5/ 2/2016  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for  5/ 2/2016 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY         57179.00  65534       87.25       11.00        78.00     -107.00
COLD SPRINGS  22392.18  38000       58.93        0.00       108.00     -223.00



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL             5.60    UMATILLA R. @ PENDLETON         279.00
FEED (HID) CANAL NR ECHO   998877.00    UMATILLA R. @ YOAKUM            387.00
WESTLAND CANAL                186.00    UMATILLA R. BL FEED CANAL       281.00
DILLON CANAL                    7.50    UMATILLA R. BL DILLON           161.00
MAXWELL (HID) CANAL            36.00    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL            108.00    UMATILLA R. @UMATILLA           194.00
WEST EXTENSION(WEID) CANAL     81.80    WILDHORSE CRK NR PENDLETON        5.80
FEED CANAL NR HERMISTON         0.00    MCKAY CRK NR PILOT ROCK QIN      11.00
                                        MCKAY CRK NR PENDLETON           78.00
                                        BIRCH CRK NR RIETH               16.00



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                        81.19
PHASE 2 @ COLUMBIA RIVER             101.00
PHASE 2 @ COLD SPRINGS RELIFT         80.00
PHASE 2 @ COLD SPRGS RES SPILL        21.00
PHASE 2 @ STANFIELD RELIFT