12/ 5/2016  12:05
                           U.S.Bureau of Reclamation
                                Umatilla Project
                   System Status Report for 12/ 5/2016 at 08:00



                        TOTAL    PERCENT    RESERVOIR    RESERVOIR     CONTENT 
RESERVOIR     CONTENT  CAPACITY  CAPACITY      INFLOW     RELEASES      CHANGE 
                (af)     (af)      (%)         (cfs)       (cfs)        (af)  
------------------------------------------------------------------------------
MCKAY          8043.00  65534       12.27       65.00        11.00       75.00
COLD SPRINGS   3074.91  38000        8.09   998877.00    998877.00      138.60



IRRIGATION DIVERSIONS          (cfs)    RIVER FLOWS                      (cfs)
---------------------          -----    ------------                     -----
FURNISH (SID) CANAL        998877.00    UMATILLA R. @ PENDLETON         400.00
FEED (HID) CANAL NR ECHO   998877.00    UMATILLA R. @ YOAKUM            414.00
WESTLAND CANAL             998877.00    UMATILLA R. BL FEED CANAL       335.00
DILLON CANAL               998877.00    UMATILLA R. BL DILLON           350.00
MAXWELL (HID) CANAL        998877.00    UMATILLA R. BL BUTTER CRK    998877.00
A-LINE (HID) CANAL         998877.00    UMATILLA R. @UMATILLA           334.00
WEST EXTENSION(WEID) CANAL 998877.00    WILDHORSE CRK NR PENDLETON        5.30
FEED CANAL NR HERMISTON    998877.00    MCKAY CRK NR PILOT ROCK QIN      65.00
                                        MCKAY CRK NR PENDLETON           11.00
                                        BIRCH CRK NR RIETH                7.00



PUMPING PLANTS                        (cfs)
--------------                        -----
PHASE 1 @ WEID                         0.06
PHASE 2 @ COLUMBIA RIVER          998877.00
PHASE 2 @ COLD SPRINGS RELIFT     998877.00
PHASE 2 @ COLD SPRGS RES SPILL    998877.00
PHASE 2 @ STANFIELD RELIFT



Last Updated: 10/27/15