Tracy Vermeyen and Travis Bauer. 2008. "Nimbus Dam Tailwater Bathymetry Survey, American River, Central Valley Project". Bureau of Reclamation, Report Number TR-2008-03.

Abstract: An acoustic Doppler current profiler and a Trimble RTK-GPS were used to collect high resolution bathymetry data in the tailwater below Nimbus Dam on the Armerican River. A Trimble RTK-GPS system was used to collect survey grade position and elevation data concurrently with ADCP data. The GPS setup on the TBM at Nimbus Dam was adequate to provide continuous coverage over the study reach. Processed bathymetry (x,y,z) data will be delivered to interested parties after the data has been peer reviewed.


Web Link: http://www.usbr.gov/pmts/hydraulics_lab/pubs/TR/TR-2008-03.pdf