. 1987. "ACER Technical Memorandum No. 10 - Guidelines for Using Fuse Plug Embankments in Auxiliary Spillways". Bureau of Reclamation, Report Number PAP-555.
Abstract:
Web Link:
http://www.usbr.gov/pmts/hydraulics_lab/pubs/PAP/PAP-0555.pdf
The script that generated this page was last revised on 08/08/12