00



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                        61.53
PHASE 2 @ COLUMBIA RIVER             184.00
PHASE 2 @ COLD SPRINGS RELIFT        182.70
PHASE 2 @ COLD SPRGS RES SPILL         1.30
PHASE 2 @ STANFIELD RELIFT