Tracy B. Vermeyen. 2006. "Controlotron Flowmeter, Big Thompson Powerplant, near Loveland, Colorado". Bureau of Reclamation, Report Number TR-2006-05.
Abstract:
Web Link:
http://www.usbr.gov/pmts/hydraulics_lab/pubs/TR/TR-2006-05.pdf
The script that generated this page was last revised on 08/08/12