Bureau of Reclamation Banner

Bureau of Reclamation - Hydraulic Investigations and Laboratory Services Group Reports

Record Count: 4404

Report ID
Year Report Title

Link

V-99 1996 Les Inondations Au Saguenay (The Saguenay Floods)
V-98 1996 Introduction to the PLGR+96 for Natural Resource Applications, A Distance Learning Production by the US Fish and WIldlife Service, National Education and Training Center, US Department of the Interior, 34:45 Minutes (Closed Captioned)
V-97 1996 Stepped Concrete Blocks for Embankment Dams - Embankment Dam Overtopping, March 26, 1996 - 15 minutes
V-96 1996 Water on Demand: An Introduction to Canal Automation, 11 minutes
V-95 1987 Horse Mesa Dam Tunnel/Spillway Operations Testing, December 1987
V-94 0 Upper Stillwater Model
V-93 1989 Roosevelt Weir, Master Edited Video, February 2, 1989
V-92 1992 Hemet/San Jacinto Wetland, August 1992
V-91 1995 Black Rock Dam - Hydraulic Model Study, 4/11/95
V-90 1995 In-Place Canal Lining (16:50)
V-9 1989 Inland Water Search and Rescue - Corps of Engineers - Boat Chute Study - December 1989
V-89 1995 Upper Stillwater Spillway Discharges (1500 cfs), 1995
V-88 1995 Solar Powered Canal Automation: Water Management and conservation Utilizing High Technology (8 min.)
V-87 1995 Salt River Siphon Evacuation Structure Test
V-86 1986 Spillway Runoff at Dickinson Dam
V-85 1994 Let's Measure Up (20 minutes)
V-84 1994 Ridgway Dam - River Outlet Stilling Basin - Mini-Sub Inspection, November 14, 1994
V-83 1994 Durango Pumping Plant - 1992-1994 - Continuous Sediment Removal and Pump Vortex Studies, March 1994
V-82 1994 Durango Pumping Plant - 1:12 Scale Model Study 1992-1994, March 1994
V-81 1992 Hemet/San Jacinto Hydraulic Wetlands Model Study - June 29, 1992 (20 min.)
V-80 0 Water Measurement: Current Meter Part I and Part II (2 videos)
V-8 1984 Challenge at Glen Canyon - December 1, 1984
V-79 1986 Twin Lakes Filter Test (4 videos) - March 3, 1982; March 25, 1982; March 30, 1982; April 19, 1982
V-78 1986 Twin Buttes - June 3, 1986
V-77 1994 UK Overtopping Studies - 1994 - Jackhouse Field Tests - Salford University Laboratory Tests - Richfield Dam - Wave Overtopping
V-76 1985 US/Spain Cooperative Research - CEDEX - June 1985
V-75 1985 US/Spain Cooperative Research "El Grado" - June 1985
V-74 1990 Understanding Water Measurement - July 25, 1990 (13 min. 10 sec.)
V-73 1991 Yellowtail Spillway Inspection - May 8, 1991
V-72 1983 Yellowtail Underwater Afterbay Inspection - October 1983
V-71 1982 Yellowtail 1:24-scale Model - Installation of Deflector Plates - 1982
V-70 1983 Hydraulic Model Study of Yellowtail Sluiceway Studies- October 18, 1983 (8 min. 17 sec.)
V-7 1984 Cavitation: A Bursting Bubble - May 1984
V-69 1989 WHITEX - April 1989 (12 min. 20 sec.)
V-68 1983 Stampede Dam Air Slot Study - September 1, 1983 (8 min.)
V-67 1987 Excessive Scour Downstream of High-level Emergency Spillways - April 9, 1987 - Video report REMR-HY-1 (20 min.)
V-66 1991 Step Spillway Design for Sloping Embankments - Technical Update Lecture - November 5, 1991 - Edited master (47 min.)
V-65 1986 Silver Jack Dam Emergency Gate Closure Tests - October 10, 1986
V-64 1990 7 Oaks Model - November 6, 1990 - Corps of Engineers (1 hr. 4 min.)
V-63 1988 Hydraulic Model Study - Roosevelt Dam - November 14, 1988, Edited master - 20 minutes
V-62 1993 Stewart Mountain Dam Auxiliary Spillway Test - maximum flow 17,500 ft3/s - February 24, 1993
V-61 0 Stewart Mountain Dam 1:40 Scale Model
V-60 1988 Santa Rosa Turnout - Meter Structure Flows - Gate 1 - March 25, 1988
V-6 1987 Buckskin Mountain Tunnel test
V-59 1982 Stilling Basin Damage - Mason Dam, August 1982, April 3, 1991
V-58 1992 Model Study of Baldhill Spillway Pressure Contours - May 1992 - Corps of Engineers Waterways Experiment Station
V-57 0 Tucurui - World's Largest Spillway
V-56 1987 Kings River Syphon Hydraulic Model - September 1987 Test Runs
V-55 0 Fuse Plug USCOLD (8 minutes)
V-54 0 Intro to FIDAP Fluid Dynamic Computer Modeling (time 41:45)
V-53 1987 Surge Flow Study - November 1987 (10 minute edited master)
V-52 1988 Friant-Madera Canal 96-in Hollow-Jet Valve Operation - May 1988
V-51 1984 Helms Project - October 1984, Movie of Courtright ID with one unit pumping. Reservoir at low elevation.
V-50 1988 McPhee Spillway Study Model vs. Prototype - August 4, 1988
V-5 0 Bartlett Dam - Tape 2 (Time coded)
V-49 1993 Channel 7 News - Dave Minshall Report - May 28, 1993 (Durango and other models)
V-48 1993 Colorado Getaways - June 1993 (Durango Pumping Plant and other models)
V-47 1984 McPhee Dam Spillway Aeration Ramp Study - June 21, 1984
V-46 1989 New Waddell Tower - Trashrack Concerns - January 18, 1989
V-45 1989 New Waddell Top Trashrack - May 22, 1989, Velocity data
V-44 1988 Navajo Valve Operator Study - November 16, 1988, Navajo Indian Irrigatin Project
V-43 1990 Milltown Hill Dam - August 1990
V-42 1959 Oxbow Fuse Plug Research - July 1959, Bureau of Reclamation
V-41 0 New Development in Seam Treatment of Feitsui Arch Dam Foundation
V-40 1985 Pumped/Storage Lectures at CSU - February 22, 1985
V-4 0 Bartlett Dam - Tape 1 (Time coded)
V-39 1983 1983 - The Record Water Year - July 28, 1983, Upper Colorado Region
V-38 1990 McGee Creek Dam High Water - May 2-3, 1990, McGee Creek Project Stilling Basin River Outlet Works - May 3-4, 1990 (Corps of Engineers)
V-37 1989 Overtopping Research on Brink Flows - September 29, 1989
V-36 1988 Roosevelt Diversion Dam (Tapes No. 1 and 2), Roosevelt Dam Model Study - August 2, 1988, Roosevelt Dam Diverson Concrete Bag Placement - August 9, 1988
V-35 0 Horseshoe Dam Auxiliary Spillway Dynamic Erosion Test No. 2
V-34 1980 Flood Footage 1978, 1979, 1980, Horseshoe Dam and Bartlett Dam
V-33 1983 Hyrum Model - December 1983
V-32 1985 Hoover Dam Air Slot Construction - 1985
V-31 1984 Hoover Spillway Model - August 1984
V-30 1984 Hoover - June 27, 1984, Tape 3
V-3 1993 Bartlett Dam - Service and Auxiliary Spillway Models - 1993 (Edited Master)
V-29 1984 Hoover - June 27, 1984, Tape 2
V-28 1984 Hoover Spillway Model - June 27, 1984, Tape 1
V-27 1983 Flaming Gorge Spillway - UC Region, June 20, 1983
V-26 0 Foz Do Aerial - Model/prototype, Companhia Paranaense de Energia Brazil
V-25 1983 Fuse Plug Embankment - April 28, 1983
V-24 1981 Draft Tube Surge - Henry Falvey Lecture at CSU - April 1981, Tapes A and B
V-23 1973 Draft Tube Model Turbine
V-22 1987 Effect of Fluid Compressibility Fluid Motion in Grav. Field, Fundamental Principles of Flow Characteristics Laminar and Turbulent - April 14, 1987
V-217 0 Seminoe Jet Flow Gate 1:21 Scale
V-216 0 8" Monovar Valve Free-discharging 6.25 cfs at 64' of head
V-215 0 Lab Demonstrations of Hydraulic Phenomena at SCS Hydraulic Structures
V-214 2002 Wilkins Slough Hydraulic Model Summary Video
V-213 2002 Reclamation District No. 108 Wilkins Slough Diversion Facility
V-212 2002 Internalift Enclosed Screw Pumps
V-211 2002 Irrigation Flow Measurement in Piped Systems
V-210 1983 Fuse Plug Embankment Test #7
V-21 1987 1. Intro to Study of Fluid Motion 2. Form Drag Lift and Propulsion, June 24, 1987
V-209 1984 Computational Fluid Dynamics Introduction To FIDAP
V-208 1984 E & R Center Construction Of Glen Canyon Spillway Model
V-207 1983 Glen Canyon Dam,Consolidated Tapes- Tape 1 Glen Canyon 9-29-83, Tape 2 Glen Canyon 10-12-83,Tape 3 Glen Canyon 10-13-83, Tape 4 Glen Canyon 10-14-83, Tape 5 Blue Mesa 11-14 & 12-7-83, Tape 6 Mcfee Model 11-14-83
V-206 1996 Jones Hole/PRCP Pipe Video
V-205 0 Doyle's Family Melodrama
V-204 0 Hungington Dam
V-203 0 Eiver River Water , Strawberry Water Flowing, Strawberry automation
V-202 1995 Canal Model Scipon Controller
V-201 0 Canal Automation Melodrama
V-200 1993 Dave Minchall Report, Channel 7 News
V-20 1991 Centerhill Fuse Plug Spillway - Type 12, 12-ft flume - Waterways Experiment Station, Vicksburg MS
V-2 1989 General View Atmospheric Model, July 1989
V-199 0 The Smart Valve
V-198 1994 Automation Footage
V-197 1995 Trip to Sacramento
V-196 0 Canal Automation Workshop, Excerpts from Model and Classroom
V-195 1997 Groundwater Workshop
V-194 0 Metlund Hot Water Demand System
V-193 1992 Yakima-Tieton Raft Safety Project
V-192 0 Cavitating Venturi & Turbine Facility
V-191 1989 Research Lab and Hydraulic Modeling Science and Technology Week, CNN Network
V-190 0 Boat Chute, proposed and existing
V-19 1991 Centerhill Fuse Plug Spillway - Type 11c - September 1991 (Corps of Engineers)
V-189 1994 Boat Chute Research, 20 min Clip for River Panel, CNN Tieton Union Ave Durango Pump Plant
V-188 1991 Tieton Diversion Dam
V-187 1989 Tieton Diversion Dam 1:12 model, CNN Clip, South Platte Boat Chute Model
V-186 0 McClusky Canal Fish Screen
V-185 0 Hydraulics Lab
V-184 1995 Fuse Plug Research, Oxbow Field Test, 5 min clip for Delft
V-183 1995 Fuse Plug Operation - Horseshoe
V-182 1994 Oxbow Clip, Fuse Plug Research
V-181 1994 Oxbow Field Test and USBR Fuse Plug Research
V-180 1990 Underwater Video, 459,000 cfs small blocks
V-18 0 Federal Highway Flume - Bicyble-Safe Grates/Inlets
V-179 1991 Video of all Overtopping Runs with Concrete blocks and Aluminum Blocks
V-178 1990 Coolidge
V-177 1990 Coolidge-Rough 3/14/90
V-176 1996 Step Out of the Stone Ages. Water Works: A Guide to Effective Water Measurement
V-175 2000 Case Histories and Causes of Failures, Vol 1; Control and Surveillance, Vol 2; Federal Interagency Committee on Dam Safety
V-174 2000 Rapid Drawdown Stability; Vol 1; Filters and Sinkholes, Vol 2; Federal Interagency Committee on Dam Safety
V-173 2000 Methods, Applications, Selection, and Design, Vol 1; Case Histories and Lessons Learned, Vol 2; Federal Interagency Committee on Dam Safety
V-172 2000 Dam Foundations: Geological Features and Investigations, Vol 1 ; Remediation and Assessment, Vol 2, Federal Interagency Committee on Dam Safety
V-171 2000 Construction Techniques
V-170 2000 "CLAWS 2", Chinese Mitten Crabs, video 2, January 1999
V-17 1985 Displacement of Rock Blocks in Unlined Channels - US Army Engineer WES, Geotechnical Lab, Vicksburg, Mississippi - September 1985
V-169 2000 How Water Moves Through Soil
V-168 2000 Zona Regable Genil Cabra
V-167 2000 Embalse de Joaquin Costa, el inicio de un nuevo entendimiento, September 1997
V-166 2000 Vaciado del Embalse de Joaquin Costa, October 1995
V-165 2000 Actiaciones previas al vaciado del Embalse de Joaquin Costa, April 1994
V-164 2000 Under the Great Divide: The Colorado-Big Thompson Project
V-163 1999 Duchesne River Water Users Automate
V-162 1999 Overtopping Facility
V-161 1999 Clark County Departent of Public Works, Flamingo Wash/Winnick Avenue Storm Drain
V-160 1999 Dartmouth Low Level Outlet Works
V-16 1990 Clamshell Gate Operational Tsting Verification of Leakage Rate - February 20, 1990
V-159 1988 Embankment of Overtopping Study
V-158 1992 South Holston Weir
V-157 1988 Rafting
V-156 1999 Fuse Plug Research, Challenge at Glen Canyon, Computer Monitoring of Foundation Grouting
V-155 1978 Angostura Reservoir
V-154 1978 March 1978 Storm
V-153 1990 Understanding Water Measurement
V-152 1999 Jequitai Dam: #1 - Initial Dam, #2 - Roller bucket lowered 4-meters from origl design/topography downstr. of roller bucket mod, #3 - Tooth roller bucket @ Elevation 532; #4 - 1st major modification, Final Config. Tested; #5 - Jequitai Downstr. Dam
V-151 1991 Overtopping Flume
V-150 1999 Duchesne River Water Users Automate
V-15 0 Geomembranes for Emergency Spillways
V-149 1999 In-Place Canal Lining
V-148 1999 A Canal Automation Trilogy
V-147 1999 Water on Demand
V-146 1999 Desalting Equipment for Irrigation
V-145 1996 Water Measurement Flume
V-144 1999 Solar Powered Canal Automation Systems
V-143 1998 Contra Costa Master: Rake and Fish Screen Models
V-142 1998 Physical Model Study - GCID Water Control Structure
V-141 1992 Animas River Cross Sections Near Proposed Durango Pumping Plant
V-140 1984 McPhee Dam #2, 6/21/84
V-14 1984 Glen Canyon Dam: Left Spillway Test 50,000 ft3/s - August 12 1984, Left Spillway Test 15,000 ft3/s - August 11, 1984
V-139 1983 McPhee Model, 11/14/83
V-138 1984 McPhee Dam #1, 6/21/84
V-137 1983 McPhee Dam Spillway Aeration Ramp Study, July 1983
V-136 0 McPhee Boat Chute Model
V-135 1981 Morrow Point Reservoir Model, Slow Motion Film "Currents," March 1981, 2:42
V-134 1981 Morrow Point High Speed Film, 3/81
V-133 1991 Yakima Tieton Diversion Dam Boat Chute 1989, 1990, 1991, Modification #1 and #2, 3/5/91
V-132 1991 Tieton Diversion Dam Boat Chute, Modification #2, 3/5/91
V-131 1989 Tieton Diversion Dam Model Study, 8/89
V-130 1991 Yakima Tieton Test Flows, 3/15/91
V-13 1989 Union Avenue Dam Boatchute Study - September 1989, R-89-12
V-129 0 Tieton
V-128 1983 Glen Canyon Air Slot Study, Tape 2, 10/13/83
V-127 1983 Glen Canyon Air Slot Study, Tape 1, 10/12/83
V-126 0 Union Avenue Boat Chute Protoype
V-125 1989 Boat Chute Tape #1, 5/17/89
V-124 1983 Glen Canyon Ramp #1, 9/29/83
V-123 1983 Glen Canyon Air Slot Study, 10/14/83, Tape 3
V-122 1982 Blue Mesa, 11/14/82 and 12/7/83
V-121 1984 Fuse Plug Model, USCOLD Lecutre, 1/10/84, 5:00 + 3:00
V-120 1983 Number 1A Fuse Plug Embankment, 2/14/83
V-12 0 Union Avenue Boat Chutes Stock Footage for News Promo
V-119 1983 Number 8 Fuse Plug Test, 6/7/83
V-118 1983 Number 6 Fuse Plug, 4/11/83
V-117 1983 Number 5 Fuse Plug Test, 4/4/83
V-116 1983 Number 4 Fuse Plug Embankment, 3/23/83
V-115 1983 E&R Construction of Glen Canyon Spillway Model, 9/1/83
V-114 1983 Number 3 Fuse Plug Embankment, 3/10/83
V-113 1983 Number 1 Fuse Plug Embankment, 2/14/83
V-112 0 Dolores Project, Colorado, McPhee Dam Spillway Test, 11:00
V-111 1983 Number 2 Fuse Plug Embankment, 2/28/83, 34:00
V-110 0 Ochoco Dam - Spillway Operation After Modifications
V-11 0 Boat Chute - 9 News, Lab news recording
V-109 1996 Water: National Geographic on Assignment
V-108 1995 Canal System Operation, Control, and Automation, 1995 Water Management Workshop, 60:00
V-107 1994 Keswick Dam Model Study, 1:30 Scale
V-106 1997 Hydraulic Model Study of Ochoco Dam Spillway Modifications and Stilling Basin Design
V-105 0 Foz Do Areia Dam (Lab), 11:00
V-104 0 Atmosphere Model Tests, 11:00
V-103 0 Gen. View Atmosphere Model, 5:00
V-102 1981 Daule Peripa, 1981, 11:30
V-101 1996 A Canal Automation Trilogy (1. Before Automation Melodrama, 2. Solar Powered Canal Automation, 3. Water on Demand)
V-100 1996 Saguenay River Flood Footage, July 1996
V-10 1992 Union Avenue Boat Chutes Dedication, Bureau of Reclamation, April 22, 1992
V-1 1986 Part 1 - Auburn Upstream Cofferdam Failure, American River, Part 2 - Folsom Dam-Nimbus Dam, American River, discharging 125,000 cfs, February 1986
TR-996 1951 Coordination of Corps-Bureau construction program: Folsom Unit; American River Div.; CVP. (Jan. 3, 1951)
TR-99-32 1999 Travel to Malta, Montana and Vicinity
TR-99-31 1999 Travel to Albuquerque, New Mexico
TR-99-30 1999 Travel to Phoenix, Arizona to Present Reclamation's Booth in the Conference Exhibit, and to attend sessions at the Workshop.
TR-99-29 1999 Travel to Tucumcari, New Mexico to Provide Water Measrement Assistance to the Arch Hurley Water Conservancy Irrigation Project
TR-99-28 1999 Travel to Tucumcari, New Mexico to Provide Water Measurement Assistance to the Arch Hurley Water Conservancy Irrigation Project
TR-99-27 1999 Flatiron Powerplant Turbine Air Vent and Penstock Vibration Testing
TR-99-26 1999 Embankment Dam Breach Tests at Agricultural Research Service Hydraulics Laboratory - Stillwater, Oklahoma.
TR-99-25 1999 Travel to East Bench Irrigation District in Dillon, Montana to Install Aditional Control System Equipment and Software, to Provide any Other Customer Service to Help the Project be Successful
TR-99-24 1999 Travel to Graz, Austria to Attend and Participate in Section Meetings of the Hydraulic Structures, Hydraulic Instrumentation, and Hydraulic Modeling Sections.
TR-99-23 1999 Trip to Graz, Austria to attend and participate as co-convener of the Theme Area - Hydraulic Structures in the XXVIII IAHR Congress in Graz, Austria.
TR-99-22 1999 Travel to Skookum Creek Fish Hatchery and Diversion Structure near Acme, WA
TR-99-21 1999 Travel to Redding, California
TR-99-20 1999 Installation of Automation Equipment at East Branch Irrigation District in Dillon, Montana
TR-992 1950 Field trip to Friant Dam; operation of Madera Canal; CVP. (Dec. 28, 1950)
TR-99-19 1999 Travel to Tucumcari, New Mexico, to Provide Water Measurements Assistance to the Arch Hurley Water Conservancy Irrigation Project
TR-99-18 1999 Travel to Tucumcari, New Mexico, to provide Water Measurements Assistance to the Arch Hurley Water Conserancy Irrigation Project
TR-99-16 1999 Air Vent Tests at Willow Creek Dam - Sun River Project, Montana, May 10-12, 1999
TR-99-15 1999 Travel to Navajo Indian Irrigation Project, May 3-5, 1999
TR-99-14 1999 Travel to Nimbus Dam and Fish Hatchery in Folsom, California, June 7-11, 1999
TR-99-13 1999 Travel to Socorro, New Mexico, to Collect Velocity Profile Data on the Rio Grande Low Flow Conveyance Channel, June 7-9, 1999
TR-99-12 1999 Travel to Durango, Colorado, and Hammond Conservancy District, June 1-3, 1999
TR-99-11 1999 Travel to Sacaton, Arizona, March 23-24, 1999
TR-99-10 1999 Meeting with Environmental Protection Agency (EPA) to Discuss Their Columbia River Temperature Modeling Program, February 10-11, 1999
TR-99-09 1999 Site Visit To Yuma Area Office, January 25-27, 1999
TR-99-08 1999 Travel to Potential Site for the Concrete Block Embankment Protection System, January 6-7, 1999
TR-99-04 1998 Visit to East Bench Irrigation District in Dillon, Montana, November 9-10, 1998
TR-99-03 1998 Presentation to the Arizona Water Protection Fund for a Fluvial Geomorphology Study of the Gila River, November 19, 1998
TR-99-02 1998 Attendance at the "Bridging the Headgate" Partnership Workshop, Albuquerque, New Mexico, October 28-30, 1998
TR-99-01 1998 Attendance at System Configuration Team (SCT) and Technical Meetings for Grand Coulee Dam, Portland, Oregon, October 21 and 22, 1998
TR-990 1950 Dec. 1950 Meeting of Missouri River Sediment Advisory Board; U.S. Engineering Dept.(Dec. 20, 1950)
TR-986 1950 Inspection of USBR Exhibit in the Museum of Science and Industry. Chicago, Ill. (Dec. 4, 1950)
TR-98-25 1998 Site Visit to Bear Creek Diversion Dam - Medford, Oregon; Attendance at Meeting to Discuss Alternatives for Reducing Fish Entrainment at the A-Canal Headworks on Upper Klamath Lake - Klamath Falls, Oregon, September 29 to October 1, 1998
TR-98-24 1998 Travel to Ogden, Utah, for Work on South Ogden Highline Canal, September 1-2, 1998
TR-98-23 1998 Participation in the First Interregional Conference on Environment - Water: Innovative Issues in Irrigation and Drainage Organized by the Portuguese National Committee of the International Commission on Irrigation and Drainage (ICID) (Control Number 112)
TR-98-22 1998 Travel to Vernal, Utah, September 1-4, 1998
TR-98-21 1998 Travel to Klamath Falls, Oregon, for Collection of ADCP and ADV Velocity Data to Support A-Canal Fish Screening Projects, and to Review Water Measurement Needs on the Klamath Project, September 14-17, 1998
TR-98-20 1998 Trip to Madrid, Spain - Control No. 70 (Burgi), No. 71 (Pugh), No. 72 (Mefford), June 8-17, 1998
TR-982 1950 Trip to Colo. A&M Col., Fort Collins, Oct. 12, 1950, to discuss design of turbulence trough apparatus. (Nov. 27, 1950)
TR-98-19 1998 Travel to Phoenix, Arizona, and Pima-Maricopa Irrigation Project (P-MIP), July 14-16, 1998
TR-98-18 1998 Controlotron Flowmeter Evaluation, BIg Thompson Powerplant Near Loveland, Colorado, August 12 and 19, 1998
TR-98-17 1998 Travel to Phoenix, Arizona, and Pima-Maricopa Irrigation Project (P-MIP), August 19-20, 1998
TR-98-16 1998 Travel to Klamath Falls, Oregon
TR-98-15 1998 Controlotron Flowmeter Installation, Ogden, Utah, July 6-7, 1998
TR-98-14 1998 Travel to Socorro, New Mexico, to Collect Velocity Profile Data on the Rio Grande Low Flow Conveyance Channel, May 26-28, 1998
TR-98-13 1998 Inspection of the Pump-Turbine Units at Senator Wash Dam, LC Region, May 27-28, 1998
TR-98-12 1998 Tour of Mid-Columbia Dams and Dissolved Gas Team/System Configuration Team Meetings at Grand Coulee Dam, Washington, May 19-22, 1998
TR-98-11 1998 Travel to Upper Klamath Lake, Oregon, May 11-13, 1998
TR-98-10 1998 Travel to Phoenix, Arizona, and Pima-Maricopa Irrigation Project (P-MIP), April 20-23, 1998
TR-98-09 1998 T&Y Diversion Dam Fish Barrier, April 1-3, 1998
TR-98-08 1998 Travel to Headgate Rock Dam and Colorado River Indian Irrigation Project, March 24-26, 1998
TR-98-07 1998 Travel to Give a Presentation on WRRL's Physical Modeling Experience to Portland General Electric's Subcommittee to the Fisheries Advisory Committee for Relicensing the Pelton Round Butte Project, March 17, 1998
TR-98-06 1998 Travel to Give a Presentation to the System Configuration Team (SCT) on the Preliminary Structural Alternatives for Total Dissolved Gas Abatement at Grand Coulee Dam, February 17-18, 1998
TR-98-05 1998 Travel to Gila River Indian Community (GRIC), January 21-23, 1998
TR-98-04 1998 Travel to Tracy, California, January 13-15, 1998
TR-98-03 1997 Tidal Flow Measurement on the Contra Costa Water District's (CCWD) Canal at Rock Slough, Near Brentwood, California, December 2-3, 1997
TR-976 1950 Report on field performance tests of all units installed in Burbank Pumping Plant; CBP. (Oct. 17, 1950)
TR-974 1950 Attendance at meeting of the Hydraulic Div. of the ASCE at Jackson, Miss. (Nov. 8, 1950)
TR-973 1950 Attendance at annual meeting of ASCE in Chicago, Ill. (Nov. 8, 1950)
TR-97-26 1997 Travel to Gila River Indian Community (GRIC), September 15-16, 1997
TR-97-25 1997 Travel to Alamosa, Colorado, to Troubleshoot Flowmeter, Gate Control, and Water Level Sensor Problems on the Closed Basin Project
TR-97-24 1997 Removal of Cascade Dam, Yosemite National Park, in cooperation with the Federal Highways Administration and the National Park Service, July 15-18, 1997
TR-97-23 1997 Trip to Boise, Rupert, and Twin Falls, Idaho
TR-97-22 1997 Trip to Navajo Indian Irrigation Project to Provide Technical Assistance with Canal Operations
TR-97-21 1997 Site Visit to Folsom Dam and Inspection of Lower Level Outlet Works, May 20-21, 1997
TR-97-20 1997 Trip to Morocco and France (Control No. 151, Hansen; Control No. 152, Rogers), April 19 to May 3, 1997
TR-97-19 1997 Travel to Socorro, New Mexico, to Collect Velocity Profile Data on the Rio Grande Low Flow Channel, June 4-6, 1997
TR-97-18 1997 Site Reviews of Six Wasteways in the Middle Rio Grande Conservancy District to Address Flow Measurement and Recording, New Mexico, April 23-24, 1997
TR-97-17 1997 Travel to Red Bluff, California, for Evaluation of Research Pumping Plant Intake Structure and River Hydraulics, March 27-29, 1996
TR-97-16 1997 Investigative Trip to Grand Coulee Dam Prior to Performing Total Dissolved Gas Tests in the River, March 5-7, 1997
TR-97-15 1997 Travel to Gila River Indian Community (GRIC), February 19-20, 1997
TR-97-14 1997 Travel to ARS Hydraulic Laboratories
TR-97-12 1997 Attendance at System Configuration Team Meeting for the Columbia and Snake River Systems.
TR-97-11 1996 Quillayute River Field Reconnaissance Trip and Scope of Work Meetings.
TR-97-09 1997 Travel to Redding, California Meeting Concerning the Shasta Lake Studies (TCD Evaluation and Impacts on Lake Ecology)
TR-97-08 1996 Travel to Raleigh, North Carolina, to Review Dam Failures and Overtopping Events Associated With Hurricane Fran, North Carolina Department of Environment, Health, and Natural Resources, December 11-13, 1996
TR-97-07 1996 Fish Passage Structures on the Colorado River, Price-Stubb Diversion Dam, Grand Junction Office, Price-Stubb Diversion Dam, November 18, 1996
TR-97-06 1996 Travel to Gila River Indian Community (GRIC), Department of Land and Water Resources, Sacaton, Arizona, November 12, 1996
TR-97-05 1996 Field Trip to Redding, California, to Participate in a Research Project Entitled "Effects of Plunging Inflows on Reservoir Hydrodynamics and Downstream Releases." This Project was Conducted by UC-Davis Environmental Engr. Dept., August 18-21, 1996
TR-97-03 1996 Site Reviews of the Middle Rio Grande Conservancy District and the Pojoaque Valley Irrigation District to Address Flow Measurement and Automation Issues, New Mexico, October 21-24, 1996
TR-97-02 1996 Travel to Instituto Mexicano de Technologia del Agua (IMTA) and Attendance at the XIV Mexican National Congress of Hydraulics, October 17-28, 1996, Cuernavaca and Acapulco, Mexico - Control No. 107
TR-97-01 1996 Flowmeter Installation for Summitville Mine, Water Treatment Facility, Sludge Underflow Line, Del Norte, Colorado, October 2-3, 1996
TR-96-9 1996 Grand Prairie Area Demonstration Project - Arkansas - US Army Corps of Engineers - Memphis District Office, February 5-7, 1996, Memphis, Tennessee
TR-96-8 1995 Travel to Twin Falls, Idaho, to Evaluate Sites on the Twin Falls Canal for Automation Using Sutron Equipment, November 7-8, 1995
TR-96-7 1996 Trip to Phoenix, Arizona, and San Luis Obispo, California, December 11-13, 1995
TR-96-6 1996 Muddy Creek Demonstration Stream Restoration Research Project: Phase II Construction Progress Report, Vaughn, Montana, December 16-22, 1995
TR-96-5 1995 ASCE Management Group D Meetings, Washington, D. C., and IV Jornadas Sobre Encauzamientos Fluviales (4th Seminar on River Channelization) - Madrid, Spain - Control No. 019, November 17-28, 1995
TR-96-4 1995 Presentation of Granite Reef Hydraulic Model Study Results and Meeting with Newlands Project Office on Water Measurement Demonstration Project, November 28-29, Phoenix, Arizona; Fallon, Nevada
TR-96-38 1996 Red Bluff Diversion Dam Existing West Bank Fish Ladder Hydraulic Evaluation, August 5-9, 1996
TR-96-37 1996 Report on Travel to River Restoration '96 at Silkeborg, Denmark, September 8-14, 1996
TR-96-36 1996 Flow Measurement Demonstration Project, Newlands Project, Fallon, Nevada, August 21-22, 1996
TR-96-35 1996 Trip to Navajo Indian Irrigation Project to Provide Technical Assistance With Canal Operations, July 29-31, 1996, Farmington, New Mexico
TR-96-34 1996 Northwest Screen Tour, June 4-6, 1996
TR-96-33 1996 Travel to Instituto Mexicano de Tecnologia del Agua (IMTA) (Departmental Control Number 092), September 4-7, 1996
TR-96-32 1996 Tour of Erosion Problems Near St. Mary, Montana, June 18-20, 1996
TR-96-31 1996 Trip to Greenfields Irrigation District to Evaluate Canal System Operations, July 10 and 11, 1996
TR-96-30 1996 Red Bluff Diversion Dam Fish Passage Program and Quarterly Interagency Fisheries Team (IFT) Meeting, July 9-11, 1996
TR-96-3 1995 Attendance at 19th Interagency Research Coordination Conference (IRCC), Vicksburg, Mississippi, October 17-19, 1995
TR-963 1950 Hydraulic performance of spillway and river outlets; Shasta Dam; CVP. (Oct. 17, 1950)
TR-96-29 1996 Travel to Blue Mesa Reservoir Near Gunnison, Colorado, to Collect Acoustic Doppler Current Profile Data Near the Penstock Intakes, July 7-10, 1996
TR-96-28 1996 Outlet Works Emergency/Guard Gate Tests Under Unbalanced-Head Conditions at Wanship Dam, June 20, 1996
TR-96-27 1996 Travel to San Luis Valley Project, Closed Basin Division, Alamosa, Colorado, June 19-20, 1996
TR-96-26 1996 Travel to Grand Junction, Colorado - Government Highline Canal, July 9-11, 1996
TR-96-25 1996 Field Trip to Redding, California, to Participate in a Research Project Entitled "Effects of Plunging Inflows on Reservoir Hydrodynamics and Downstream Releases." This Project was Conducted by UC-Davis, Environmental Engr. Dept., June 9-14, 1996
TR-96-24 1996 Gila River Field Trip, June 10-12, 1996
TR-96-23 1996 Flow Measurement Device at Site NT22, Newlands Project, Fallon, Nevada, June 16-17, 1996
TR-96-22 1996 Travel to Provo Area Office to Assist with Water Measurement Activities, July 28 to August 1, 1996
TR-96-21 1996 Attend and Participate in the International Association for Hydraulic Research (IAHR) Council Meeting, Chatou (near Paris), France - Control No. 049, June 5-11, 1996
TR-96-20 1996 Gila River Field Trip, April 10-12, 1996
TR-96-2 1995 Navajo Indian Irrigation Project Canal Operations, October 16-17, 1995
TR-96-19 1996 PG&E Potter Valley Fish Screen Facility Tour, May 16, 1996
TR-96-18 1996 Foreign Travel for Technical Exchange With the National Laboratories of Civil Engineering (LNEC) and the Technical University of Lisbon (IST) in Portugal, and the Center for Study and Experimentation of Public Works (CEDEX) in Spain (Control No 032)
TR-96-17 1996 Meeting to Discuss the Scope of Work for the Folsom Dam Stilling Basin Rehabilitation, May 21-22, 1996
TR-96-16 1996 Travel to Ogden, Provo, and Vernal, Utah, April 22-24, 1996
TR-96-15 1996 Travel to Ogden, Utah, to Install an Ultrasonic Flowmeter with Provo Area Office Staff, April 21-23, 1996
TR-96-13 1996 Travel to Provo Area Office and Water Measurement Sites in Central Utah, March 19-20, 1996
TR-96-12 1996 Attendance at ICODS (Interagency Committee on Dam Safety) Dam Breach Seminar, Emmitsburg, Maryland, Feb. 20-22, 1996
TR-96-11 1996 Present Results of Dissolved Gas Study for Grand Coulee Dam to the Regional Office Personnel and Attend Corps of Engineers Seminar on Water Quality, Feb. 27-Mar. 1, 1996
TR-96-10 1996 Field Trip to Tracy Fish Collection Facilities, Tracy, California, February 12-15, 1996
TR-96-1 1995 Travel to Woodland, California, for a Coordination Meeting and Field Data Collection for the Wilkins Slough Hydraulic Model Study, October 16-18, 1995
TR-960 1950 Study of surges in pipelines; Coachella Valley Distribution System; All-American Canal System. (Oct. 2, 1950)
TR-95-26 1995 Field Trip to Collect Near- and Far-field Velocity Measurements at the Pelger Mutual Fish Screens, August 13-18, 1995
TR-95-25 1995 Trip to Harlem, Montana to Examine a New Type of Overshot Gate with Enhanced Flow Measurement Capability and Evaluate its Performance and Potential for use on Government Highline Canal...., September 27, 1995
TR-95-24 1995 XXVI Congress of the International Association for Hydraulic Research (IAHR) - Great Britain - Control No. 083, August 31 - September 21, 1995
TR-95-23 1995 Muddy Creek Demonstration Stream Restoration Project, September 13-15, 1995
TR-95-22 1995 Red Rock River Archaeological Preservation Project, August 27-28, 1995
TR-95-21 1995 Travel to Twin Falls Canal Company, Twin Falls, Idaho, September 11-12, 1995
TR-95-20 1995 Travel to Provo Area Office for Water Automation Activities, August 27 - September 1, 1995
TR-952 1950 Final hydrostatic pressure test on the welded steel penstock system: Anderson Ranch Dam; Boise Project (Sept. 12, 1950)
TR-95-19 1995 Travel to Instituto Mexicano de Tecnologia del Agua (IMTA) - Control No. 091, September 5-9, 1995
TR-95-18 1995 Travel to Ochoco Dam, Prineville, Oregon, to acquire field velocity data in and around sinkhole.
TR-95-17 1995 Tour of Alamosa River and Meeting with Alamosa River Watershed Planning Committee, August 3-4, 1995
TR-95-16 1995 Travel to Red Bluff, California, for Evaluation of Research Pumping Plant Intake Structure and River Hydraulics, July 16-19, 1995
TR-95-15 1995 Travel to Ogden, Utah, to Intstall an Acoustic Flowmeter in Coordination with Roger Hansen from the Provo Area Office, August 2-3, 1995
TR-95-14 1995 Travel to Provo, Utah, to Confirm Calibration of Ramp Flume on Strawberry Highline Canal, July 17-18, 1995
TR-95-13 1995 Tour of Alamosa River and Meeting with Alamosa River Watershed Planning Committee, June 15-16, 1995
TR-95-12 1995 Field Review Trip of Mirdan and Fullerton Canals, June 12-14, 1995
TR-95-11 1995 Pineview Canal Automation Plan, May 22-23, 1995
TR-95-10 1995 Gila River Irrigation Project, Preliminary Lateral System Design, April 12-13, 1995
TR-95-09 1995 Travel to Redding, California for Coordination Meeting Concerning the Shasta Lake Biological Study, April 5-7, 1995
TR-95-08 1995 Travel to Provo, Utah to Evaluate Flow Measurement Sites on Strawberry Water Users Association Canal System, March 20-21, 1995
TR-95-07 1995 Navajo Indian Irrigation Project (NIIP) Standing Operating Procedures Workshop, February 22-24, 1995
TR-95-06 1995 Travel to Salt Lake City and Richfield, Utah, January 18-19, 1995
TR-95-05 1994 Water Measurement on the Newlands Project, November 2-3, 1994
TR-95-04 1995 Field Test of the 60-inch Clamshell Gate at the Salt River Siphon Replacement, January 9-10, 1995
TR-95-03 1995 Gila River Irrigation Project, Concept Design Review, January 19-20, 1995
TR-95-02 1994 Travel to Brigham City and Ogden, Utah, November 21-23, 1994
TR-95-01 1994 Travel to The Netherlands to Lecture on Reclamation's Fuse Plug Research and Observe Full Scale Dike Breach Test - Control Number 005, October 4-9, 1994
TR-950 1950 Field measurements; Sacramento-San Joaquin Delta; CVP. (Oct. 11 1950)
TR-94-7 1993 Soil Conservation Service/Bureau of Reclamaton Coordination Meeting on Water Conservation, November 9-10, 1993
TR-94-6 1993 Visit to Regional Office, Salt Lake City, Utah, and Utah State University, November 29-30, 1993
TR-94-5 1993 Field Trip to Northern Mississippi for Evaluating Erosion Control Structure Program of U.S. Army Corps of Engineers and Monitoring Program by Colorado State University, November 16-17, 1993
TR-94-4 1993 National Biological Survey Fish Passage Workshop, Turners Falls, Massachusetts, December 1-3, 1993
TR-944 1950 Report on field performance tests of Punping Unit 1 installed in Pasco Pumping Plant; CBP. (Sept. 22, 1950)
TR-94-37 1994 Gila River Irrigation Project, Septebmer 19-21, 1994
TR-94-35 1994 Government Highline Canal Operation and Rehabilitation, Septebmer 12, 1994
TR-94-34 1994 Flow Technology Lecture to Imperial Dam Advisory Board and Acoustic Doppler Current Profiler Demonstration st Shasta Dam, California, September 19-22, 1994
TR-94-31 1994 Travel to Provo, Rickfield, and Brigham City, Utah, for Water Automation Activities, September 6-9, 1994
TR-943 1950 Trip to Fort Collins regarding contract for turbulence jar studies. (Sept. 25, 1950)
TR-94-29 1994 Travel to Tracy Fish Collection Facilities, August 1-3, 1994
TR-94-24 1994 Rotor Stress Tests on Unit 2, Folsom Powerplant, May 23-26, 1994
TR-94-23 1994 Travel to Provo, Utah (Strawberry Highline Canal Inflatable Gate Controller), July 20-22; June 7-8; and May 16-18, 1994
TR-94-20 1994 Strain Gage Installation at Folsom Powerplant, April 25-27, 1994
TR-94-2 1993 EMRC's (Engineering Mechanics Research Corporation) Finite Element Program Training, October 17-23, 1993
TR-94-19 1993 Ring-Follower Gate Tests, October 18-19, 1993
TR-94-17 1994 Shop Testing - 78-inch Clamshell Gate for Salt River Siphon Replacement, EBCO Industries, Ltd., Richmond, British Columbia, Canada, March 2-4, 1994
TR-94-16 1994 Strain Gage Testing of Wicket Gate Linkages at Hungry Horse Powerplant - Attendance at Northwest Power Pool Conference in Great Falls, Montana, March 20-24, 1994
TR-94-14 1994 Field Trip to Elephant Butte Reservoir, New Mexico, February 13-17, 1994
TR-94-10 1994 Meeting of Provo River Technical Subteam to Discuss Implementation of Reaeration of Turbine Flows through Deer Creek Powerplant, February 3-4, 1994
TR-94-1 1993 Travel to Muddy Creek near Great Falls, Montana, October 6-7, 1993
TR-93-9 1992 Hungry Horse Wicket Gate Bushing Inspection - Kalispell, Montana - December 9-10, 1992
TR-93-8 1992 Underwater Inspection of Facilities Pueblo Dam Pueblo, Colorado - November 17, 1992
TR-93-7 1992 Locating Field Transects for Flushing Flow Studies, Grand Junction, Colorado - November 18-19, 1992
TR-93-6 1992 1992 O&M Conference - Folsom, California - October 19-23, 1992
TR-93-43 1993 Canal Automation Sites, Utah, Septebmer 22-23, 1993
TR-93-42 1993 Field Testing a Controlotron Model 990 Transit-Time Flowmeter at Davis Dam, Bullhead City, Arizona, August 23-25, 1993
TR-93-41 1993 Foreign Travel - Tokyo, Japan - Participate in the International Association for Hydraulic Research XXV Congress - Control No. 078 - Tokyo and Tsukuba, Japan - August 26 - September 4, 1993
TR-93-40 1993 Field Test of Dissolved Oxygen Enhancement Alternatives for Deer Creek Powerplant, Provo River Project - Upper Colorado Region - Park City, Utah - August 8-15, 1993
TR-934 1950 Report on Field performance test of three pumping units installed in Pumping Plant "F"; Modoc Unit; Klamath Project (Sept. 11, 1950)
TR-93-39 1993 Guard/Emergency Gate Tests at Navajo Dam - Farmington, New Mexico - August 9-12, 1993
TR-93-38 1993 Field Calibration of Two 90-inch Jet-flow Gates at Theodore Roosevelt Dam, Arizona - Phoenix and Globe, Arizona - August 4-5, 1993
TR-93-36 1993 Bumping Lake Gate Tests - Yakima, Washington - July 26-27, 1993
TR-93-35 1993 Travel to San Francisco to Coordinate 1994 ASCE Symposium; Price, UT, to Tour Irrigation and Automation Facilities in Emery and Carbon Counties; Richfield, UT, to Discuss Water Conservation Research by Utah State Univ. - July 25-30, 1993
TR-93-34 1993 Travel to Red Bluff, California, to Implement Velocity Instrumentation for Hydraulic Evaluation of the Tehama-Colusa Canal Angled Drum Screen Facility - Red Bluff, California, July 21-27, 1993
TR-93-31 1993 Travel to Colorado State University, Fort Collins, Colorado, to Assist in Second Round of Testing for Tennessee Valley Authority Autoventing Turbine Research, Fort Collins, Colorado, July 12-16, 1993
TR-93-30 1993 Flushing Flow Field Tests - Grand Junction Projects Office, Grand Junction, Colorado, June 29-July 1, 1993
TR-93-28 1993 NATO Advance Study Institute - Pullman, Washington, June 25-July 11, 1993
TR-93-26 1993 Stewart Lake Drought Relief Study - Vernal, Utah, June 23-25, 1993
TR-93-25 1993 Pretransfer Inspection of McPhee Dam and Great Cut Dike from Construction Status to Operation and Maintenance by the Dolores Water Conservancy District - Dolores Project, Colorado - Cortez, Colorado - June 14-17, 1993
TR-93-23 1993 Strain Gage Testing of Wicket Gate Linkages at Palisades Powerplant - Jackson, Wyoming - May 10-11, 1993
TR-93-22 1993 Testing at Sandario Pumping Plant, May 10-11, 1993
TR-93-21 1993 Bretch Diversion Dam Telemetry System - Mountain Park Project - Mountain Park, Oklahoma - April 19-22, 1993
TR-93-20 1993 Shasta Temperature Control Device - Washington, D.C., March 24-26, 1993
TR-93-2 1992 Interagency Conference on Hydraulic Laboratory Techniques and Instrumentation - October 7-9, 1992
TR-93-19 1993 Steering Committee Meeting for 18th Interagency Research Coordination Conference - Glenstone, Tennessee and Norris, Tennessee - March 22-24, 1993
TR-93-15 1993 Operation of River Outlets at New Waddell Dam - Phoenix, Arizona - February 1-2, 1993
TR-93-14 1993 Base Sediment Samples and Prioritize Project Field Work in Terms of Limited Funding - Flushing Flow Studies - Grand Junction, Colorado - January 19-22, 1993
TR-93-12 1992 Trip to Redding, California, for Town Meeting and a Meeting with Shasta Office Personnel - Shasta Projects Office, Redding, California, and Lewiston and Whiskeytown Reservoirs, December 16-17, 1992
TR-93-11 1992 Operating Tests of Jet-Flow Gates - Contract/Specifications O-CC-32-01480/DC-7827 - Theodore Roosevelt Dam, Salt River Project, Arizona - December 7-8, 1992
TR-93-10 1992 Shasta Temperature Control Device - Sacramento, California - December 7, 1992
TR-92-9 1992 Foreign Travel - Egypt - Observe and Consult with the Staff of the Hydraulic and Sediment Research Institute, Water Research Center - January 17-31, 1992
TR-929 1950 Field trip to Sacramento and vicinity; seepage measurements; LCCL Program; Orland and CVP. (Aug. 25, 1950)
TR-92-8 1992 Scouring of Spawning Beds, EE041, Gunnison and Colorado Rivers near Grand Junction - January 6-8,'92
TR-92-7 1992 Stress Measurements on the Turbine Runner of G23 - Grand Coulee Dam - December 8-12, 1991
TR-927 1950 Field trip to North Platte Project to obtain sedimentation information on Sheep Creek Desilting Basin. (Aug. 23, 1950)
TR-92-5 1992 Travel to Grand Junction to Investigate Automation and Control of the Government Highline Canal - Grand Junction, Colorado - November 21-22, 1991
TR-925 1950 Downpull tests on Hoover Dam intake tower cylinder gates; Boulder Canyon Project (Aug. 16, 1950)
TR-92-40 1992 Use of Phneumatic Diffuser for Cold Water Access at Shasta Dam - Election of Site for Carr Powerplant Tailrace Curtain, September 30, 1992
TR-92-4 1992 Cavitation Detection on Turbine Runners Using Magnetrostrictive Sensors - Silver Spring, Maryland - November 14-15, 1991
TR-92-39 1992 Automatic Canal Controllers - West End Government Highline Canal - Grand Junction, Colorado - September 28-30, 1992
TR-92-36 1992 Lake Estes, Olympus Dam Stilling Basin, and Estes Powerplant Tailrace - Underwater Inspection of the Communications Cable
TR-92-35 1992 Lower Colorado River Accounting System Acoustic Flowmeter Examinations at Hoover, Davis, and Parker Dams and Havasu Pumping Plant - September 14-17, 1992
TR-92-32 1992 Flow Measurement Tests at Vallecito Dam - Durango, Colorado, July 28-29, 1992
TR-92-30 1992 Visit to Center for Studies and Experimentation of Public Works in Spain and Institute of Hydrotechnics and Amelioration, Sofia, Bulgaria to Discuss Cooperative Water Resource Research and Management Activities - June 15-24, 1992
TR-92-3 1992 Strain Gage Installation on the Runner of G-23 at Grand Coulee Third Powerhouse - Grand Coulee Dam, Washington - November 17-22, 1991
TR-923 1950 Report on field trip to select reaches of canal for lining; Wyoming Canal; Sta. 1660 to 2560; Laterals of the North Pavillion and North Portal areas and Pilot Canal; Riverton Project, Wyoming (Aug. 16, 1950)
TR-92-28 1992 Site Visit to Animas River at Future Site of Pumping Plant, Durango, Colorado - July 28, 1992
TR-92-27 1992 Flow Measurement Tests at Vallecito Dam - Durango, Colorado, July 28-29, 1992
TR-92-22 1992 U.S. Army Corps of Engineers Waterways Experiment Station, Vicksburg, Mississippi - June 14-18, 1992
TR-92-21 1992 Site visit of the Horseshoe Dam Service and Auxiliary Spillway Areas, Salt River Project, Phoenix, Arizona, April 2, 1992
TR-92-20 1992 Underwater Inspection of Estes Lake Communications Cable Site, Lake Estes, Estes Park, Colorado, May 6-8, 1992
TR-92-2 1992 Foreign Travel to the First International Symposium on Roller Compacted Concrete, Beijing, China, and A.T. Richardson
TR-922 1950 Report on field performance tests of two pumping units (No. 4 and 5) installed in Pumping Plant "D"; Modoc Unit; Klamath Project (Aug. 15, 1950)
TR-92-18 1992 Examination of Outlet Gates at Cle Elum Dam, Yakima Project, Washington - April 14-16, 1992
TR-92-14 1992 Testing of Outlet Works, Prebid Conference, and Site Review at Coolidge Dam - San Carlos Irrigation Project (BIA) - Arizona - March 10-13, 1992
TR-92-11 1992 Attendance at North American Hydro Research and Development Forum, Renewable Energy Technology of the 21st Century February 22-26, 1992
TR-92-10 1992 Travel to Norris, Tennessee, for Auto-Venting Turbine Research Workshop
TR-92-1 1992 Second Technical Exchange Meeting with the Japan Dam Engineering Center, Tokyo, Japan - November 2-18, 1991
TR-91-9 1991 Travel to Austin to Plan Technical Conference on Water Conservation - Austin, Texas - May 13-14, 1991
TR-91-8 1991 Yellowtail Dam - Spillway Inspection - Hardin, Montana - May 7-9, 1991
TR-91-7 1991 Bretch Diversion Dam Telemetry System - Mountain Park Project, Oklahoma - April 8-9, 1991
TR-91-6 1991 Signature Tests at Grand Coulee Dam Third Powerplant - Grand Coulee Dam, Washington - December 9-14, 1990, April 21-26, 1991
TR-91-5 1991 Field Test of the Central Arizona Project/ Salt River Project Interconect and Observations on Air Entrainment at the Intakes of the Salt River and Agua Fria River Siphons - Phoenix, Arizona April 9-11, 1991
TR-91-4 1991 Inspection of Winter-Kennedy Taps in Units 2 and 3 at Glen Canyon Powerplant
TR-91-3 1991 Canal Automation Training at California Polytechnic State University - March 27-29, 1991
TR-91-2 1991 Cooperative Research Opportunities with the Agricultural Research Service - Phoenix, Arizona January 23, 1991
TR-91-19 1991 Meeting of Consultant Review Board, Bartlett Dam, Salt River Project, Phoenix, Arizona - August 26-30, 1991
TR-91-18 1991 Consulting on Centerhill Dam Fuse Plug Spillway for the Corps of Engineers - September 10-12, 1991
TR-91-17 1991 Travel to Madrid, Spain - September 5-17, 1991
TR-91-16 1991 Automation Equipment for use on the Sevier River, DMAD Reservoir and Associated Canal System, Logan, Utah - August 6-7, 1991
TR-91-15 1991 Operational Testing of 30-inch Clamshell Gate at Grassy Lake Dam - Upper Snake River Division - Mindoka Project, Idaho-Wyoming - July 15-16, 1991
TR-91-12 1991 Installation of Surge Detector Equipment - Blue Mesa Powerplants - Colorado River Storage Project, Colorado - June 10-12, 1991
TR-91-11 1991 unknown
TR-91-10? 1996 Travel to Yuma, Arizona, to provide assistance with water measurement issues in the Yuma area.
TR-91-10 1991 Training - Instrumentation Testing Association's (ITA) Flow Instrumentation - Sacramento, Calif. - May 15-17, 1991
TR-91-1 1991 Autoventing Turbine Research Coordination Meeting - Iowa Institute of Hydraulic Research, Iowa City, Iowa - December 10-12, 1990
TR-90-9 1990 Site Visit Central Arizona Project - Water Technology and Environmental Research Project, July 6, 1990
TR-90-7 1990 Site Visit to Grand Coulee Project, May 14-15, 1990
TR-90-6 1990 Summary of Venturi Meter Calibration at Current Creek Dam, Utah, April 23-26, 1990
TR-90-3 1990 Attendance at the American Concrete Institute Annual Meeting, Toronto, Ontario, Canada, March 18-23, 1990
TR-90-2 1990 Field Test at Blue Mesa Dam - Water Technology and Environment Research Project, May 21, 1990
TR-90-14 1990 Examination of the Two Damaged Sleeve Valves and Overflow Channel at Upper Stillwater Dam , Central Utah Project, Bonneville Unit, Utah, August 6-7, 1990
TR-90-13 1990 Review of Water Measurement Program on the Wapato Irrigation Project [Bureau of Indian Affairs (BIA) Project], Wapato, Washington, August 27-30, 1990
TR-90-11 1990 of Employment and Training, Western Navajo Agency, Tuba City, Arizona, July 16-18, 1990
TR-90-10 1990 Vibration Measurements on the Outlet Works Pipe at Platoro Dam, July 25, 1990
TR-898 1950 Stable channel study on San Luis Valley Irrigation Canals; sedimentation program. (July 25, 1950)
TR-89-44 1989 Attend Roosevelt Diversion Dam Rededication Ceremony, Phoenix, Arizona, November 28-29, 1989
TR-89-42 1989 Site Visit - Tieton Dam - Yakima Project, Washington - November 8-9, 1989
TR-89-40 1989 Strain Gage Measurements at Jackson Lake Dam, Wyoming, October 12-13, 1989
TR-89-39 1989 Travel to American Falls Dam, Idaho, Oct.4&5, 1989
TR-89-37 1989 Control of Fish Releases from Dawson Draw Dam, Dolores River Project, September 11, 1989
TR-89-36 1989 Visit to Kittitas Canal Fishscreen and Roza Canal Fishscreen, Washington, September 12-13,1989
TR-89-34 1989 Emergency Guard Gate Tests on Tieton Dam, near Yakima, Washington, August 28-30, 1989
TR-89-33 1989 Testing of the 66-inch Fixed-Cone Valve (FCV) at Stewart Mountain Dam, Arizona Projects Office, August-September 1989
TR-89-30 1989 Water Haze Intensive Tracer Experiment
TR-89-29 1989 Attendance at Waterpower '89, Niagara Falls, New York, August 21-25, 1989
TR-89-28 1989 Water Erosion Prediction Project Meeting, Ramada Inn, Lafayette, Indiana, August 23-31,1989
TR-89-27 1989 1989 ASCE National Conference on Hydraulic Engineering in New Orleans, Louisiana, August 14-21, 1989
TR-89-26 1989 Stress Testing on Rotor Spider Unit 1, Seminoe Powerplant, Wyoming, July 17-21, 1989
TR-89-25 1989 Stewart Mountain Dam Modifications, Salt River Project, Arizona, May 25, 1989
TR-89-24 1989 Attend American Society of Civil Engineers Hydraulics Division Executive Committee Meeting and the ASCE National Conference on Hydraulic Engineering, New Orleans, Louisiana, August 11-17, 1989
TR-89-21 1989 Installation of a Continuous Water Level Recorder, Stagecoach Dam, Steamboat Springs, Colorado, June 13-15, 1989
TR-89-20 1989 Participate in the XXIII Congress of the International Association for Hydraulic Research, Ottawa, August 21-25, 1989
TR-89-19 1989 Attendance at the Second International Symposium on the Design of Hydraulic Structures, CSU, Fort Collins, Colorado, June 25-29, 1989
TR-89-18 1989 Lower Colorado River Telemetry System - Boulder City, Blythe, Nevada; Yuma, Arizona, September 6, 1989
TR-89-17 1989 Lower Colorado River Telemetry System - Boulder City, Blythe, Nevada; Yuma, Arizona,September 6, 1989 September 6, 1989
TR-877 1950 Calibration of 48-by 21-inch venturi meter for Lake Hefner, Oklahoma City, Okla.; Evaporation investigations. (July 14, 1950)
TR-860 1950 Visit to Coachella Valley Distribution System; All-American Canal (pipe line surging) (June 5, 1950)
TR-86 1946 To establish method and procedure for measuring seepage losses from Conchas Canal; Tucumcari Project (Feb. 20, 1946)
TR-854 1950 Attendance at spring meeting of ASCE in Los Angeles, California (June 13, 1950)
TR-839 1950 Vibration tests on turbine runner; Parker Dam Powerplant. (May 15, 1950)
TR-838 1950 Seepage measurement program; LCCL Program; Wyoming Canal; Riverton Project (May 7, 1950)
TR-83-43 1983 Detail to Glen Canyon Dam to Participate in Spillway Tunnel Repairs
TR-83-42 1983 International Symposium on Lake and Reservoir Management
TR-83-41 1983 Attendance at ASCE Committee Meeting
TR-83-40 1983 Palisades Dam Tunnel Spillway
TR-83-39 1983 Blue Mesa Dam
TR-83-38 1983 Estes Park
TR-83-37 1983 Mechanical and Electrical Assistance at Medicine Bow Wind Farm
TR-83-36 1983 Attendance at the Western Region Committee (W-152) "Clogging of Drain
TR-83-35 1983 Inspection of Kortes Dam Spillway Tunnel-Kortes Unit-Oregon Trail
TR-83-34 1983 Examination of Spillway Tunnel Lining and Hollow-Jet Valves at Flaming Gorge Dam
TR-83-33 1983 Atlanta
TR-83-30 1983 Attendance at ASCE Hydraulics Division Specialty Conference
TR-83-28 1983 Site Characterization Study of High Velocity Flows-Hoover Dam
TR-83-26 1983 Ottawa
TR-83-25 1983 Travel to Boulder City, Nevada, and Vicinity
TR-83-24 1983 Guernsey
TR-83-21 1983 Hoover Dam Spillway Elbows Inspection and Waterways Operations Capa
TR-83-20 1983 Tie Rod Vibration Field Test-Glendo Powerplant Outlet Works
TR-83-19 1983 Attendance at the ASCE Irrigation and Drainage 1983 Specialty Conference
TR-83-18 1983 Inspection of Ongoing Construction-McPhee Dam-Spec. No.DC-7420
TR-83-16, No. 2 1983 Observation of Spillway and Outlet Works Operation - Flaming Gorge Dam
TR-83-16, No. 1 1983 Observation of Spillway and Outlet Works Operation-Flaming Gorge Dam
TR-83-15,17,22, 1983 Memo To ACER from Chief Design Engr. Subject: Documentation of Travel
TR-83-14 1983 Review of TVA Intake Gate Closure Studies [PDF] 0.3 MB
TR-83-13 1983 Tie Rod Vibration Field Test - Glendo Outlet Works
TR-83-12 1983 International Symposium on Gas Transfer at Water Surfaces
TR-83-11 1983 Travel to Billings, Montana
TR-83-10 1983 Outlet Works Repairs - Stampede Dam Washoe Project, California-Nevada [PDF] 0.1 MB
TR-83-09 1983 Technical Interchange Program - Ertan Power Project - China
TR-83-08 1983 Preparation of Tie Rod Vibration Field Test - Glendo Powerplant
TR-83-07 1983 EPRI Ultra-High Head Pump/Turbine Development Program
TR-83-06 1983 Ertan Hydroelectric Project Team Meeting
TR-83-05 1983 Stampede Air Slot Tests [PDF] 0.2 MB
TR-83-04 1983 Contract Progress Review with the University of Idaho
TR-83-03 1983 Interagency Steering Committee on Reaeration Research and Electric
TR-83-02 1983 Inspection of the Upstream Nevada Intake Tower in Connection with
TR-83-01 1983 Attendance at Institute for Ice Engineering for Rivers and Lakes
TR-830 1950 Conference in Boulder City, Nev., for consideration and determination of water measurement on Wellton-Mohawk Lateral System; Gila Project (May 15, 1950)
TR-829 1950 Trip to Washington, D.C. on sediment matters and American Geophysical Union Annual Meeting. (May 18, 1950)
TR-824 1950 Operational difficulties in the Coachella Valley Distribution System; All-American Canal System; Boulder Canyon Project (May 12, 1950)
TR-82-30 1983 Travel to Flaming Gorge Dam, Utah
TR-82-29 1982 Attendance at 1982 ASME Winter Annual Meeting, Symposium on Small
TR-82-27 1982 AK Chin Water Supply Project-Conveyance Phase I Design Review Meeting
TR-82-26 1982 Inspection of Wells, Closed Basin Division, San Luis Valley Project
TR-82-24 1982 Participation in the Western Region Coordinating Committee (WRCC-19
TR-82-22 1982 Automation of Imperial Irrigation District
TR-82-21 1982 Planning Meeting for Water Forum '86
TR-82-20 1982 Harry S. Truman Dam Fish
TR-82-19 1982 Attendance at Workshop on Advanced Intake Technology
TR-82-18 1982 Attendance at 1982 ASCE Hydraulics Division Specialty Conference
TR-82-17 1982 IAHR Seminar on "Research Needs in River Hydraulics," Lisbon, Portugal
TR-82-16 1982 Attendance at ASCE National Specialty Conference
TR-82-15 1982 Meeting of ASCE Task Committee on Water Measurement
TR-82-14 1982 UN Mission to Turkey-Ankara, Turkey, and Vicinity
TR-82-13 1982 Contract Discussions with the University of Idaho
TR-82-12 1982 Inspection of Joes Valley High-Pressure Gate Repair
TR-82-11 1982 Special Examination of Balance Valves Service Gates, and Sluice Gates
TR-82-10 1982 Participation at the International Conference on Computational Methods
TR-82-09 1982 Cooperative Program Between Bureau of Reclamation and Ministry of
TR-82-08 1982 Tie Rod Vibration Field Test-Palisades Powerplant
TR-82-07 1982 Coordination Meeting on Penstock Cylinder Gate Closure Test-Hoover
TR-82-06 1982 Interagency Steering Committee on Reaeration Research
TR-82-05 1982 Examination of 1372-mm Sleeve Valve at Sugar Pine Dam, Central Valley Project
TR-82-04 1982 Preparation of Tie Rod Vibration Field Test - Palisades
TR-82-03 1982 Attendance at Ice Engineering for Rivers and Lakes Institute
TR-82-02 1982 ASCE Committee Meeting
TR-82-01 1982 Verification Tests-Supercooled Water Thermometer
TR-81-31 1981 November Lake Cachuma Limnological Survey, November 16-19, 1981
TR-81-30 1981 12th Interagency Research Coordination Conference, November 3-5, 1981
TR-81-29 1981 Clay Erosion Tests for Riverbank Stability Program Third Powerplant, September 38-October 24, 1981
TR-81-28 1981 ASCE Task Committee Meeting on Publications, September 20-21, 1981, An Arbor, Michigan
TR-81-27 1981 Inspection of Horizontal Reaches of Glen Canyon Spillways, August 13-14, and September 1, 1981
TR-81-26 1981 Temporary Assignment with the World Bank, August 12-14 and August 22-September 14, 1981
TR-81-25 1981 McClusky Canal Fish Screen, August 19-20, 1981
TR-81-24 1981 Temporary Assignment to the World Bank, Report combined with TR-81-26
TR-81-23 1981 Nitrogen Supersaturation Problems
TR-81-22 1981 Yellowtail Afterbay Dam - Nitrogen Supersaturation Problems, August 23-25, 1981
TR-81-21 1981 Attendance at ASCE "Water Forum '81' and Other Business
TR-81-20 1981 Canal Radial Gate Discharge Algorithms-Field Verification Program, July 13-17, 1981
TR-81-19 1981 Mt. Elbert Trashrack Vibration Study, June 22-25, June 30-July 2, July 14-16, and Sept. 30, 1981
TR-81-18 1981 Inspection of Spillway Crest at Choke Canyon Dam, Nueces River Project, May 27-29, 1981
TR-81-17 1981 Preparation for Trashrack Vibration Studies Mt. Elbert Pumped-Storage Plant
TR-81-16 1981 Inspection of Inclined Portion of Glen Canyon Spillway Tunnels
TR-81-15 1981 Installation of Vibration Instruments on Suction-Draft Tube Trashracks
TR-81-14 1981 Lake Cachuma Reaeration
TR-81-13 1981 Judging for WPRS Special Award at the 32nd International Engineering
TR-81-12 1981 Task Committee on Hydraulic Design of Small Scale Hydroelectric Pro
TR-81-11 1981 Engineering Days Exhibit Colorado state University, Ft. Collins
TR-801 1950 Conference relative to radio reporting rain gages; Sacramento River; Region 2. (Apr. 18, 1950)
TR-793 1950 Seismic investigation of bedrock depth at damsites on the Roaring Fork River near Aspen, Colo.; Gunnison-Arkansas Project (Mar. 2, 1950)
TR-78-9 1978 Attendance at Meeting - Pittsburgh, Pennsylvania April 25-26
TR-789 1950 Annual Meeting of the ASCE, New York City; Jan. 18-20, 1950. (Feb. 20, 1950)
TR-78-8 1978 Review of Magat Dam Spillway Model in Manila, Philippines
TR-788 1950 Trip to Missouri River Sediment Advisory Board Meeting arid various points in Nebraska (Loup River drainage area). (Feb. 20, 1950)
TR-78-7 1978 Cavitation Studies on Controller 30 RFAV-4 with Air Vent Holes Along
TR-78-6 1977 Mathematical Models for Central Arizona Project
TR-78-5 1978 Operation Study for Central Arizona Project
TR-78-4 1978 Real-Time Operation Study of Central Arizona Project Facilities
TR-78-32 1978 Attendance at Western Region Coordinating Committee (WRCC-19) Meeting
TR-78-31 1978 Air Injection Tests on Allis-Chalmers Model Turbine - Estes Powerplant
TR-78-30 1978 Participation in Soil Conservation Workshop, Portland, Oregon
TR-78-3 1978 Participation in Meeting of ASME Standards Committee on Measurement
TR-78-29 1978 Grand Coulee Riverbank Stabilization - Columbia Basin Project
TR-78-28 1978 Federal Interagency Steering Committee for Reaeration Research-Chat
Tr-78-27 1978 Final Transfer Inspection of American Falls Replacement Dam-Minidoka
TR-78-26 1978 Attendance at ASCE Task Committee Meeting Metropolitan Sanitary District
TR-78-25 1978 Participation in the Federally Coordinated Program of Highway Research
TR-78-24 1978 Attendance at the International Association for Hydraulic Research
TR-78-23 1978 Attendance at ASCE Specialty Conference on Verification of Mathematical Models
TR-78-22 1978 Attendance at ASCE Specialty Conference for Irrigation and Drainage
TR-78-21 1978 Bartlett Dam Spillway Chute Repair Program - Salt River Project -
TR-78-2 1978 Inspection of Potential Fish Control Structure Sites-Columbia Basin
TR-782 1950 Special salinity tests; Sacramento-San Joaquin Delta: CVP. (Feb. 3, 1950)
TR-78-17,18,19, 1978 Attendance at Joint Symposium on Design and Operation of Fluid Mach
TR-78-16 1978 Seminar on Low-Head Hydroelectric Technology and Visit to Rock Island
TR-78-15 1978 Inspection of Potential Fish Control Structure Sites-Columbia Basin
TR-78-14 1978 Inspection of American Falls Replacement Dam
TR-78-13 1978 Installation and Calibration of Colvin Controllers - Water Systems
TR-78-12 1978 Science and Engineers Fair - Anaheim, California(not necessary to w
TR-78-11 1978 Check Out, Test, and Calibrate EL-FLO Controllers Installed on Corn
TR-78-10 1978 McClusky Canal Fish Screening Fish Facility Task Force Meeting, Garrrison Diversion Unit - Pick-Sloan Missouri Basin Program, May 2-4, 1978
TR-78-1 1978 Presentation of Paper Entitled "Hydraulic and Safety Characteristic
TR-781 1950 Inspection of 48-by 22-inch venturi meter at Lake Hefner, Oklahoma City. Okla; evaporation investigations. (Feb. 9, 1950)
TR-779 1950 Field trip to Torrington, Wyoming, to assist in the acquisition of seepage loss measurements; North Platte Project (Feb. 2, 1950)
TR-776 1950 Field trip to Canyon Ferry damsite to install gages and set up program for measuring water-surface profiles through the diversion flume. (Jan. 31, 1950)
TR-774 1950 Field trip to Tucumcari, New Mexico to assist in seepage loss measurements in the Conchas Canal: LCCL Program. (Jan. 25, 1950)
TR-772 1950 Field trip to Fort Collins, Colo. in regard to the LCCL Program (seepage measurement) (Jan. 26, 1950)
TR-771 1950 Seismic investigations: Sugarloaf Damsite; Gunnison-Arkansas Project, Colo. (Jan. 20, 1950)
TR-768 1950 Cooperative agreement with Soil Conservation Service and the Colo. Agricultural Experiment Station at Fort Collins; LCCL Program (seepage measurement). (Jan. 9, 1950)
TR-759 1940 Attendance at meetings; Seventeenth Annual Meeting, Engineers' Council for Professional Development; Fifth Annual Meeting, National Conferonce on Industrial Hydraulics; and Meeting of ASCE Hydraulics Division, Executive Committee; Oct. 26-29, 1940, Chicag
TR-758 1949 Trip to Colorado A&M College, Fort Collins, Colorado to discuss the vortex-tube sand trap with Mr.Cari Rohwer. (Dec. 16, 1949)
TR-741 1949 Detail to Office of Commissioner, Washington, D.C.; Oct. 28-Nov. 10, 1949. (Dec. 2, 1949)
TR-739 1949 Conference in Cambridge, Mass. on sea-water reclamation (Dec. 1, 1949)
TR-724 1950 Seepage measurement program and inspection of Conchas Canal; Tucumcari Project; LCCL Program. Feb. 27, 1950)
TR-721 1945 Stable channel survey on San Luis Valley Irrigation Canals; sedimentation program. (Nov. 9, 1945)
TR-718 1949 Seismic survey of the depth to bedrock at the Willow Park damsite, Wyoming; Piney Unit; MRBP. (Nov. 4, 1949)
TR-696 1949 United Nations Scientific Conference on the Conservation and Utilization of Resources and to Washington, D.C., Aug. 24-Sept. 12, 1949. (Oct. 14, 1949)
TR-654 1949 Hydraulic investigations in connection with the protection of the tailrace, slopes and riverbanks: Grand Coulee Dam; CBP. (Aug. 19, 1949)
TR-649 1949 Inspection of hydraulic features of Friant Dam; CVP. (Aug. 15, 1949)
TR-639 1949 Cooperative agreement with Soil Conservation Service and Experiment Station at Fort Collins, Colo.; LCCL Program (seepage measurement). (Aug. 16, 1949)
TR-635 1949 Repair and installation of salinity meters in Delta-Cross Channel; CVP. (Aug. 11, 1949)
TR-624 1949 Attendance at the Fourth Hydraulic Conference; Iowa Institute of Hydraulic Research Iowa City, Iowa. June 12-15, 1949. (July 6, 1949)
TR-621 1949 Field trip to Torrington, Wyoming to advise on seepage loss measurements; North Platte Project; Wyoming-Nebraska (June 30, 1949)
TR-610 1949 Inspection of sedimentation problems on North Platte and Mirage Flats Project: Apr. 4-8, 1949.(June 17, 1949)
TR-590 1949 Field performance tests of two pumping units at Pasco Pumping Plant; CBP. (June 1, 1949)
TR-587 1949 Transfer of water from Sacramento River to the San Joaquin River for export to the Delta-Mendota Canal and for salinity repulsion in the Lower Delta; CVP. (May 27, 1949)
TR-568 1949 Detail to office of Commissioner, Washington, D.C.; Jan. 11-Feb. 10, 1949. (Apr. 21, 1949)
TR-552 1949 Demonstration of concrete consistency meter at Allatoona Dam. Cartersville. Ga.: Jan. 17-18, 1949. (March 31, 1949)
TR-549 1949 Recruitment of engineering personnel at technical universities (lowa State Col., Purdue U.,U. of Mich.) (Mar. 22, 1949)
TR-537 1949 Recruitment of engineering personnel at technical universities. (U.of Cincinnati, Mich. State Col., State U.of Iowa). (Feb. 25, 1949)
TR-535 1949 Trip to Washington, D.C.; Jan. 31-Feb. 2, 1949 (Sediment analysis and control). (Feb. 17, 1949)
TR-530 1949 LCCL Program; Region 7; Participation by Colo. A&M College, Fort Collins, Colo. (Feb. 8, 1949)
TR-524 1949 Determination of safe blasting procedures for protection of Gorge Powerplant during new construction. (Jan. 5, 1949)
TR-522 1948 Conference on Delta Cross Channel in Sacramento, California on Dec. 13-17, 1948; CVP. (Jan. 10, 1949)
TR-521 1949 Model of Sacramento-San Joaquin Delta and San Francisco Bay for the study of hydraulic problems; CVP. (Jan. 7, 1949)
TR-5041 1977 Field Inspection and Testing at the Hollow Jet Valve Bypass and Aux
TR-5027 1977 Field Test on Pleasant Oak Main (POM)
TR-5018 1977 Technical Program Committee Meeting for IAHR/ASME/ASCE Joint Symposium
TR-5010 1977 Tenth Interagency Research Coordination Conference
TR-5006 1977 Bicycle Safe Grate Inlets Study - Slotted Drains
TR-4991 1977 Attendance of Meetings October 16-24
TR-4985 1977 Monitoring of Penn State Contract
TR-4984 1977 Biannual Meeting of Weather Modification Association
TR-4978 1977 Attendance at Northwest Bridge Engineer's Conference
TR-4970 1977 Lake Casitas Reaeration Research
TR-4968 1977 Research Contract with the University of California, Berkeley, for
TR-4960 1977 Attendance at Meeting of Federal Interagency Steering Committee on
TR-4956 1977 Small Hydroelectric Generation Workshop
TR-4955 1977 Cavitation Studies on Controller 30 RFAV-4 with Perforated Disk at
TR-4952 1977 Travel to College Station, Texas
TR-4946 1977 Travel to Grand Coulee, Washington
TR-4939 1977 Repair of Colvin No. 4 Controller
TR-4932 1977 Automation of the Cambridge Diversion Dam, Nebraska
TR-4928 1977 Attendance at Committee Meeting and ASCE Irrigation and Drainage Division
TR-4923 1977 Inspection of American Falls Replacement Dam, Minidoka Project
TR-4922 1977 Attendance at ASCE Irrigation and Drainage Specialty Conference
TR-4903 1977 Travel to San Jose, California May 31- June 1
TR-4897 1977 Inspection of Crystal Dam Outlet Works
TR-4894 1977 Attendance at Committee Meetings June 13-17
TR-487 1948 Field trip to Albuquerque, New Mexico, to advise on Middle Rio Grande Project (Oct. 25, 1948)
TR-4869 1977 Attendance at Meeting August 25-29
TR-4860 1977 Field Review of Lake Casitas Destratification Research
TR-4859 1977 Field Inspection of Ice Formation in Sluiceway at Hunter Creek Dive
TR-4857 1977 Southwest Project
TR-4853 1977 Attendance At ASCE Workshop on Research, Purdue University
TR-4839 1977 Assignment for Fourteenth Bureau Manager Development Program
TR-4832 1977 Field Review of Lake Cassitas Destratification Research
TR-4825 1977 Lecture at Utah Water Users Workshop, USU Logan, Utah
TR-4823 1977 Presentation of Progress Report, Hydraulic and Safety Characteristic
TR-4815 1976 Pipeline Surge Pressure Measurement, Westland Water District
TR-4809 1976 Twin Lakes Reoxygenation
TR-4802 1976 Inspection of Spillway, Crystal Dam, Specifications No. DC-7000, Co
TR-4799 1976 Field Overview of River Fisheries in Truckee and Trinity Rivers
TR-4790 1976 Meeting of Hydraulic Structures Committee ASCE
TR-479 1948 High-pressure slide gate tests by Corps of Engineers; Norfork Dam, Arkansas (Oct. 6, 1948)
TR-4768 1976 Research and Maintenance Field Trip To Check the EL-FLO Controllers
TR-4761 1976 IAHR Symposium on Fluid Motion Stability in Hydraulic Systems with
TR-4759 1978 Attendance at ASCE Annual Convention and Exposition, Philadelphia
TR-4758 1976 Hydraulics Field Test of Ruedi Dam Outlet Works Left Conduit and St
TR-4752 1976 Technical Program Committee Meeting for IAHR/ASME/ASCE Joint Symposium
TR-4744 1976 Assignment for Fourteenth Bureau Development Program
TR-4739 1976 Attendance of Rivers 76, Symposium on Inland Waterways for Navigation
TR-4737 1976 Technical Program Committee for IAHR/ASME/ASCE Joint Symposium
TR-4735 1976 International Solar Energy Conference
TR-4733-A 1976 Design Review Meeting, Powerplant Generator Controller (PPGC) for
TR-473 1948 Inspection of sediment problems of North Platte Project and model experiments of North Loup sediment measuring flume at Fort Collins. (Sept. 27, 1948)
TR-4723 1976 Irrigation and Drainage Division, ASCE, Annual Specialty Conference
TR-472 1948 Conference on the Gering Drain; North Platte Project (Sept. 24, 1948)
TR-4719 1976 Attendance at Meeting August 3-6
TR-4708 1976 Installation of Test Devices in the First River Outlet Works Chute
TR-4702 1976 Bicycle Safe Grate Inlets Study
TR-4699 1976 Travel as Assistant Team Leader with Soviet Working Group, Part III
TR-4689 1976 Assignment for Fourteenth Bureau Manager Development Program
TR-4675 1976 USSR Cooperative Project 111-2, Visit to Corning Canal to Observe
TR-4672 1976 Attendance at Executive Seminar "Administration of Public Policy"
TR-4659 1976 Participation in Finalizing an ASME Performance Standard Draft for
TR-4653 1976 Inspection of the Libby Dam Model
TR-4631 1975 US/USSR Cooperative Project III.2
TR-4602 1975 Solar Energy Research Program
TR-4599 1975 Travel to Albuquerque, New Mexico
TR-4593 1975 ASCE Symposium on Reaeration Research
TR-4588 1975 Operation of the EL-FLO Control System for the Corning Canal, West
TR-458 1948 Trip to Bismarck to attend Corps of Engineers Conference on degradation below Garrison Dam. (Aug. 23, 1948)
TR-4573 1975 Attendance at IX International Congress On Irrigation and Drainage
TR-4571 1975 Attendance at the International Association of Hydraulic Research
TR-4565 1975 Attendance at ASCE Symposium on Modeling Techniques
TR-4558 1975 Reaeration Research, Lake Casitas, California
TR-4556 1975 Automation of the Corning Canal Repair and Adjustment of the EL-FLO
TR-4553 1975 Attendance at Irrigation and Drainage Division Specialty Conference
TR-4549 1975 Automation of the Corning Canal, Installation of EL-FLO Alarms and
TR-4544 1975 Attendance at Meetings, August 5-8
TR-4539 1975 Inspection and Testing Flaming Gorge Spillway, Flaming Gorge Unit,
TR-4524 1975 Automation of Coalinga Canal, Installation of EL-FLO Controllers,
TR-4517 1975 Cavitation Studies on Butterfly Valve 30-5 at Flamingo Flow Control
TR-4514 1975 Automation of the Coalinga Canal, Initial EL-FLO Control of Check
TR-4512 1975 Observation of Blanco Diversion Dam, San Juan Chama Project, Colo
TR-4507 1975 Hydraulic Performance Tests, Main (South) and Southwest Aqueducts,
TR-4506 1975 Automation of Coalinga Canal and Pleasant Valley Powerplant, Westla
TR-4474 1975 Attendance at Meeting - Scottsbluff, Nebraska
TR-4466 1975 Attendance at ASCE Task Committee on Revision of Manual 25, "Hydraulic Models"
TR-4462 1975 Mid-Pacific 8th Annual Water Users Conference "Water System Automat
TR-4450 1974 Inspection of Libby Dams
TR-4437 1974 Field Inspection of the Denver Water Board's Moffat Water Collection
TR-4432 1974 Participation in Ninth Interagency Conference on Hydraulic Laboratories
TR-4425 1974 Meeting on Reaeration Research, Oklahoma State University
TR-4416 1974 Attempted Hydraulic Performance Test of the Southwest and Main
TR-4411 1974 Attendance at Meetings October 21-14
TR-4407 1974 Meeting of Federal Interagency Steering Committee on Reaeration Res
TR-439 1948 Fiow conditions at Grand Coulee Dam during 1948 flood (Aug. 5, 1948)
TR-4388 1974 Preparations for Resumption of Model Turbine Testing of Estes Powerplant
TR-4387 1974 Attendance at an Engineering Foundation Conference
TR-4383 1974 Irrigation and Drainage Division, ASCE, Annual Specialty Conference
TR-4381 1974 Spillway Tunnel Inspection, Blue Mesa Dam, Colorado River Storage
TR-4366 1974 Assignment for Eleventh Bureau Manager Development Program
TR-4362 1974 Interagency Ice Engineering Research Meeting June 24-26
TR-4358 1974 Observation of Hydraulic Model Studies of Channel Downstream from
TR-4350 1974 Field Testing of EL-FLO Controllers on Corning Canal, Central Valley Project
TR-435 1948 Trip to Colo. A&M College, to observe operations of a hydraulic model (sediment measuring flume, Middle Loup River). (Aug. 2 & July 29, 1948)
TR-434 1948 Inspection of two-sprinkler irrigation systems on a farm of Floyd Oliver southeast of Greeley, Colo. (July 29, 1948)
TR-4325 1974 Review of Bechtel,Inc., Design for American Falls Replacement Dam,
TR-4322 1974 Marys Lake Powerplant Turbine Test Measurements
TR-4318 1974 Attendance at Meetings of Federal Interagency Steering Committee on
TR-4310 1974 EL-FLO Installation for Coalinga Canal, Westlands Water District,
TR-4303 1974 American Falls Dam Replacement, Minidoka Project, Idaho
TR-4295 1974 Irrigation and Drainage Division, ASCE., Research Committee Meeting
TR-4294 1974 Lectures at Water Users Workshop, Utah State University, Logan, Utah
TR-4289 1974 American Falls Dam Replacement, Minidoka Project, Idaho
TR-4285 1973 Eighth Conference on Coordination of Research Activities of USBR-CE
TR-4282 1973 EL-FLO Controllers for Corning Pumping Plant, Corning Canal, and Tehama-Colusa Canal
TR-4268 1973 Witness Tests of the Hydraulic Model Turbine for Grand Coulee Third
TR-4267 1973 EL-FLO Controller-South Gila Canal Automation, Gila Project
TR-4265 1973 Attendance at Federal Interagency Meeting for Coordination of Water
TR-4257 1973 EL-FLO Controller-South Gila Canal Automation - Gila Project
TR-4253 1973 Assignments for Eleventh Bureau Manager Development Program
TR-4251 1973 Inspection of Hydraulic Backfilling Operation of Abandoned Coal Min
TR-4250 1973 Summary Evaluation of Practical Training Assignment, Eleventh Bureau
TR-4242 1973 Headgate Control Modifications - EL-FLO Controller-South Gila Canal
TR-4238 1973 Attendance at Irrigation and Drainage Division Specialty Conference
TR-4237 1973 Attendance at ASCE Hydraulics Division Specialty Conference, Bozeman
TR-4231 1973 Headgate Control Modifications - EL-FLO Controller-South Gila Canal
TR-4229 1973 Model Turbine Testing at the Grand Coulee Third Powerplant Model Test Stand
TR-4224 1973 Examination of Silver Jack Dam Outlet Works and Observation of Spillway Operation
TR-4203 1973 Closure Tests of the No.1 Penstock-Intake Structure Fixed-Wheel Gate
TR-4200 1973 Field Inspection of EL-FLO Plus RESET and Colvin's Controllers
TR-4192 1973 Visit to Bureau of Mines Office and Inspection of Coal Mine Backfill
TR-4180 1973 1973 Automation Program-Prototype Installation of the ElFLO Plus RE
TR-418 1948 Report on field performance tests of two pumping units and vacuum pump installed in Terry Pumping Plant; Buffalo Rapids Project, Mont. (July 13, 1948)
TR-4177 1973 Attendance at ASCE National Water Resources Engineering Meeting, Wa
TR-417 1948 Repair of submarine signal 808-J echo sound equipment at Altus Dam, Okla. (July 13, 1948)
TR-4158 1972 Sediment Problem at Red Bluff Diversion Dam and Turnover of Baffle
TR-4157 1972 Meeting of Federal Interagency Steering Committee on Reaeration Res
TR-4153 1972 Examination and Tests of a Modified Outlet at Palisades Dam and Vis
TR-4148 1972 Irrigation and Drainage Division, ASCE Specialty Conference and Meeting
TR-4146 1972 Observation and Limited Study of Small Steep-Slope Laterals-Helena
TR-4144 1972 Water System Automation - South Gila Canal- Gila Project
TR-4121 1972 Attendance at ASCE Hydraulics Specialty Conference
TR-412 1948 Installation of piezometers in two 96-inch outlet gates; Shasta Dam-CVP. (June 21, 1948)
TR-4111 1972 Corning Canal Automation-1972 Electronic Filter Level Offset (ELFLO)
TR-4094 1972 Operational Test of the Navajo Dam Auxiliary Outlet Works Modifications
TR-4092 1972 Travel to Sayre, Oklahoma, to Sample Particles Produced by Hygroscopic
TR-4090 1972 Attendance at ASCE Task Committee on Hydromechanics of Ice
TR-4085 1972 Dissolved Gas Analysis at Lake Granby, Shadow Mountain, and Willow
TR-4070 1972 Reaeration Research
TR-4054 1972 Dissolved Gas Supersaturation Tests at Navajo Dam
TR-4053 1972 Attendance at Offshore Technology Conference
TR-4036 1972 Performance Test of 6,000 Horsepower Brine Recycle Pump, Office of
TR-402 1948 Trip to Middle Rio Grande Valley (Cochiti to San Antonio bridge, during flood). (June 8, 1948)
TR-4015 1972 California Undersea Aqueduct Reconnaissance Study
TR-4 1940 Report on inspection trip to correlate hydraulic laboratory design end the field operation of the 102-inch river outlets; Grand Coulee Dam; CBP. (May 15, 1940)
TR-3999 1972 Columbia River Nitrogen Supersaturation
TR-3984 1972 Attendance at Meeting of Federal Interagency Steering Committee for
TR-3978 1972 Dos Amigos Pumping Plant Siphon Elbow Hydraulic Test and Assistance
TR-3977 1972 Participation in Water Measurement Workshop-Tracy, California-CVP
TR-3973 1972 Participation in ASCE National Water Resources Engineering Meeting,
TR-3959 1971 Meeting of Research Committee, Irrigation and Drainage Division,ASCE
TR-3957 1971 California Undersea Aqueduct Reconnaissance Investigation
TR-3944 1971 Participation in XIVth Congress of the International Association
TR-3940 1971 Attendance at Federal Interagency Meeting for Coordination of Water
TR-3925 1971 Attendance at International Association for Shell Structures, Pacific
TR-3922 1971 Seventh Conference on Coordination of Research Activities of Corps
TR-3917 1971 Attendance at International Conference on Modern Developments in Fl
TR-3911 1971 Travel to Tehama-Colusa Fish Facilities, Red Bluff, California
TR-3899 1971 Attendance at Conference on Research Needs for Transfer of Waste He
TR-3884 1971 Attendance at Hydraulic Conference of the American Society of Civil
TR-3869 1971 Attendance at ASCE Hydraulics Division Specialty Conference-Iowa City, Iowa
TR-3859 1971 Attendance at Course "Engineering Aspects of Heat Disposal from Pow
TR-3854 1971 Meeting of the California Undersea Aqueduct Study Management Team
TR-3843 1971 Development of Systems Work Plan for California Aqueduct Reconnaissance
TR-3838 1971 Travel to San Angelo, Texas, to Assemble a Ground-based Cloud-seeding
TR-3833 1971 Development of Systems Work Plan for California Undersea Aqueduct
TR-3813 1971 Travel to the University of Wyoming at Laramie and to Elk Mountain
TR-3803 1971 Participation in Water Measurement Workshop-Los Banos, California
TR-3801 1971 Steering Committee Meeting to Prepare Biennial Research Coordination
TR-3794 1971 Ice Jamming on the Gunnison River Upstream of Blue Mesa Reservoir-
TR-3788 1971 Participation in ASCE National Water Resources Engineering Meeting
TR-3786 1971 Inspection of the Elevation 1036.67 River Outlets - Grand Coulee Da
TR-3783 1971 Experimental Ice Control Structure-North Platte River
TR-3779 1970 Lecture at Utah Irrigator's Workshop, Utah State University, Logan
TR-3738 1970 Attendance at International Association for Hydraulic Research Symposium
TR-3730 1970 Hydraulic Testing of Yellowtail Spillway Tunnel, Yellowtail Dam-MRB
TR-373 1948 Trip to Omaha to attend meeting of the Missouri River Sediment Advisory Board (Apr. 13, 1948)
TR-3727 1970 Attendance at 18th Annual Specialty Conference, Hydraulics Division
TR-3724 1970 Attendance at Systems Analysis Course, USAF Academy, Colorado Springs
TR-3695 1970 Stilling Basin Tests-River Outlet Works-Navajo Dam-Colorado River
TR-3684 1970 Attendance at Systems Analysis Course, CSU, Ft. Collins, Colorado
TR-3683 1970 Report on Trip to Los Banos, California-Travel Authorization No.009
TR-3677 1970 College Contact
TR-3669 1970 Attendance at Water Resources Engineering Conference, Memphis,TN
TR-3660 1970 Participation in XIII Congress, International Assoc. for Hydraulic
TR-3659 1970 Lecture at Utah Irrigators' Workshop, USU, Logan, Utah
TR-363 1948 Recruitment of engineering personnel for the USBR (U. of Cincinnati. Purdue U., Wash. U., Mo. Sch. of Mines). (Mar. 29, 1948)
TR-3617 1969 Attendance at Hydraulics Division Specialty Conference, American So
TR-3613 1969 Examination of Yellowtail Dam Spillway Tunnel Following Test Release
TR-3611 1969 Hydraulic Testing of Yellowtail Spillway Tunnel - Yellowtail Dam
TR-3579 1969 Report on Trip to Los Banoc, California
TR-3578 1969 Separan Flocculation Test - Silt Inlet Canal - Silt Project, Colorado
TR-3570 1969 Inspection of Silt Inlet Canal for Possible use as field site for testing the Flocullating agent, Separan. (May 8, 1963)
TR-3567 1969 Travel to Montreal and Baie Comeau, Quebec; Model tests; Grand Coulee Third Powerplant Turbines; Solicitation No. DS-6607;CBP. (Apr. 17, 1969)
TR-3562 1969 Review of work in spillway tunnel; Spec. DC-6599; Yellowtail Dam; MRBP. (Mar. 31, 1969)
TR-3559 1969 Report on trip to Ft. Smith. Montana, Yellowtail Dam (to install hydrophones and transducers in spillway tunnel). (Mar. 25, 1969)
TR-3552 1969 College recruitment (U. of Mo., U. of Iowa). (Feb. 27, 1969)
TR-3550 1969 Attendance at Water Resources Engineering Conference, New Orleans, La. (Feb. 20, 1969)
TR-3545 1969 College recruitment (Mich. Technological U., Wis. State U., Iowa State U.). (Feb. 12, 1969)
TR-3544 1969 Engineering representative visits, U. of Tenn. and Va. Polytechnic Institute and Attendance at ASCE National Meeting on Water Resources Engineering, New Orleans. (Feb.12, 1969)
TR-3532 1969 Report on trip to Los Banos, California (San Luis Pump-Generator, Unit 4, capacity tests.) (Jan. 6, 1969)
TR-3531 1969 Morrow Point Dam Outlet Works piezometric measurements; Curecanti Unit: CRSP (Jan. 14, 1969)
TR-3529 1968 Examination of spillway tunnel; Yellowtail Dam; MRBP. (Dec. 13, 1968)
TR-3528 1968 Report on trio to Los Banos, California (San Luis Pumping Generating Plant, Unit 4, pump-turbine tests; Dos Amigos pump shutdown pressures; O'Neill Pumping Plant impeller clearance.) (Dec. 6, 1968)
TR-3523 1968 Observation of Morrow Point spillway operations; Morrow Point Dam; Curecanti Unit; CRSP. (Dec. 4, 1968)
TR-3520 1968 Geophysical seismic research measurements on Divide Tunnel; Fryingpan-Arkansas Project, Colo. (Nov. 6, 1968)
TR-3514 1966 Attendance at the Sixth Interagency Conference on Hydraulic Laboratory Techniques and Instrumentation. (Nov. 20, 1966)
TR-3493 1968 Examination of cavitation damage in outlet works; Palisades Project (Sept. 13, 1968)
TR-3490 1968 Travel to ASCE Hydraulics Div. 16th Annual Specialty Conference. (Aug. 29, 1968)
TR-3489 1968 Tests on three tractive force test reaches; Farwell Main Canal, Nebr.; MRBP. (Aug 12, 1968)
TR-3463 1968 Field trip to Yuma, Ariz. (Colorado River Front Works & Levee System, sampling study). (July 12, 1968)
TR-346 1948 Trip to Fort Collins regarding sediment-measuring flume (North Loup River). (Feb. 2, 1948)
TR-345a 1948 Joint field trip report; Upper Missouri River Basin. Jan. 12-22, 1948 (sedimentation). (Jan. 30, 1948)
TR-3458 1968 Report on trip to Los Banos, California (O'Neill Pumping Plant acceptance tests, acoustic flowmeter performance, Kreutkramer ultrasonic equipment check). (June 19, 1968)
TR-3452 1968 Hydraulic performance test: Canadian River Aqueduct from Amarillo Reservoir to Lubbock Reservoir (Central System), Canadian River Project, Tex. (June 7, 1968)
TR-3440 1968 Attendance at Third Biennial Meeting on Current Research in Hydraulics and Water Resources. (May 8, 1968)
TR-3433 1968 Participation in Western Water and Power Symposium, Los Angeles. (Apr. 29, 1968)
TR-3431 1968 Alliance Substation, model for court exhibit; Nels Larive v U.S. Civil No. 67-40S. U.S.D.C., D. of S. Dak. Kay Larive v U.S., Civil No. 1328L. U.S.D.C. D. of Nebraska (Apr. 24, 1968)
TR-3421 1968 College recruitment (U. of Iowa, Iowa State U.). (Mar. 21, 1968)
TR-3418 1968 College recruitment (U. of Wis., Marquette U., Wis. State U.). (Mar. 4, 1968)
TR-3413 1968 Attendance at ASCE Specialty Conference, "Current Research into the Effects of Reservoirs on Water Quality". (Feb. 9, 1968)
TR-3406 1967 Hydrodynamic pressure and acceleration measurements; Yellowtail outlet works stilling basin; MRBP. (Dec. 22, 1967)
TR-3402 1967 Lectures at Utah Irrigators' Workshop, Logan, Utah. (Dec. 29, 1967)
TR-3400 1967 Attendance at meeting of Committee on Hydraulic Structures; ASCE. (Dec. 28, 1967)
TR-3397 1967 Repair of Bureau drillhole television equipment. (Dec. 20, 1967)
TR-3396 1967 Rehabilitation of pressure transducers in the center wall of the Yellowtail Dam Outlet Works Stilling Basin; MRBP.(Dec. 20, 1967)
TR-3393 1967 Attendance at meeting of Water Management Subcommittee of the Pacific Southwest Inter-Agency Committee. (Dec.13, 1967)
TR-3388 1967 Seismic field measurements in Hunter Creek area of South Side Collection System, Fryingpan-Arkansas Project, as requested by Regional Director. Region 7, Denver, Colo. (Nov. 30, 1967)
TR-3375 1967 Report on trip to Fremont Canyon Powerplant (Units 1 and 2 performance tests). (Oct. 23, 1967)
TR-337 1948 Hydraulic tests on San Diego Aqueduct; San Diego Aqueduct Project. California (Jan. 12, 1948)
TR-3369 1967 Participation in the XIIth Congress, IAHR; Colo. State U., Fort Collins, Colo. (Oct. 12, 1967)
TR-3366 1967 Lake Powell Terrain Model Inspection, Page, Ariz. (Oct. 6, 1967)
TR-3362A 1967 Supplement to Travel Report dated Sept. 22, 1967, concerning Ad Hoc Committee study of Yellowtail Dam spillway repair; MRBP. (Oct. 9, 1967)
TR-3362 1967 Ad Hoc Committee to study spillway repair; Yellowtail Dam; MRBP. (Sept. 22, 1967)
TR-3351 1967 Report on trip to Fremont Canyon Powerplant (Unit 2 performance). (Sept. 11, 1967)
TR-3346 1967 Inspection of spillway tunnel; Yellowtail dam; MRBP. (Aug. 28, 1967)
TR-3341 1967 Travel to Navajo Dam; CRSP (Outlet works stilling basin). (Aug. 14, 1967
TR-3338 1967 Ponding test of Reach 1, San Luis Canal; San Luis Unit, CVP. (July 28, 1967)
TR-3336 1967 Flood release, Yellowtail dam; MRBP. (Aug. 8, 1967)
TR-3335 1967 Flood releases from reservoir; Yellowtail Dam; MRBP. (Aug. 3, 1967)
TR-3316 1967 Travel to Fremont Canyon Powerplant (Unit 2 performance). (June 15, 1967)
TR-3310 1967 Report on trip to Fremont Canyon Powerplant, (Unit 2 performance). (Apr. 24, 1967)
TR-3302 1967 Participation in hydraulic performance tests; Main Aqueduct and Pumping Plants No. 1, 2, 3, and 4 (Northern System); Canadian River Project, Tex.; Mar. 13-18, 1967. (Apr. 27, 1967)
TR-3289 1967 College Recruitment and ASCE Conference: (Mich. State U., U. of Tenn., ASCE Environmental Conf., Dallas). (Mar. 3, 1967)
TR-3287 1966 Participation in Irrigation Operators' Workshop; Utah State U.; Logan, Utah; Nov. 30-Dec. 2, 1966. (Dec. 19, 1966)
TR-3280 1966 Hydraulic turbine performance test; Clear Creek Tunnel hydraulic friction test; Judge Francis Carr Powerplant; Trinity River Div.; CVP. (Dec. 23, 1966) F-185
TR-3256 1966 Engineering representatives visits to colleges: College Recruitment Program (U. of Ill., Rose Polytechnic Institute). (Oct. 26, 1966)
TR-3251 1966 Capacity test of the Salt Lake Aqueduct, Provo River Project, Utah; and experimental discharge measurements with a radioactive isotope tracer at Flaming Gorge Powerplant, Utah. (Sept. 28, 1966)
TR-3243 1966 Participation in Fifth lnteragency Conference on Hydraulic Laboratory Techniques and Instrumentarion at TVA, Knoxville and Norris, Tenn. (Oct. 10, 1966)
TR-3237 1966 Hydraulic and soils measurements on tractive force test reaches; Farwell Main Canal, Nebraska; MRBP; LCCL Program. (Aug. 10, 1966)
TR-3228 1966 Attendance at Fifteenth Annual Conference of the Hydraulics Div.; ASCE; Aug. 24-26, 1966. (Sept. 22, 1966)
TR-3227 1966 Examination of Yellowtail Dam spillway stilling basin (Sept. 22, 1966)
TR-3201 1966 Hydraulic capacity test of the Salt Lake Aqueduct at design discharge: Provo River Project, Utah. (June 20, 1966)
TR-320 1947 Testing of air vent in Ogden City Water Collecting System; Pine View Dam; Ogden River Project, Utah. (Dec. 29, 1947)
TR-3198 1966 Yellowtail Dam outlet works stilling basin hydrodynamic measurements with a maximum discharge of 3,100 cfs; MRBP. (May 27, 1966)
TR-3195 1966 Pressure and accelerometer measurements; outlet works stilling basin; Yellowtail Dam; MRBP. (May 6, 1966)
TR-3193 1966 Pressure measurements; Laterals 5.4 and 3.0-1.1; South Gila Valley Unit; Gila Project, Yuma, Ariz.; Feb. 1966. (May 9, 1966)
TR-3180 1965 College contact information (Purdue U., State U. of Iowa). (Apr. 1, 1965)
TR-318 1947 Operation of electronic metal detector in Granby Diversion Tunnel; CBTP. (Dec. 5, 1947)
TR-3174 1966 Pressure measurements; Lateral 6.5: South Gila Unit; Gila Project, Yuma, Ariz.; Jan. 1966 (Mar. 21, 1966)
TR-3168 1966 Pressure measurements; Lateral 6.5, South Gila Unit; Gila Project, Yuma. Ariz. (Mar. 8, 1966)
TR-3163X 1968 Investigation of unsatisfactory operation of Unit 2 at Flaming Gorge Powerplant. (Nov. 1, 1968)
TR-3163 1966 Hydraulic turbine acceptance test; Flaming Gorge Powerplant; CRSP. (Mar. 2, 1966)
TR-3153 1966 Trip to Priest Rapids spawning channel, Wash.; and meeting with Bureau of Commercial Fisheries, Portland, Oreg. concerning cleaninq spawning gravels from Tehama-Colusa canal; CVP. (Jan. 24, 1966)
TR-3152 1966 Observation of structures and spillway release; Salt River Project, Ariz. (Jan. 28, 1966)
TR-3150 1966 Engineering representative visits; College Recruitment Jan. 11-14, 1966 (U. of Tenn., Agricultural & Tech. Col. of N.C.). (Jan. 24, 1966)
TR-3144 1966 Participation in Isotopes Systems Development Program: U.S. Atomic Energy Commission, Washington, D.C. (Jan. 11, 1966)
TR-3142 1965 Pressure measurements; Outlet works stilling basin center wall: Yellowtail Dam; MRBP. (Dec. 27, 1965)
TR-3141 1966 Participation in a maximum capacity test of the Gila Gravity Main Canal; Gila Proj.. Ariz. (Jan. 11, 1966)
TR-3138 1965 Participation in lrrigation Operators' Workshop; Utah State U., Logan, Utah; Dec. 1-3, 1965. (Jan. 10, 1966)
TR-3130 1965 Attendance at Eleventh Congress of the IAHR, Sept. 6-11, 1965, in Leningrad, USSR; participation in study tours; and visits to European hydraulic laboratories. (Dec. 15, 1965)
TR-3126 1965 Installation of pressure transducers and accelerometers in the center wall of the river outlets stilling basin; Yellowtail Dam; MRBP. (Dec. 22, 1965)
TR-3125 1965 Piezometric measurements of hydraulic friction and bend losses in River Outlet No. 3; Glen Canyon Dam; CRSP. (Dec. 20, 1965)
TR-3115 1965 Examination of cavitation damage to gates and liners in Left Diversion Tunnel and examination of other gates and valves at Glen Canyon Dam; CRSP. (Oct. 6, 1965)
TR-3114 1965 Hydraulics and Water Resources Seminar sponsored by the Southern Idaho Section; ASCE; Boise, Idaho; Nov. 18-19, 1965. (Nov. 26, 1965)
TR-3109 1965 Coordination conference on research activities between TVA, the Corps of Engineers, and USBR; Oct 12-14, 1965; Vicksburg, Miss. (Nov. 10, 1965)
TR-3100 1965 Inspection of stilling basin at Folsom Dam; Folsom Field Division; CVP. (Oct. 12, 1965)
TR-31 1943 Hydraulic model studies of the 58-inch balanced valves to determine an operating schedule for minimizing damage to needle tips and discharge conduits during the 1943 season; Shoshone Dam: Shoshone Project (Apr. 12, 1943)
TR-3098A 1965 Attendance at ASCE Annual Meeting and Environmental Engineering Conference, Kansas City, Mo.; Oct. 18-22, 1965. (Oct. 29, 1965)
TR-3090 1965 Seismic measurements to evaluate tunnel wall blast damage at Two Forks damsite; Upper South Platte Unit Investigations; MRBP, Colo. (Oct. 13, 1965)
TR-3085 1965 Measurements on tractive force test reaches; LCCL Program; Farwell Main Canal; Farwell Unit; Middle Loup Div.; MRBP. (Sept. 28, 1965)
TR-3073 1965 Participation in ASCE Hydraulics Div. Conference, Tucson, Ariz.; Aug. 25-27, 1965. (Sept. 11, 1965)
TR-3065 1965 Seismic measurements of bedrock depth in the emergency rehabilitation of the water supply for the city of Cripple Creek. Colo. (Sept. 3, 1965)
TR-3059 1965 Seismic tests; Two Forks damsite; Upper South Platte Unit Investigations; MRBP, Colo. (Sept. 9, 1965)
TR-3045 1965 Flow distribution studies in the evaporators of the Roswell demineralization plant, Roswell. N. Mex. (Aug. 9, 1965)
TR-3043 1965 Field inspection; Glen Canyon Dam and Powerplant; CRSP. (Aug. 9, 1965)
TR-3034 1965 Inspection of left diversion tunnel; Glen Canyon Dam; CRSP. (Aug. 2, 1965)
TR-3028 1965 Chemical sealant treatment and ponding seepage tests; Canal A, Fort Clark Unit; MRBP; LCCL Program. (July 6, 1965)
TR-3024 1965 Preparation of piezometer test facilities in River Outlet No. 3 and measurement of bellmouth pressures in the tunnel plug outlet works; Glen Canyon Dam; CRSP. (July 7, 1965)
TR-3006 1965 Attendance at Institute on Management of Scientific and Engineering Organizations conducted by Civil Service Commission; May 17-21, 1965; Washington, D.C. (June 4, 1965)
TR-3005 1965 Flow distribution studies in the evaporators of the Roswell demineralization plant, Roswell, New Mexico (May 26, 1965)
TR-300 1947 Field Hydraulic Tests on San Diego Aqueduct; San Diego Aqueduct Project (Oct 23, 1947)
TR-30 1943 Field acceptance tests; Pumping Plant "D": Modoc Unit; Tule Lake Div.; Klamath Project (Jan. 8, 1943)
TR-3 to TR-3570 1940 Field Trip Reports 1940 to 1969, PDF copy of printed index [PDF] 2.1 MB
TR-3 1940 Glendive Pumping Plant acceptance tests; Buffalo Rapids Project (Jan. 8, 1940)
TR-2993 1965 Inspection of Roswell Demineralization Demonstration Plant and review of instrumentation for studying internal flows; Office of Saline Water. (Apr 29, 1965)
TR-2991 1965 Hydraulic turbine acceptance test; Tunnel and siphon hydraulic friction test; Spring Creek Powerplant, Trinity River Div.; CVP. (Apr. 23, 1965)
TR-299 1947 Program for development and standardization of water measurement devices; Regions 3 and 4 (Oct. 22, 1947)
TR-298 1947 Totalizing propeller-type meters for measurement of irrigation water in Southern California And on the South Ogden Conservation District, Utah. (Oct. 22, 1947)
TR-2979 1965 Retreatment with a chemical soil sealant and seepage measurements on Lateral 21.2-17.0; Madera Irrigation District; CVP, California; LCCL Program. (Mar. 24, 1965)
TR-2977 1965 Inspection of left spillway and diversion tunnel; Glen Canyon Dam; CRSP (Apr. 5, 1965)
TR-2975 1965 Participation in ASCE Water Resources Engineering Conference, Mobile, Ala.; Mar. 10-13, 1965. (Apr.2 1965)
TR-2972 1965 Engineering representative visits to U. of Iowa and Iowa State U.; College Recruitment Program. (Mar. 26, 1965)
TR-2969 1965 College contact program (Wis. U., Marquette U..Ga. Inst. of Tech.). (Mar 26, 1965)
TR-296 1947 Trip to Colo. A&M College, Fort Collins. Sept 11, 1947, to observe the operation of a sand trap model. (Kings Consolidated Canal, California; (Oct. 10, 1947)
TR-2958 1965 College recruitment program (U. of Mich., Union Col. Schenectady, Pa. State Col. (Mar. 1, 1965)
TR-2957 1965 College contact program (U.of Detroit, Purdue U.) (Mar. 3, 1965)
TR-2956 1965 Seismic geophysical measurements at drill holes and on tunnel walls at underground powerplant; Morrow Point Dam; Curecanti Unit, CRSP. (Feb. 25, 1965)
TR-2952 1965 Water measurement in open channels by the acoustic method and field inspection of the unwatered Delta-Mendota Canal; CVP; Jan 7-9, 1965. (Feb. 3, 1965)
TR-2948 1965 Engineering representative's visits to colleges; Collcge I Recruitment Program ICornell U., U. cf Maine). (Feb. 2, 1965
TR-2945 1964 Flaming Gorge Visitors Center; Final review of exhibits; Dec. 17, 1964 meeting in Salt Lake City. (Jan. 28, 1965)
TR-2933 1964 Discharge coefficient measurements of the outlet works 72-inch hollow-jet valves and auxiliary outlet works gate air demand rneasurements at Navajo Dam and performance test of a siphon spillway at Sta. 221+05 on the Hammond Main Canal; CRSP. (Dec. 28, 196
TR-2929 1964 Seismic measurements Nambe Falls damsite: Pojoaque Unit; Rio Arriba Div.; San Juan-Chama Project, New Mexico (Dec. 21, 1964)
TR-2924 1964 Inspection and calibration of constant-head orifice turnouts; Florida Project (Dec. 7, 1964)
TR-2914 1964 Use of radioisotopes for inflow-outflow measurements to determine seepage losses; Friant-Kern Canal; CVP; (Nov. 10, 1964)
TR-2911 1964 Participation in Middle Management Institute, Boulder, Colo.; Nov. 16-20, 1964. (Nov. 30, 1964)
TR-2900A 1964 Attendance and presentation of a paper at the ASCE Annual Meeting and Structural Engineering Conference; Oct. 19-23, 1964; New York City. N. Y. (Nov. 6, 1964)
TR-2900 1964 College contact trip to Rose Polytechnic Institute, Terre Haute, Ind. (Nov. 5, 1964)
TR-29 1942 Repair of 58-inch balanced valves in lower outlet tunnel; Shoshone Dam; Shoshone Project (Oct. 30, 1942)
TR-2894 1964 College contact program; U. of Ill. (Oct. 21, 1964)
TR-2888 1964 Attendance at ASCE Hydraulics Div. Specialty Conference, Vicksburg, Miss.; Aug. 18-21, 1964. (Sept. 30, 1964)
TR-2884 1964 Attendance at Fourth lnteragency conference on Hydraulic Laboratory Techniques and Instrumentation at Coastal Engineering Research Center, Washington, D. C.: Sept. 15-16, 1964 (Oct. 5, 1964)
TR-288 1947 Sediment problems in the Loup River Basin in Nebraska (Sept. 18, 1947)
TR-2879 1964 Friction loss measurements; Fremont Canyon power conduit; Glendo Unit, Wyoming (Sept. 29, 1964)
TR-2870 1964 Piezometric measurements in Outlet c. 2 of the left diversion tunnel; Glen Canyon Dam; CRSP; May 1964 (Aug. 28, 1964)
TR-287 1947 Installation of salinity meter recorder and radio transmitter; San Joaquin at Antioch, California (Sept. 23, 1947)
TR-2863 1964 Regional, Project, and Denver Office cooperative programs on radioisotope discharge measurements. Yuma-Mesa "A" Canal, Yuma. Ariz.: and on surface resistance coefficient measurements of cast-in-place concrete pipe, Salt River Project, Phoenix, Ariz.; May
TR-2862 1964 Inspection of certain lengths of the Friant-Kern Canal to determine the feasibility of performing inflow-outflow discharge measurements by the radioisotope method. (Aug. 11, 1964)
TR-286 1947 Reinstallation and operation of Submarine Signal Company 808-J echo-sounding equipment at Elephant Butte Dam. New Mexico, for use in sedimentation studies. (Sept. 23, 1947)
TR-2859 1964 Tehama-Colusa fish spawning channels; discussions in Regional Office, Sacramento, and at the U. of California, Berkeley, California; July 15-17, 1964. (Aug. 14, 1964)
TR-2857 1964 Meeting with staff members of International Power and Engineering Consultants, Ltd.. representing British Columbia Hydro and Power Authority; and field inspection of Portage Mountain damsite; Peace River Project, British Columbia. (Aug. 20, 1964)
TR-2851 1964 Flaming Gorge Lake model; plan development; July 21, 1964 meeting in Salt Lake City. (Aug. 11, 1964)
TR-2849 1964 Observation of Cle Elum Dam outlet works operation: Yakima Project. Wash. (July 23, 1964)
TR-2846 1964 Symposium, "Electrical and Physical Models in Drainage Analyses," 57th annual ASAE meeting, Fort Collins, Colo. (July 9, 1964)
TR-2821 1964 Regional, Project, and Denver Office cooperative programs to provide design information on surface resistance coefficients of cast-in-place concrete pipe and to study radioisotope discharge measurements in closed conduit flow; Salt River Project, Ariz.; M
TR-2818 1964 Inspection of the outlet conduits to determine the existence and causes of cavitation damage, and the adequacy of the air relief grooves: Grand Coulee Dam; CBP. (May 27, 1964)
TR-2817 1964 Acceptance of electrical and geophysical borehole logging equipment and instruction of Bureau personnel on its use (June 9, 1964)
TR-2810 1964 Tractive force test reaches near Sta. 1336. 1430, and 1460; Farwell Main Canal; Middle Loup Div.; LCCL Program; MRBP. (May 25, 1964)
TR-2800 1964 Field tests at Palisades, Idaho. Apr. 23-May 1, 1964, concerning generator amortisseur configuraticns. (May 11, 1964)
TR-28 1942 Inspection of turbine driven pumping units in the Thomas Point Pumping Plant: Lower Yellowstone Project (Oct. 24, 1942)
TR-2796 1964 Participation in Irrigation and Drainage Research Conference; Mar. 19-21, 1964; Utah State U., Logan, Utah. (Apr. 21, 1964)
TR-2790 1964 Radioisotope discharge measurements; Wellton-Mohawk Main Conveyance Channel; Yuma Project: Feb. 11-14, 1964. (Mar. 30, 1964)
TR-2780 1964 Seismic field measurements inlet portal area Blanco Tunnel; San Juan-Chama Project, Colo.-New Mexico (Apr. 8, 1964)
TR-277a 1947 Trip to Valley Gravity Project; McAllen, Tex., Aug. 14-26, 1947. (Sept. 3, 1947)
TR-2771 1964 College contact program (Purdue U.. U. of Minn.) (Mar. 23, 1964)
TR-2770 1964 Engineering representative visits to colleges; College Recruitment Program (Mo. School of Mines. State U. of Iowa). (Mar. 17, 1964)
TR-277 1947 Sedimentation-problems of the Valley Gravity Project in the Lower Rio Grande Valley near McAllen, Tex. (Aug. 11, 1947)
TR-2768a 1963 Discharge measurements for a hydraulic turbine performance test; Dec. 1963; Green Springs Powerplant; Talent Div.; Rogue River Basin Project (Mar. 16, 1964)
TR-2767 1964 Lecture at Fluid Mechanics Seminar and College Recruitment visit; Pa. State U. (Mar. 13, 1964)
TR-2766 1964 Investigation of seepage problems on the main canal of the Hogback Unit; Navajo Irrigation Project (Bureau of Indian Affairs), New Mexico (Mar. 5, 1964)
TR-2763 1964 Observation of Mangla Dam Spillway model operation at St. Anthony Falls Laboratory; U. of Minn., Minneapolis, Minn. (Feb. 24, 1964)
TR-2762 1964 College contact program (Union Col., Schenectady, N. Y., Manhattan Col.. N. Y., MIT, U. of Wis.). (Mar. 4, 1964)
TR-2752 1964 Seismic and accelerometer field measurements at the East Canyon Dam; Weber Basin Project, Utah. (Jan. 31, 1964)
TR-2749 1964 Inspection of viscous flow (Hele-Shaw) analogy model for ground-water studies; Colo State U., Fort Collins, Colo.; Jan. 24, 1964 (Feb. 11, 1964)
TR-2743 1964 Field discussions to establish criteria and responsibility for design of the Tehama-Colusa joint use canal; Sacramento Canals Unit; CVP; Jan. 15, 1964
TR-2735 1963 Participation in IAHR Congress, Sept. 1-5, 1963, London; visits to hydraulic laboratories in Scotland, England, and France, with separate report. (Dec. 26, 1963)
TR-2731 1963 Hydraulic resistance coefficients for cast-in-place pipe; plans for measurements; Salt River Project; Nov. 20-22, 1963 (Dec. 26, 1963)
TR-2723 1963 Seepage measurements on Laterals 24.2-9.0, 24.2-17.0, and 24.2-17.0-2.3; Madera Unit, CVP, Calif.; LCCL Program; (Nov. 21, 1963)
TR-2718 1963 Friction loss measurements on cast-in-place concrete pipe; Lateral 6.2-18.4 Madera Distribution System, Part 2; CVP; Oct. 21-25, 1963 (Dec. 6, 1963)
TR-2710 1963 Use of water on Federal irrigation projects; Assistance to Southern California Development Office; Region 3; Sept. 17-18, 1963; (Oct. 11, 1963)
TR-2708 1963 Attendance at the Irrigation and Drainage Specialty Conference, ASCE, Los Angeles, Calif., Nov 5-8, 1963; (Nov. 21, 1963)
TR-2706 1963 Coordination conference on research activities of Corps of Engineers, TVA and USBR; Oct. 29-31, 1963. Knoxville, Tenn. (Nov. 18, 1963)
TR-2705 1953 Postponding seepage messurements of Lateral 1-Z during Sept. 30-Oct. 2, 1953, after treatment with SS-13; Pathfinder Irrigation District: North Platte Proj., Wyoming; LCCL Program. (Nov. 4, 1963)
TR-270 1947 Current meters on the Rio Grande Project, New Mexico (July 21, 1947)
TR-2693 1963 Attendance at Association for Computing Machinery National Conference. Denver, Colo.; Aug. 27-30, 1963. (Oct. 23, 1963)
TR-269 1947 Totalizing propeller and venturi-type meters for measurement of irrigation water on Valley Gravity Canal and Storage Project, Texas (July 21, 1947)
TR-2684 1953 Use of radioisotopes for canal flow measurements: Participation in meeting; Sept. 4-5, 1963; U. of Calif. Richmond Field Sta., California (Oct. 7, 1953)
TR-2673 1963 Attendance and participation in the 12th National Hydraulics Div. Conference; ASCE. (Sept. 27, 1963)
TR-2672 1963 Investigation of radioisotope mixing characteristics for discharge measurements in the Yuma-Mesa "A" Canal; Yuma-Mesa Project; June 10-14, 1963. (Aug 20, 1963)
TR-267 1947 Tests of Lower River Outlet in Block 45, Shasta Dam (Aug. 26, 1947)
TR-2669 1963 Piezometric and air demand measurements of the 4-by 4-foot tandem gate in the auxiliary outlet works of Navajo Dam and inspection of the siphon spillway at Sta. 221+00 on the Hammond Canal; CRSP. (Aug 14, 1963)
TR-2668 1963 Seismic measurements of the elastic modulus of rock in place at the Yellowtail Dam; MRBP, Mont. (Sept. 19, 1963)
TR-2661 1963 Hydraulic model study by the Geological Survey Hydraulic Laboratory, Phoenix, Ariz.; Mexican salinity investigations. (Sept. 18, 1963)
TR-2658 1963 Radioisotope flow measurements; All-American and Coachella Canals; May 20-24, 1963. (Aug. 5, 1963)
TR-2651 1963 Attendance at Symposium on Transient Groundwater Hydraulics; July 26-27, 1963; Colo. State U., Fort Collins. Colo. (Aug. 16, 1963)
TR-2650 1962 Seepage loss measurements to evaluate effectiveness of 1962 chemical sealant application; West Lateral; Talent Div.; Rogue River Basin Proj., Oreg.; May 1963. (Aug. 8, 1963)
TR-2636 1963 Prototype tests of the hollow-jet valve stilling basin, auxiliary jet flow gate, and general inspection of the hydraulic structures at Trinity Dam; CVP, California (July 26, 1963)
TR-2635 1963 Travel to Sacramento. California to observe field conditions at Oroville damsite and to present laboratory test data to the California Department of Water Resources and its Board of Consultants. (July 26, 1963)
TR-2630 1963 Seepage measurements on Laterals 7.2 and 19.1; LCCL Program; Angostura Unit; MRBP, South Dakota (July 1, 1963) F-622
TR-2626 1963 Final seismic measurements of the modulus of elasticity of rock in place at the Morrow Point damsite and underground powerplant. Colo.; Curecanti Unit; CRSP. (July 2, 1963)
TR-2610 1963 Seepage measurements and treatment with SS-13 of Lateral 1-Z; Pathfinder Irrigation District; North Platte Project, Wyo. (May 17, 1963)
TR-261 1947 Report on trip to attend conference on plan for development of Middle Rio Grande Project (July 3, 1947)
TR-2591 1963 Measurement of air demand of 64-inch jet flow gate in the auxiliary outlet works of Trinity Dam; and preparations for Clear Creek tunnel and Spring Creek power conduit frictional resistance measurements; Trinity River Div.: CVP. (May 8, 1963)
TR-2586 1963 Denver Office and CBP combined aquatic weed research and conveyance capacity program using project waterways: 1963. (Apr. 22, 1963)
TR-2582 1953 Seismic measurements of the elastic modulus of rock in place at the site of jack 1oading tests in the left abutment foundation tunnel at elevation 3530; Glen Canyon Dam; CRSP. (Apr. 23, 1953)
TR-257a 1947 Sediment problems on the Valley Gravity Project In Lower Rio Grande Valley near McAllen, Texas (June 17, 1947)
TR-2578 1953 Seepage measurements and preparation for treatment with Chevron Soil Sealant of Lateral 24.2-17.0; Madera Unit Extension; CVP, Calif.; LCCL Program. (Mar. 28, 1953)
TR-2571 1963 Friction loss measurements for Grant Street concrete tile drain, Coachella Div.. All-American Canal System. using radioactive isotope discharge rneasurements;Jan. 30-Feb. 8, 1963. (Apr. 1, 1963)
TR-257 1947 Installation of pressure cells in miter gate, tilting section of dry dock and access shaft of floating caisson, Grand Coulee Dam; and use of NK-2 echo sounder as a means for determining depth of water on the spi1lway of Grand Coulee Dam. (June 17, 1947)
TR-2565 1963 Detail to Commissioner’s Office to assist in recearch and related activities. (Apr. 3, 1963)
TR-2555 1963 Visit to U. of S.C. and U. of Ill.; College recruitment program; Mar. 4-7, 1963. (Mar. 18, 1963)
TR-2549 1963 Preparation for pressure distribution measurements in Outlet No. 2, Left Diversion Tunnel outlet works and River Outlet No. 3; Glen Canyon Dam; CRSP; Jan. 13-18, 1963 (Feb. 7, 1963)
TR-2548 1963 Attendance at Federal Interagency Sedimentation Conference, Jackson, Miss.; Jan. 28-Feb. 1, 1963. (Mar. 5.1963)
TR-2547 1963 Engineering representative visits to colleges; College Recruitment Program (Lehigh U.. Wayne State U. (Mar. 8, 1963)
TR-2546 1963 Silting and seepage investigations; North Platte Project, Wyoming (Mar. 6, 1963)
TR-2541 1963 Ponding method seepage measurements prior to installation of waterborne soil sealant; Walters Lateral; Tucumcari Project; LCCL Program. (Feb. 15, 1963) F-622
TR-2535 1963 Invert frictional resistance measurements and examination of a portion of the concrete lining surfaces of Clear Creek Tunnel; Trinity River Div., CVP. (Feb. 6, 1963)
TR-2526 1963 College contact program (Auburn U., Purdue U., U. of Detroit). (Jan. 22, 1963)
TR-2523 1963 Witnessing shop tests of 8-inch, 7-stage pump for the Hydraulics Branch. (Jan. 25, 1963)
TR-2518X 1963 Rotation assignment to Lewiston, Whiskeytown, and Redding, Calif., and vicinities for approximately 3 months' duration; Trinity River Div.; CVP, (prior to assignment to Hydraulics Branch staff). (Jan. 9, 1963)
TR-2518 1963 Second phase of seismic field measurements of the elastic modulus of foundation rock in place at the Morrow Point dam site, Colo.; Curecanti Unit: CRSP. (Jan. 2, 1963)
TR-2516 1963 Inspection of Oroville Dam spillway site and discussions of Oroville Dam model studies: State of California, Department of Water Resources. (Jan. 17, 1963)
TR-2509 1962 Seepage measurements on Laterals 7.2 and 19.1, Angostura Unit, MRBP, and the Shaw Lateral, Belle Fourche Project; and treatment of Lateral 19.1. Angostura Unit, with Chevron Soil Sealant; LCCL Program. (Oct. 25, 1962)
TR-2508 1962 Engineering representatives' visits to colleges; College Recruitment Prqram, (U. of Ill.). (Dec. 17, 1962)
TR-2482 1962 Electrical logging tests to detect seepage in canals and laterals; Eden Project, Wyoming; Soil and Moisture Conservation and LCCL Program; FY63. (Oct. 31, 1962)
TR-248 1946 Trip to Lower Colo. and Lower and Middle Rio Grande Valleys (sediment control). (Apr. 28, 1946)
TR-2474 1962 Canal capacity test program; Capacity tests on Charles Hansen Canal; CBTP. (Sept. 24, 1962)
TR-2470 1962 Use of radioisotopes for flow measurement; Attendance at meeting; Sept. 5-7, 1962; U. of California and California Research Corporation. (Oct. 9, 1962)
TR-2452 1962 Silting and seepage investigations; North Platte Project Wyoming (Sept. 14, 1962)
TR-2448 1962 Observations of hydraulic tests of Fort Randall Dam Spillway performed by Corps of Engineers July 25, 1962. (Sept. 27, 1962)
TR-2447 1962 Attendance at ASCE Eleventh Hydraulics Div. Conference, Davis, California; Aug. 15-17, 1962. (Sept. 20, 1962)
TR-244 1947 Field tests on Howell-Bunger valves for Ross Dam, City of Seattle. (Apr. 9, 1947)
TR-2431 1961 Canal capacity test program; Roza Main Canal; Yakima Project (July 25, 1961)
TR-2423 1962 Chemical sealant installation; West Lateral and West Lateral Extension; Rogue River Basin Project, Oregon LCCL Program. (Aug. 7, 1962)
TR-2415 1962 Canal capacity study. program: Capacity test of Gateway Canal, Apr. 25-26, 1962; Weber Basin Project, Utah (July 19, 1962)
TR-2404 1962 Seismic measurements of the elastic modulus of rock in place at the site of jack loading tests in the left abutment foundation tunnel at elevation 3480; Glen Canyon Dam; CRSP. (July 9, 1962)
TR-2402 1962 Seepage measurements and treatment with Chevron Soil Sealant of Laterals 7.2 and 19.7 Angostura Project, MRBP; and the Shaw Lateral, Bell Fourche Project; LCCL Program. (June 18, 1962)
TR-240 1947 Inspection of miter gates, floating caisson, needle valve R-9; Grand Coulee Dam: and inspection of Soao Lake Siphon, West Canal; CBP. (Mar. 24, 1947)
TR-2394 1962 Canal capacity test program; Roza Main Canal; Yakima Project, and chemical sealant installation in Laterals WB5G and WB5K, Block 20: CBP; Mar. 1962. (May 28, 1962)
TR-2392 1962 Attendance at ASCE First Water Resources Conference. Omaha, Nebr ;May 14-18, 1962. (June 1, 1962)
TR-239 1947 LCCL Program; Region 5. (Mar. 18, 1947)
TR-2380 1962 Seismic field measurernents of the elastic modulus of foundation rock in place at the Morrow Point Dam site, Colo.; Curecanti Unit; CRSP. (May 7, 1962)
TR-2373 1952 Use of radioisotopes for water measurement in the Yuma Mesa Div., No. 1 “A”and “B” Canals: Gila Project, Ariz.: Feb. 1962. (Apr. 5, 1952)
TR-2371 1962 Joint meeting at Norris, Tenn., with representatives from Corps of Engineers and TVA to study and evaluate existing TVA data on radial gates, April 23, 1962. (Apr. 23, 1962)
TR-2362 1962 Engineering representative's visits to colleges; College Recruitment Program, (State U. of Iowa, Marquette U.) (Mar. 27, 1962)
TR-236 1947 Measurement of irrigation water on Gila Project, Ariz. (Feb. 26, 1947)
TR-2356 1962 Examination of Gateway Canal and selection of test reaches; Weber Basin Project; Canal capacity studies. (Mar. 7, 1962)
TR-235 1947 Measurement of irrigation water on Yuma Project (Feb. 26, 1947)
TR-2341 1962 College contact program (U.of Mich., U. of Detroit. Tulane U., La. State U., U. of Miss.). (Feb. 5, 1962)
TR-2339 1961 Chemical sealant installation in Laterals WB5G and WB5K, Block 20, CBP; Oct. 1961; FY62. LCCL Program. (Jan. 17, 1962)
TR-2337 1961 Report of attendance at Ninth Convention, IAHR, Yugoslavia, Dubrovnik; including visit to hydraulic laboratories in the USSR, France, and England (with separate report of same). (Sept. 1961)
TR-2325 1961 Observation of field experiment using a petroleum-based emulsion canal sealant after one season of canal operation; LCCL Program, FY62 Eden Project. Wyoming (Nov. 9, 1961)
TR-2318 1961 Selection of concrete-liner test reaches of the Charles Hansen Feeder Canal and the Charles Hansen Canal suitable for capacity tests. (Dec. 1, 1961)
TR-2316 1961 Flow measurements using radioisotopes; Review and discussion of April 12-14 Yuma demonstration and Region 3 FY62 Water Measurement Program; U. of California, Berkeley; Sept. 5-8, 1961. (May. 15, 1961)
TR-2313 1961 Turbine performance check test on the unit at Green Springs Powerplant; Talent Div.; Rogue River Basin Project (Nov. 28, 1961)
TR-2303 1961 Field test of the electrical logging of canals to detect seepage; Helena Valley Canals, Helena, Mont.; Soil and Moisture Conservation Program, FY62. (Oct. 31, 1961)
TR-2300 1961 Experimental treatment of Bypass B, 1 Lateral 10.2 Black Canyon Irrigation District, Idaho, with waterborne chemical soil sealants: LCCL Program. (Oct. 18, 1961)
TR-230 1947 Testing of air-admission mechanism for 96-inch flap gate: Pumping Plant No. 1; Gila Project (Mar. 25, 1947)
TR-2299 1961 Lectures to classes in hydraulic engineering at the Univ. of Ill.,Urbana, Ill. (Nov. 6, 1961)
TR-2298 1961 Attendance at the Tenth Hydraulics Div. Conference; ASCE. (Nov. 6, 1961)
TR-2294 1961 Velocity distribution and head loss measurements in conjunction with capacity tests of Delta-Mendota Canal; CVP; July 10-17, 1961. (Sept. 22, 1961)
TR-2280 1961 Geophysical testing by the seismic method; San Luis Dam and Forebay and other areas: CVP, California (Sept. 29, 1961)
TR-2279 1961 Silting and seepage investigations; North Platte Project, Wyoming (Sept. 7, 1961)
TR-226 1947 Field laboratory at Utah Agricultural College Experiment Station, Logan, Utah. (Feb. 12, 1947)
TR-2253 1961 Trip to State of California Department of Water Resources Offices in Sacramento and Oroville, California, relative to Oroville Dam model studies. (Aug. 10, 1961)
TR-2249 1961 Technical assistance during an experimental chemical canal sealant test; Eden Project, Wyoming; LCCL Program, FY61. (Aug. 1, 1961)
TR-2248 1961 Trip to Billings Office to build an exhibit. (Aug. 3, 1961)
TR-2244 1961 Field testing of the electrical logging method to detect seepage in canals on the Tucumcari Project New Mexico; Soil and Moisture Conservation Program, FY61. (June 15, 1961)
TR-224 1947 Water measuring devices to be used in the distribution system to be completed under be supplemental repayment contract with Coachella Valley County Water District; All-American Canal System (Feb. 5, 1947)
TR-223 1947 Control of discharge capacities: pumping plant; Gila Project (Jan. 30, 1947)
TR-2223 1961 Symposium on basic research in civil engineering fields related to water resources. Fort Collins. Colo. (June 22, 1961)
TR-222 1947 Meeting of Sedimentation Subcommittee of the Federal Interagency River Basin Committee. (Mar. 6, 1947)
TR-221 1947 Sediment Conference with other agencies at Albuquerque and visit to Region 5 office. (Mar. 6, 1947)
TR-2207 1961 Attendance at ASCE Convention, Phoenix, Ariz.; Apr. 10-14, 1961. (May 11, 1961)
TR-2206 1961 Moveable bed flume tests using radioactive-labeled sand; Hydraulic Laboratory; Colo. State U. (Apr. 24, 1961)
TR-2205 1961 Symposium on Basic Research in Civil Engineering Fields Related to Water Resources. (May 8, 1961)
TR-2194 1961 Silting and seepage investigations; North Platte Project (Mar. 15, 1961)
TR-2190a 1961 College contact program (Ga. Inst. of Technology, U. of S.C., The Citadel, Charleston, Clemson Col.). (Mar. 16, 1961)
TR-2190 1961 College contact program (Iowa State U., Mich. State U., Mich. Col. of Mining & Technology, State U. of Iowa). (Mar. 16, 1961)
TR-2180 1961 Observation of the unwatered upper 30 miles of Delta-Mendota Canal and discussions wiih CVP personnel regarding canal capacity tests. (Feb. 2, 1961)
TR-2179 1961 Seismic field tests in connection with foundation exploration; Causey Dam; Weber Basin Project. Utah. (Feb. 17, 1961)
TR-2177 1961 Visit to Air Force Academy to obtain design and operational information concerning smoke tunnel test facility. (Feb. 13, 1961)
TR-2162 1960 Sediment tests on prototype diversion dams; Kansas River Basin, Nebraska (Sept. 9, 1960)
TR-216 1946 Seepage loss measurements in Region 2; LCCL Program. (Dec. 16, 1946)
TR-2153 1960 Inspection of Eklutna Tunnel and performance of hydraulic tests; Eklutna Project. Alaska (Sept. 12, 1960)
TR-2152 1960 Turbine performance and CO2 concentration tests on the unit at Green Springs Powerplant: Talent Div. Rogue River Basin Project (Nov. 17, 1960)
TR-2151 1960 Coordination of research and development work of the Corps of Engineers, TVA, and the USBR Meeting at Waterways Experiment Station, May 9-12, 1960. (June 10, 1960)
TR-2143 1960 Seepage loss measurements, Eden Project Wyoming: and Gateway Canal, Weber Basin Project, Utah; LCCL Program. (Nov. 9, 1960)
TR-2135 1960 Attendance at symposium on basic science in France and United States; N.Y.U.; Oct. 17-19, 1960. (Nov. 16, 1960)
TR-2128 1960 Silting and seepage investigations, North Platte Project; (Sept. 20, 1960)
TR-2127 1960 Seepage loss studies; Kirwin Main Canal, MRBP; LCCL Program. (Oct. 21, 1960)
TR-2120 1960 Electrical logging field tests to detect seepage on the Kirwin Main Canal LCCL Program: Solomon Div.; MRBP, Kansas (Oct. 19, 1960)
TR-2113 1960 Planning meeting for proposed symposium on basic research in civil engineering fields as related to water resources in Reclamation. (Oct. 4, 1960)
TR-2109 1960 Silting and seepage investigations; North Platte Project (Sept. 8, 1960)
TR-2108 1960 Silting and seepage investigations; North Platte Project (Aug. 17, 1960)
TR-2106 1960 Participation in the Ninth National Conference; Hydraulics Div.; ASCE; U. of Wash., Seattle, Wash., Aug. 17-19, 1960. (Sept. 19, 1960)
TR-2095 1960 Discussion meeting at Sacramento, California, June 27-July 1, 1960, on conveyance capacities of large canals. (Aug. 1, 1960)
TR-2092 1950 Attendance and participation in ASCE and USCOLD Convention in Reno. Nev. June 20-24, 1950. (July 19, 1960)
TR-2091 1960 LCCL Program; North Platte Project (May 10, 1960)
TR-2090 1960 Field tests to develop data on conveyance capacities of large canals in the CBP. (May 3, 1960)
TR-2084 1960 Chemical sealant tests on Indian Bend Pump Lateral; Salt River Project, Ariz.; May-June 1960; LCCL Program. (July 15, 1960)
TR-2083 1960 Seepage control demonstration using the chemical SS-13 as a sealant on a small canal near Hudson. Colo. June 24, 1960. (July 15, 1960)
TR-2078 1960 Wind velocity, direction, and wave height instrument installation and profile survey on Driftwood-Meeker Canal for the purpose of studying the erosion effect of wind-generated water waves on earth-lined canals; MRBP. (July 13, 1960)
TR-2071 1960 Discussion of proposed cosponsorship of basic research symposium with officials of Colo. State U.; July 11, 1960. (July 14, 1960)
TR-2061 1960 Attendance at meering of Board of Consultants Iowa Institute of Hydraulic Research Iowa Citv, Iowa May 18, 1960. (June 10, 1960)
TR-206 1946 Seepage less measurements in Region 3; LCCL Program. (Dec. 12, 1946)
TR-205 1946 Water measuring devices to be used in the distribution system to be constructed under the supplemental repayment contract with Coachella Valley County Water District; All-American Canal System. (Dec. 12, 1946)
TR-2047 1960 Repairs to damaged concrete surfaces at discharge ends of outlet conduits, Grand Coulee Dam; (Apr. 15, 1960)
TR-2036 1960 Field tests to develop data on conveyance capacities of large canals in the CBP. (Mar. 29, 1960)
TR-2034 1960 College contact program ([U. of Ky., U. of Wis., Marquette U., U. of Tenn., Purdue U., Rose Polytechnic Institute). (Mar. 3, 1960)
TR-2033 1959 College recruitment trip (U. of Mo.. Mo. Sch.of Mines and Metallurgy, U. of Tenn., U. of Ky.,U. of Ill.,U. of Wis.). (Dec. 18, 1959)
TR-2032 1960 Rotation engineering field assignment to Navajo Dam; CRSP. (Mar. 31, 1960)
TR-2030 1959 Participation in hydraulic tests on prototype Tunnel No. 10 of Fort Randall Dam, Aug. 10-13, 1959, performed by Corps of Engineers. U.S. Army. (Oct. 13, 1959)
TR-2025 1960 Turbine discharge calibrations; Gateway Powerplant; Weber Basin Project (Feb. 24, 1960)
TR-2023 1959 Attendance at ASCE Convention, Washington, D.C.; Oct. 19-22, 1959 (Dec. 11, 1959)
TR-2019 1960 Inspection and repair of damaged areas in concrete exit troughs of the intermediate and upper outlets; Grand Coulee Dam; CBP. (Feb. 9, 1960)
TR-2018 1960 Ponding seepage tests using Chemical Sealant SS-13. Lateral 10.2 bypass; Black Canyon Irrigation District; LCCL Program.
TR-2009-12 2009 Travel to Cle Elum Dam [PDF]
TR-2009-11 2009 Travel to the Santa Magarita River Watershed and O'Neil Diversion Weir
TR-2008-10 2009 Trqavel to Milk River Basin, MT
TR-2008-09 2009 Trip Report - Galgary, AB Canada - Control Nos. 090, 091, 092
TR-2008-08 2008 Site visit to review Water 2025-funded improvements to Lugert-Altus Irrigation District Altus, OK
TR-2008-07 2008 Lake Red Bluff Bathymetry Survey, Sacramento River, Central Valley Project, California [PDF] 0.45 MB
TR-2008-06 2008 Trip Report -Spillway Modal Survey and Operational Testing at El Vado Dam, New Mexico
TR-2008-05 2008 Trip Report - Spillway Modal Survey and Operational Testing at El Vado Dam, New Mexico
TR-2008-04 2008 Amarillo Canal Flow Capacity Test Site Visit
TR-2008-03 2008 Nimbus Dam Tailwater Bathymetry Survey, American River, Central Valley Project [PDF] 0.23 MB
TR-2008-02 2008 Trip Report - Travel to Utah Ststae University to observe Folsom Auxiliary Spillway physical modeling activites
TR-2008-01 2008 Site visit to Folsom Auxiliary Spillway Model at St Anthony Falls Laboratory Minneapolis, MN
TR-2007-17 2007 Travel Report - Taipei, Taiwan - Control Numbers: 043, 044, 045, 046, and 047 [PDF] 0.02 MB
TR-2007-16 2007 Trip Report - Aix-les-Bains, France - Control No. 029 [PDF] 0.02 MB
TR-2006-15 2006 Missouri River Pump Intake Sites in North Dakota [PDF] 1.4 MB
TR-2006-14 2006 Travel to Tom Green County Water Control and Improvement District #1 near San Angelo, Texas [PDF] 0.4 MB
TR-2006-13 2006 Travel to Sante Fe, New Mexico, to provide flow measurement assistance to the Pojoaque Valley Irrigation District. [PDF] 0.8 MB
TR-2006-12 2006 Millerton Reservoir Temperature Monitoring Pgrogram (Friant Dam) [PDF] 0.2 MB
TR-2006-11 2006 Travel to Mirage Flats Irrigation District (MFID) near Hay Springs, to provide technical assistance with electronic canal monitoring/control and telemetry equipment. [PDF] 0.1 MB
TR-2006-10 2006 Travel to Lugert-Altus Irrigation District, Altus, Oklahoma [PDF] 0.4 MB
TR-2006-09 2006 Travel to Pioneer Irrigation District (near Haigler, NE) to provide assistance with field calibration of submerged orifice structures and an elbow meter structure. [PDF] 0.2 MB
TR-2006-08 2006 Travel to Laughlin (NV), Needles (CA) ,and Blythe (CA) [PDF] 0.2 MB
TR-2006-07 2006 Travel to Fallon, Nevada for discussions regarding flow measurement at the Truckee-Carson Irrigation District [PDF] 0.3 MB
TR-2006-06 2006 Travel to Lahontan Basin Area Office (LBAO) in Carson City, NV, Fallon Field Office (FFO) in Fallon NV, & Truckee-Carson Irrigation District (TCID) in the Fallon NV area. [PDF] 0.2 MB
TR-2006-05 2006 Controlotron Flowmeter, Big Thompson Powerplant, near Loveland, Colorado [PDF] 0.1 MB
TR-2006-04 2006 Travel to Montreal, Quebec, Canada - Control No. 047; April 24-27, 2006 [PDF] 0.2 MB
TR-2006-03 2006 Travel to Idaho Falls, ID and vicinity, June 6-7, 2006 [PDF] 0.3 MB
TR-2006-02 2006 Travel to Yuma, Arizona & surrounding vicinity [PDF] 0.2 MB
TR-2006-01 2006 Travel to Carlsbad, New Mexico, to provide flow measurement assistance to the Carlsbad Irrigation District; February 13-17, 2006 [PDF] 0.4 MB
TR-2005-12 2005 Travel to Pioneer Irrigation District (near Haigler, NE) to perform preliminary calibrations on recently installed differential head turnout measurement instruments.
TR-2005-11 2005 Travel to Altus, Oklahoma to Visit Flow Measurement Sites and Check Structures on the W.C. Austin Project, November 21-26, 2005 [PDF] 0.6 MB
TR-2005-10 2005 Travel to Seattle, Washington to Participate in Meetings of CEA Technologies, Inc. (CEATI), Regarding Embankment Dam Breach Research, Sept. 12-15, 2005 [PDF] 0.1 MB
TR-2005-09 2005 Travel to Montreal Quebec (Canada) to attend two day meeting of CEA Technologies Inc. (CEATI) Water Management Interest Group (WMIG)
TR-2005-02 2005 Travel to Malmo, Sweden, to participate in the CEA Technologies, Inc. (CEATI) Dam Safety Interest Group (DSIG) Meeting, May 9-12, 2005 [PDF] 0.1 MB
TR-2005-01 2005 Travel to Pioneer Irrigation District (near Haigler), NE) and Riverside Irrigation District (near Culbertson, NE) to assist in establishing flow measurement and improved canal operations
TR-2005 1959 Attendance at first Triennial Technical Conference on Irrigation, Drainage and Flood Control. Reno, Rev., May 11-12, 1959: Visit to Salt River Project, Ariz. relative to LCCL Program and to observe calibration of slide gates by Salt River Valley Water Use
TR-2002 1959 Attendance at Personnel Management for Executives Conference, Oct. 21-30, 1959, At Brook Forest Inn and Chalets near Evergreen, CO.
TR-2001 1959 Attendance at the Eighth Congress of the IAHR, Montreal, Quebec, Canada; Aug. 23-29 1959. (Oct. 15, 1959)
TR-1995 1959 Canal lining studies, Helena Valley Unit, MRBP (Nov. 12, 1959)
TR-1981 1959 Measurements of outlet pipe manifold head losses and slide gate hydraulic downpull; Palisades Dam Outlet Works; Palisades Project (Sept. 22, 1959)
TR-1962 1959 Controlled test releases through Glendo Dam Outlet Works and Powerplant; MRBP. (July 16, 1959)
TR-1958 1959 Participation in the Eighth National Conference; Hydraulics Div.; ASCE; Colo. State U., Fort Collins, Colo.; July 1-3, 1959. (July14, 1959)
TR-194 1946 Installation and operation of display models in Exhibit Building; Boulder Dam; Boulder Canyon Project (Nov. 8, 1946)
TR-1935 1959 College recruitment; March 2-13, 1959(U.of Mo., Mo. Sch. of Mines, U. of Ky., Rose Polytechnic Inst., Purdue U..U.of Ill.). (Mar. 30, 1359)
TR-1934 1959 Operating studies; San Acacia Diversion Dam; Socorro Canal headworks; Middle Rio Grande Project, New Mexico (Mar. 24, 1959)
TR-1933 1959 Second hydrostatic test of outlet pipe manifold; Delivery C; Spec. DC-3675; Palisades Project (Mar. 18, 1959)
TR-1932 1958 Tests on concrete pipe drain installations; Coachella Valley Drainage System; All-American Canal System; Boulder Canyon Project; Jan. 28-Feb. 26, 1958. (Mar. 23, 1959)
TR-1930 1959 College recruiting (U. of Tenn.. U. of S.C.. The Citadel, Charleston, N.C. State Col.. Duke U.). (Feb. 18, 1959)
TR-1929 1958 Inspection of Glendo Dam outlet works stilling basin; MRBP, Wyoming (Aug. 7, 1958)
TR-1927 1959 Anendance at the ASCE, Los Angeles Convention: Feb. 9-13, 1959. (March 6, 1959)
TR-1924 1959 Performance tests and inspection of pump-turbine units; Thomas Point Hydraulic Pumping Plant: Lower Yellowstone Project (Feb. 20, 1959)
TR-1923 1958 Field measurements of pier losses, Delta-Mendota Canal, CVP, California; and review of draft of Report on Sand Deposits in Canals, U. of California, Berkeley (Sept. 20, 1958)
TR-1921 1959 Correcting relief map in Governor's office in Cheyenne
TR-1916 1959 Detail to Colorado River Front Work and Levee System Office. Needles. California (Jan 23, 1959)
TR-191 1946 Inspect field conditions in the Sacramento-San Joaquin Delta and to confer with Regional Director's staff relative to salinity encroachment. (Oct. 30, 1946)
TR-1906 1956 Attendance at Business meeting of Executive Committee; Hydraulics Div., ASCE, St. Louis, Mo., Nov. 3-4, 1958 (Nov. 25, 1958
TR-1905 1958 Review in Australia of Snowy Mountains Hydro-Electric Authority's hydraulic laboratory work and proposed designs on the Adaminaby-Snowy Project (Nov. 21, 1958)
TR-1897 1958 Volumetric calibration of north raw water Venturi meter; Lake Hefner water treatment plant, Oklahoma City, Okla., Sept. 1956. (Nov. 6, 1958)
TR-1894 1958 Inspection and measurements of raw water Venturi meter; Lake Hefner Water Plant, Oklahoma City, Okla. (Sept. 29, 1958)
TR-1891 1958 Seepage Tests; Franklin Canal; LCCL Program; Bostwick Div., Nebraska: MRBP. (Oct. 27, 1958)
TR-1882 1958 College contact-Univ. of Missouri
TR-1881 1958 Attendance at Hydraulics Div. Conference; ASCE, Atlanta, Ga.; Aug. 19-22, 1958 (Sept. 10, 1958)
TR-186 1946 Study of supersonic echo sounding equipment and other electronic devices for use on hydrographic surveys; sedimentation program. (Oct. 17, 1946)
TR-1849X 1958 Attendance at Berlin prestressed…
TR-1849 1958 Attendance at the ASCE Convention in Portland, Ore.; June 23-27, 1958 (July 7, 1958)
TR-1848 1958 Attendance at Seventh Hydraulics Conference; Iowa Institute of Hydraulic Research; State U. of Iowa. Iowa City, Iowa. (July 7, 1958)
TR-1846 1958 Field trip to North Fork of South Platte River to obtain water surface elevations to verify the model study. (June 30, 1958)
TR-1845 1958 Field trip to North Fork of South Platte River to obtain water surface elevations to verify the model study. (June 27, 1956)
TR-1840 1958 Field trip to North Fork of South Platte River to obtain water surface elevations to verify the model study. (June 19, 1958)
TR-1839 1958 Trip to North Fork of South Platte River to make reconnaissance for proposed model study. (June 18, 1958)
TR-1829 1957 Detail to food and agriculture organization of the United Nations for technical assistance to Japan; Nov.-Dec, 1957. (May 22, 1958)
TR-1828 1958 College Contact Program; Visit to Univ. of Wisc.; Apr 24-25, 1958. (May 15, 1958)
TR-1823 1958 Lecture at seminar for irrigation engineering; Colo. State Univ., Fort Collins, Colo.; Apr. 1, 1958. (Apr. 7, 1958)
TR-1815 1958 Hydrostatic test of outlet pipe manifold: Deliivery "C" Spec. DC-3675; Palisades Project (Feb. 11, 1958)
TR-1794 1957 Observation of compacted earth lining on Boulder Creek Supply Canal; LCCL Program; CBTP Program (Dec. 10, 1957)
TR-1782 1957 College Contact. Presentation of talk to student chapter, ASCE, Univ. of Missouri (Nov. 25, 1957)
TR-1781 1957 Attendance at the Annual Convention of the ASCE. New York City; Oct. 14-18, 1957. (Nov. 13, 1957)
TR-1774 1957 Attendance at the Seventh Congress of the IAHR, Lisbon, Portugal; July 24-31, 1957. (Oct. 21, 1957)
TR-1773 1957 Field inspection of Lateral 1, Interstate Canal; North Platte Project, Wyoming-Nebraska; LCCL Program; June 6-7, 1957. (Sept. 27, 1957)
TR-1769 1957 Installation of manometers for evaporation suppression studies; Lake Hefner, Okla. (Oct. 14, 1957)
TR-1764 1957 Obtaining hydraulic data for erosion and tractive force study of unlined and earth lined canals; Region 5; LCCL Program. (Sept. 4, 1957)
TR-1762 1957 Attendance at Hydraulics Div. meeting; ASCE, Cambridge, Mass.; Aug. 25-29, 1957. (Sept. 20, 1957)
TR-1760 1957 Meeting of hydraulic engineers representing hydraulic laboratories of the Corps of Engineers; Aug. 6-9, 1957. (Sept. 12, 1957)
TR-1759 1957 Sediment sampling and water measurement program; Angostura Canal; LCCL Program; MRBP. (Aug. 15, 1957)
TR-1754 1957 Observation of the jetty field installations on the Middle Rio Grande Project, New Mexico, June 10-13, 1957. (Aug. 14, 1957)
TR-1752 1957 Obtaining hydraulic data for erosion and tractive force study of unlined and earth-lined canals; Region 1; LCCL Program. (Aug. 7, 1957)
TR-1750 1957 Obtaining hydraulic data for erosion and tractive force study of unlined and earth-lined canals; Region 4; LCCL Program. (July 11, 1957)
TR-1744 1957 Presentation of paper and attendance at annual meeting American Society for Engineering Education, Ithaca, N. Y. (July 16, 1957)
TR-174 1946 Seepage investigations; Mirage Flats Project (Oct. 8, 1946)
TR-1738 1957 Observation of jetty installations during 1957 spring runoff, May 20-23, 1957; Middle Rio Grande Project, New Mexico (June 7, 1957)
TR-1729 1957 Soil samples and field observations for canal erosion and tractive force study; Tucumcari and L. C. Austin Projs.; Region 5. (Apr. 16, 1957)
TR-1726 1957 Seismic field studies to determine the modulus of elasticity of foundation rock at the Glen Canyon damsite; CRSP. Ariz. (Apr. 10, 1957)
TR-1725 1957 Trip to Hoover Dam relative to addition of the Upper Colorado River Basin features and Palo Verde Dam to display model. (Apr. 10, 1957)
TR-1721 1957 College recruiting. (Mar. 11, 1957)
TR-1720 1957 Seismic field studies to determine the modulus of elasticity of foundation rock at the Glen Canyon damsite; CRSP, Ariz. (Mar. 13, 1957)
TR-1719 1957 Attendance at the ASCE Convention; Jackson, Miss.; Feb. 18-27, 1957. (Mar. 12, 1957)
TR-1714 1957 Selection of field sites for canal erosion and tractive force study; Tucumcari and W. C. Austin Projs.; Region 5. (Feb. 12, 1957)
TR-1711 1956 Attendance at the annual convention of the ASCE in Pittsburgh, Pa.; Oct. 15-20, 1956. (Feb. 5, 1957)
TR-1706 1957 Selection of field sites and obtaining soil samples on canal erosion and tractive force study, Paonia Project, Region 4: and Minidoka. Yakima, and CBP, Region 1; LCCL Program. (Jan. 21, 1957)
TR-1697X 1956 College recruitment. (Dec. 28, 1956)
TR-1697 1956 Seepage tests; Lateral 1; Interstate Canal; North Platte Project; LCCL Program. (Nov. 26, 1956)
TR-1694 1956 Friction loss tests; Weber Branch and Weber Coulee Siphons; East Low Canal; CBP. (Nov. 16, 1956)
TR-1693 1956 Seepage measurements for bentonite sediment lining evaluation; LCCL Program: Lateral 7.2, Angostura Unit; MRBP. (Nov. 5, 1956)
TR-1690 1956 College Contact Program.
TR-1684 1956 Selection of field sites and obtaining soil samples for canal erosion and tractive force study; Eden Project; Region 4, LCCL Program. (Oct. 17, 1956)
TR-1680 1956 Attendance at Hydraulic Div. meeting; ASCE in Madison, Wis.; Aug. 22-24, 1956. (Sept. 17, 1956)
TR-1679 1953 Obtaining hydraulic data for erosion and tractive force study of unlined and earth-lined canals; Region 2; LCCL Program. (Sept. 10, 1953)
TR-1676 1955 Obtaining hydraulic data for erosion and tractive force study of unlined and earth-lined canals; Region 7; LCCL Program. (Sept. 6, 1955)
TR-1669 1956 Performance of outlet works and spillway; Boysen Dam; MRBP. (Aug. 1, 1956)
TR-1668 1956 Field trip to South Platte Supply Canal to obtain data on canal erosion and tractive force study; LCCL Program; July 19, 1956. (July 30, 1956)
TR-1666 1956 Trip to Colo. A&M Coll., Fort Collins; July 26, 1956 to discuss with Dr. M. L. Albertson and Prof. D. B. Simons, data and the proposed report on tractive force and hydraulic data obtained on USBR and other canals. (Aug. 6, 1956)
TR-1651 1956 Geophysical exploration in connection with materials deposits and other features; Trinity River Diversion; CVP; Jan. 26-Apr. 7, 1956. (May 18, 1956)
TR-1648 1956 Third hydrostatic test on penstock and outlet pipes; Spec. No. DC-4255; Glendo Dam and Powerplant; MRBP; Mar. 21-25, 1956. (May 11, 1956)
TR-1641 1955 Seepage measurements and bentonite mixing trial; LCCL Program; Angostura Unit: Middle Rio Grande Project; Sept. 12-24, 1955. (Apr. 4, 1956)
TR-1637 1956 Trip to Colo. A&M Col., Fort Collins; Mar. 30, 1956 to observe and discuss a model study of diffusion of a brine in an open channel. (Apr. 3, 1956)
TR-1636 1956 Second hydrostatic tests of penstock and outlet pipes; Spec. No. DC-4255; Glendo Dam and Powerplant; MRBP; Mar. 12-16, 1956. (Mar. 29, 1956)
TR-1633 1956 Report on college contact Trip; Feb. 15-25, 1956. (Mar. 7, 1956)
TR-1628 1956 Rehabilitation of Angostura Diversion; Middle Rio Grande Project: Feasibility of hydraulic model studies; Jan. 4-13, 1956. (Feb. 9, 1956)
TR-1624 1955 Selection of field sites for canal erosion and tractive force study; Region 2. LCCL Program; Dec. 4-20, 1955. (Jan. 6, 1956)
TR-1622 1955 College Contact Program. (Jan. 18, 1955)
TR-1611 1955 Selection of field sites for studies under LCCL Program to determine relationship between soil characteristics, erosion resistance, and hydraulic properties of canals. (Nov. 25, 1955)
TR-1609 1955 Trip to Colo. A&M Col., Fort Collins, Colo. to discuss tractive force studies and study with the vane borer shear tester. (Nov. 22, 1955)
TR-1604 1955 Operation tests of Seminoe Dam outlet worits needle valves; Kenirick Project, Wyoming (Nov. 3, 1955)
TR-1599 1955 Seepage tests; Lateral 1, Interstate Canal; North Platte Project (Oct. 28, 1955)
TR-1590 1955 Proceedings of the Sixth Congress of the IAHR; The Hague, Netherlands; Aug. 30-Sept. 6, 1955. (Sept. 30, 1955)
TR-1586 1955 Attendance at Hydraulics Div. Meeting; ASCE, Berkeley, California; Aug. 24-26, 1955. (Sept. 20, 1955)
TR-1585 1955 Performance of Carter Lake outlet works stilling basin wave suppressor. Parshall Flume and St. Vrain Supply Canal, and the Flatiron Afterbay outlet works flume, July 7, 1955. (Aug. 9, 1955)
TR-1578 1955 Laboratory course in experimental techniques at State Univ. of Iowa. Iowa City; June 13-July 2, 1955. (Aug. 17, 1955)
TR-1558 1955 Refurbishing display model of Colo. River Basin and painting sculptured panels on the Arizona and Nevada elevator towers; Mar. 25-Apr. 12, 1955. (May 2, 1955)
TR-1550 1954 Fishscreen studies; Delta-Mendota Canal headworks; CVP; May 15-Oct. 8, 1954. (Mar. 23, 1955)
TR-1542 1955 Study of effect of air injection on vibration and pressure conditions in stilling chamber of Pump Turbine Bypass: Flatiron Power and Pumping Plant; CBTP; Jan. 27, 1955. (Feb. 21. 1955)
TR-1536 1954 Meeting of Tracy Fish Screen Advisory Council; Tracy Fish Screen Structure; CVP; Nov. 16-20, 1954. (Dec. 21, 1954)
TR-1535 1954 Geophysical field work, Monticello Dam site, Solano Project; Upper American River Basin investigations, CVP Ventura River investigations. Ventura Project, California, and seismic investigations, Palo Verde Dam. Sept. 7-Nov. 15, 1954. (Dec. 15, 1954)
TR-1531 1954 Attendance at First International Instrumentation Congress and Exposition. Sept. 11-Oct. 24, 1954; Philadelphia, Pa. (Dec. 15, 1954)
TR-1526 1954 Attendance at planning meeting Hydraulics Div. ASCE, Chicago, Ill.; Nov. 4-5, 1954. (Nov. 24, 1954)
TR-1525 1954 Tests on concrete pipe drain installation; Coachella Valley Drainage System; All-American Canal System; Oct 18-22, 1954. (Nov. 22, 1954)
TR-1519 1954 Study of vibration and pressure conditions in stilling chamber of Pump Turbine Bypass; Flatiron Power and Pumping Plant; CBTP. (Oct. 15, 1954)
TR-1515 1954 Tests on concrete pipe drain installations; Coachella Valley Drainage System; All-American Canal System; Sept. 19-24, 1954. (Oct. 4, 1954)
TR-1514 1954 Observation of hydraulic conditions at Flatiron Afterbay Dam outlet works, Flatiron Pump-Turbine Bypass, and Carter Lake outlet works; CBTP. (Sept. 10, 1954)
TR-1513 1954 Test equipment installations and assistance in the conducting of acceptance tests on Unit 2; Willow Creek Pumping Plant; CBTP; July 27-Aug. 7, 1954. (Sept. 16, 1954)
TR-1506 1954 Foreign activities; detail as hydraulic engineer; consultant to the government of the Phillipines through Foreign Operations Administration; Jan. 31 – August 2, 1954 (Sept. 8, 1954) (Report “Sediment Conditions at Ambuktao Dam and Reservoir is attached)
TR-1504 1954 Acceptance tests on Pump Turbine Unit 3 and Turbine Unit 2, Flatiron Power and Pumping Plant, CBTP, June 1-19, 1954. (July 28, 1954)
TR-1502 1954 Installation of salt-velocity brine injection apparatus for pump-turbine acceptance tests. Flatiron Power and Pumping Plant, CBTP, May 24-26, 1954 (July 28, 1954)
TR-1491 1954 Fish screen studies; Tracy Pumping Plant Intake; CVP, California; April 28-May 7, 1954. (July 9, 1954)
TR-1480 1954 Seepage test; South Platte Supply Canal; CBTP. (Apr. 20, 1954)
TR-1472 1954 Gaging station downstream from outlet works; Flatiron Afterbay; CBTP. (Mar. 10, 1954)
TR-1458 1953 Reactivation of radio-reporting rain gages and operation of the velocity meter in Walnut Grove Crosscut Channel; CVP, California (Dec. 24, 1953)
TR-1457 1953 Downpull and vibration tests on modified cylinder gate; Upstream Arizona intake tower. Hoover Dam: Boulder Canyon Project (Dec. 21, 1953)
TR-1455 1954 Tests of 12-inch ball valve in free discharge regulation at Estes Powerplant; CBTP. (Jan. 11, 1954)
TR-145 1946 Rio Grande Sediment Conference (sponsored Federal Interagency River Basin Committee) (Aug. 27, 1946)
TR-1447 1953 Attendance at annual convention of the ASCE in New York City, Oct. 13-23. 1953; and lecture tour at Worchester Polytechnic Institute, Worcester, Mass., Nov. 2-3, 1953. (Dec. 8, 1953)
TR-1444 1953 Trip to Nebraska to locate sites for stable channel observations. (Apr. 30, 1953)
TR-1443 1953 Field trip to Kendrick Project, North Platte Project; and thc Bostwick Div. MRBP; Cooperative Bureau and Colo. A&M Col. Sediment Lining Program. (Nov. 23, 1953)
TR-1416 1953 Attendance at Minnesota International Hydraulics Convention in Minneapolis, Minn.; Sept. 1-4, 1953. (Sept. 16, 1953)
TR-1414 1953 Repair and installation of flowmeter in Delta Cross Channel; California Projs. (Sept. 14, 1953)
TR-1403 1953 Seepage tests for design and estimates; Ainsworth Canal; MRBP. (July 17, 1953)
TR-1396a 1953 Trip to meeting of Missouri River Sedimentation Advisory Board of the U.S.E.D. on June 29-30, 1953. (July 6, 1553)
TR-1394 1953 Evaluation of experience gained in operation of radio-reporting rain gages during the past winter and cause of erosion in the Tracy Pumps. (June 11, 1953)
TR-1390 1953 Rating of tidal current meter; Colo. A&M Col., Fort Collins, Colo. (June 10, 1953)
TR-1382 1953 Performance tests of Poudre Supply Canal; CBTP. (May 20, 1953)
TR-1379 1953 Irrigation facilities in the vicinity of Fort Collins, Colo. (May 17, 1953)
TR-1371 1953 Travel to Knoxville, Tenn. to attend sedimentation conferences and incidental visits (Mar. 23-30, 1953)
TR-137 1946 Operational test on R-9 needle valve; Right Powerhouse; Grand Coulee Powerplant; CBP. (July 31, 1946)
TR-1362a 1953 Rehabilitation work to reduce sediment excavation necessary from irrigation canals of the Middle Rio Grande Conservancy District. (Apr. 27, 1953)
TR-1350 1953 Field trip to Fort Collins, Colo. relative to the LCCL Program. (Feb. 25, 1953)
TR-1346 1953 Model studies for the Third Powerhouse and Flood Control Modification: Grand Coulee Dam; CBP. (Mar. 5, 1953)
TR-1345 1953 Attendance at meeting of Four States Irrigation Council; Second Annual Meeting at Student Union Building; Colo. A&M Col., Fort Collins, Colo.; Jan. 14-15, 1953. (Feb. 6, 1953)
TR-1340 1953 Field performance tests; Trauger Pumping Plant; CVP. (Jan. 27, 1953)
TR-1336 1953 Operational test of modified siphon spillways and float control; Marys Lake Powerplant, CBTP. (Jan. 19, 1953)
TR-1327 1952 Seepage loss measurement in the Courtland Canal; Bostwick Div.; MRBP. (Dec. 22, 1952)
TR-1324 1952 Conference in Albuquerque with Mr. Thomas Maddock, Jr.; Middle Rio Grande Project; Oct. 14-18, 1952 (sedimentation). (Nov. 13, 1952)
TR-1320 1952 Field performance tests of Unit P-3 in the Grand Coulee Pumping Plant; CBP. (Dec. 1, 1952)
TR-1311 1952 Temporary official duty, Washington, D.C. (Nov. 7, 1952)
TR-1300 1952 Bureau of Reclamation display in the Museum of Science and Industry in Chicago. (Oct. 7, 1952)
TR-1297 1952 Attendance at Seventh National Instrument Conference and Exhibit; Cleveland, Ohio. (Oct. 8, 1952)
TR-1296 1952 New type of stilling basin; Laramie Weld lrrigation Company. Fort Collins, Colo. (Oct. 8, 1952)
TR-1292 1952 July 1952 meeting of Missouri River Sediment Advisory Board; U.S.Engineering Department. (Aug. 22.1952) .
TR-128 1946 Performance test on hydraulic governor at Green Mountain Power Plant; CBTP. (Apr. 30, 1946)
TR-1277 1952 Trip to Riverton Project. Wyoming, to assist in setting up program for collection of data on Five Mile Creek; July 20-24, 1952. (Aug. 22, 1952)
TR-1273 1952 Rating of tidal current meter. (Aug. 18, 1952)
TR-1272 1952 Seepage tests for design and estimates; Ainsworth Canal; Niobrara River Area. (Aug. 14, 1952)
TR-1263 1952 Conference at Sacramento, California of the Delta Cross Channel Technical Studies Group (July 17, 1952)
TR-126 1946 Attendance of Third Hydraulic Conference; lowa Institute of Hydraulic Research, Iowa City, Iowa. (June 22, 1946)
TR-1259 1952 Tests on Sparling open flowmeters, B-1.7 Canal, Yuma-Mesa Div.; Tests on siphon wasteway, Sta. 1546+90, Mohawk Canal; Wellton-Mohawk Div.; Gila Project (Sept. 30, 1952)
TR-1253 1952 Sediment sampling program at Cambridge Diversion Dam; Frenchman-Cambridge Div.; MRBP. (June 5, 1952)
TR-1249 1952 Attendance at Fifth Hydraulic Conference of the Iowa Institute of Hydraulic Research at the U. of Iowa. Iowa City, Iowa. (June 24, 1952)
TR-1237 1952 Spillway operation; Shadehill Dam; MRBP. (May 12, 1952)
TR-1229a 1952 Program of sediment investigations in Rio Grande Basin. (Apr. 8, 1952)
TR-1229 1952 February 1952 meeting of Missouri River Sediment Advisory Board; U.S. Engineering Department. (Mar. 19, 1952)
TR-1226 1952 New type of stilling basin; Laramie Weld Irrigation Co., Fort Collins, Colo. (May 2, 1952)
TR-1224 1952 Attendance at convention of ASCE, New Orleans. (Apr. 29, 1952).
TR-1223 1952 Review of seepage investigations at Colo. Agricultural Experiment Sta., Fort Collins, Colo. (Apr. 21, 1952)
TR-1217a 1952 Sediment problems on the Rio Grande Project (Mar. 10, 1952)
TR-1217 1952 Model studies for hydraulic turbines and energy absorbers; Flatiron Powerplant; CBTP. (Feb. 18, 1952)
TR-1191 1951 Field trip to obtain hydraulic measurements; Horsetooth Reservoir, Soldier Canyon Dam Outlet Works; CBTP. (Dec. 19, 1951)
TR-1188 1951 Inspection of sedimentation problems on Frenchman-Cambridge and Bostwick Div.; MRBP. (Dec. 10, 1951)
TR-1187 1951 Joint field trip report; Middle Rio Grande; Sept. 10-21, 1951 (Channel rectification). (Oct. 23, 1951)
TR-1182 1951 Tests on high-head model turbine at Estes Park Powerplant. (Nov. 20, 1951)
TR-1164 1951 Tests on high-head model turbine at Estes Park Powerplant. (Oct. 9, 1951)
TR-1159 1951 Field trip to North Platte Project, Torrington, Wyoming; LCCL Program. (Sept. 25, 1951)
TR-1156 1951 Visit to Sacramento, California to assist in appraisal of salinity condition related to operation of Tracy Pumping Plant prior to opening of Delta-Cross Channel; CVP. (Oct. 2, 1951)
TR-1146 1951 Trip to Tracy, California and vicinity relative to working display model of the CVP. (Sept. 13, 1951)
TR-1142 1951 Trip to Colo. A&M Col., Fort Collins, Colo.; and Buckhorn Dam (Turbulence tank. sedimentation studies). (Sept. 5, 1951)
TR-1130 1951 Seepage measurements on North Platte River area. Grand Island, Nebraska (Aug. 21, 1951)
TR-1129 1951 Field performance test of Main Unit No. 2; Granby Pumping Plant; CBTP. (Aug. 21, 1951)
TR-1128 1951 Model for hydraulic turbine; Flatiron Powerplant: CBTP. (Aug. 14, 1951)
TR-1126a 1951 Trip to advise on protection of Five Mile and Muddy Creeks; Riverton Project (Aug. 15, 1951).
TR-1125a 1951 July 1950 meeting of Missouri River Sediment Advisory Board; United States Engineering Department. (Aug. 16, 1951
TR-1109 1951 Attendance at meeting of the committee on design; Hydraulics Div.; ASCE. June 1951. (July 10, 1951)
TR-11 1940 Glendive Pumping Plant acceptance test; Buffalo Rapids Project (Dec. 5, 1940)
TR-1099 1951 Measuring devices at West Portal of Adams Tunnel: CBTP. (June 18, 1951)
TR-1098 1951 Conference at Sacramento, California to detail 1951 field measurement program for evaluation of initial Delta-Cross Channel Transfer Flows; CVP. (June 18, 1951)
TR-1096 1951 Trip to Colo. A&M; Fort Collins, Colo. (Turbulence tank sedimentation studies). (June 15, 1951)
TR-1082 1951 Rating of Pegram Flowmeter; Fort Collins. (May 21, 1951)
TR-1077 1951 Trip to Tracy, California and vicinity relative to display for forthcoming CVP celebration. (May 9, 1951)
TR-1063 1951 Trip to Sacramento and vicinity to inaugurate construction for model of the CVP. (Apr. 24, 1951)
TR-1062 1951 Field inspection to test site and plans for seepage measurements on North Poudre Supply Canal. (Apr. 16, 1951)
TR-1061 1951 Trip to Colo. A&M Col., Fort Collins, Colo.; and Horsetooth Supply Conduit Diversion Structure (Turbulence tank, sedimentation studies). (Apr. 17, 1951)
TR-1059 1951 Coordination of Corps-Bureau construction program; Folsom Unit; American River Division, CVP. (Apr. 18, 1951)
TR-1055x 1968 Operating characteristics of some of rhe hydraulic structures on the CBTP east of the continental divide (Memo report of unofficial field trip). (Apr. 3, 1968)
TR-1055 1951 Review of sediment work program; Middle Rio Grande Project, Albuquerque, New Mexico (Apr. 2, 1951)
TR-1054 1951 Spillway pressure studies; Davis Dam. (Apr. 3, 1951)
TR-1049 1951 Trip to San Luis Valley to obtain data on maximum sustained flows at canal sections investigated. (Mar. 27, 1951)
TR-1037 1951 Trip to Minneapolis to attend meeting of Federal Agency Representatives on study of sediment size analysis apparatus. (Mar. 8, 1951)
TR-1036 1951 Seepage measurements; Wyoming Canal; LCCL Program; Riverton Project (Mar. 5, 1951)
TR-1030 1951 Field measurements to determine the hydraulic performance of the river outlets through Friant Dam (Feb. 19, 1951)
TR-1027 1951 Field trip to Fort Collins, Colo., relating to Armco metergate studies. (Feb. 16, 1951)
TR-1026 1951 Stable channel study in San Luis Valley and study cf sediment problems on the Uncompahgre and Grand Valley Project (Feb. 15, 1951)
TR-1025 1951 Seepage measurements: Friant-Kern Canal; LCCL Program. (Feb. 7, 1951)
TR-1024 1951 Seismic geophysical investigations; Eklutna Project Alaska. (Feb. 14, 1951)
TR-1023 1951 Conference at Colo Agriculture Col. on seepage measurements. (Feb. 19, 1951)
TR-1022 1951 Field trip to Fort Collins regarding LCCL Program (Seepage measurements). (Feb. 8, 1951)
TR-1016 1951 Field trip to Ephrata, Wash., to repair instruments. (Jan. 30, 1951)
TR-1009 1951 Trip to Colo. A&M Coll., Fort Collins, Jan. 4, 1951, to observe operation and discuss problems of the turbulence trough apparatus. (Jan. 22, 1951)
TR-1008 1951 Trip to Colo. A&M Col., Fort Collins, Colo.; discuss procurement of materials for turbulence jar. (Jan. 19, 1951)
TR-09-11 2009 Travel to Santa Margarita River Conjunctive Project, CA [PDF]
TR-09-01 2009 Trip Report- Travel to Tracy fish Collection Facility Primary Channel Velocity Evaluation
TR-04-08 2004 Travel Report for Madrid, Spain, and Lisbon, Portugal
TR-04-07 2004 Hoover Dam and Powerplant
TR-04-06 2004 Travel to Millerton Reservoir Temperature Monitoring Program (Friant Dam)
TR-04-05 2004 Servicing the acoustic flowmeters on the Buford-Trenton Irrigation District, Trenton, North Dakota, and to evaluate several flow measurements structures on the project
TR-04-04 2004 Field Trip to install three acoustic flowmeters on the Buford-Trenton Irrigation Project, Trenton, North Dakota
TR-04-03 2004 Travel to Rock Springs, WY, Dutch John Utah, and Flaming Gorge Dam
TR-04-02 2004 Travel to Socorro, New Mexico
TR-04-01 2004 Millerton Reservoir Temperature Monitoring Program (Friant Dam)
TR-03-18 2003 Travel to Sixth Water Flow Control Structure, Utah
TR-03-17 2003 Travel to Pioneer Ditch, (Laird, CO & Haigler, NE)
TR-03-16 2003 Travel to Yuma, AZ
TR-03-15 2003 Travel to Belle Fourche Irrigation District and Angostura Irrigation District-Flow Measurement Evaluations
TR-03-14 2003 Travel to Carlsbad Irrigation District and other flow measurment sites in New Mexico
TR-03-13 2003 Travel to Eden Valley Irrigation and Drainage District, Farson, WY
TR-03-12 2003 Travel to Pioneer Ditch, (Laird, CO & Haigler, NE)
TR-03-11 2003 Penstock temperature monitoring for the Left, Right, and 3rd powerplants at Grand Coulee Dam.
TR-03-10 2003 Travel to Belle Fourche and Angostura Irrigation Districts in South Dakota
TR-03-09 2003 Vibration Tests of 42-inch tube valve at Flatiron Power Plant.
TR-03-08 2003 ADCP and hydrographic survey of the Elwah River near Port Angeles, Washington
TR-03-07 2003 Upper Gila Fluvial Geomorphology Study - Gila, AZ
TR-03-06 2003 Southern Nevada Water System ADCO Data Collection and Analysis - DATA REPORT
TR-03-05 2003 Southern Nevada Water System ADCP Data Collection and Analysis - DATA REPORT
TR-03-04 2003 Southern Nevada Water System ADCP Data Collection and Analysis
TR-03-03 2003 Travel to Pioneer Ditch (Laird, CO & Haigler, NE) - April 3, 2003
TR-03-02 2003 Data report-Southern Nevada Water System ADCP Training and Equipment Installation
TR-03-01 2003 Travel to Yuma, AZ - March 24-25, 2003
TR-02-11 2002 Travel to Yuma Az, Parker Az, and El Centro, California
TR-02-10 2002 Travel to International Workshop on Rock Scour Due to High Velocity Jets, Lausanne, Switzerland (CONTROL NUMBER 0202)
TR-02-09 2002 Collection of selective withdrawal performance data fir the Flaming Gorge Dam Seklective Withdrawal Evaluation (S&T Research Project - RE208
TR-02-08 2002 Collection of selective withdrawal performance data for the Hungry Horse Dam
TR-02-07 2002 Southeast Arizona Ecosystem Restoration/Renewable Energy Symposium
TR-02-06 2002 Travel to Coanda--Effect Screen Sites in Roaring Fork Valley, Colorado
TR-02-05 2002 Measurement of Velocities and Temperature Profiles in Folsom Lake and Lake Natoma: Measurement of Current Profiles in Sacramento River near Glenn-Colusa Irrigation District's Intake
TR-02-04 2002 ADCP and hydrographic survey of the Rougue river near Savage Rapids Dam, Grants Pass, Oregon.
TR-02-03 2002 Travel to Perris, California to evaluate flow measurement equipment at the Eastern Municipal Water District's Mills Booster Station
TR-02-02 2002 ADCP and ADV data collection near Southern Nevada Water System's Intake at Saddle Island
TR-02-01 2001 Upper Gila Fluvial Gemorphology Study
TR-01-26 2001 Travel to Yuma, Arizona and Bullhead City area
TR-01-25 2001 Travel to Yuma, Arizona
TR-01-24 2001 Travel toLisbon, Portugal
TR-01-23 2001 ADCP and ADV data collection in Lake Mead's Las Vegas Bay and Boulder
TR-01-22 2001 Travel to Stillwater, Oklahoma, to participate in ARS Embankment Dam Breach Test.
TR-01-21 2001 Collection of selective withdrawl performance data for the Hungry Horse Dam Selective Withdrawl Evaluation Study (S&T Research Project-ER922)
TR-01-20 2001 Travel to Parker, Arizona
TR-01-19 2001 ADCP and ADV data collection near Southern Nevada Water System's Intake at Saddle Island.
TR-01-18 2001 Folsom Dam 84-inch M&I Intake Velocity Measurements
TR-01-17 2001 Las Vegas Bay ADCP andADV data Collection June 18-20, 2001
TR-01-16 2001 Installation of Instrumentation for the Hungry Horse Dam Selective Withdrawl Evaluation Study (S&T Research Project-ER922)
TR-01-15 2001 Installation of the Instrumentation for the Folsom Shutters Selective Withdrawl Evaluation (S&T Research Project- ER108)
TR-01-14 2001 LAS VEGAS ADCP AND ADV DATA COLLECTION
TR-01-13 2001 LAS VEGAS ADCP AND ADV DATA COLLECTION
TR-01-12 2001 Travel to Socorro, New Mexico, to Collect Velocity Profile Data on the Rio Grande Low Flow Channel
TR-01-11 2001 Travel to Socorro,New Mexico, to Collect Velocity Profile Data on the Rio Grande Low Flow Channel
TR-01-10 2001 Travel to Kerley Valley, Ganado, and Canyon Del Muerto water supply projects.
TR-01-09 2001 Travel to Wageningen, The Netherlands
TR-01-08 2001 Field Evaluation of Primary Bypass Performance at Tracy Fish Facilites, CA
TR-01-07 2001 Upper Gila Fluvial Geomorphology Study: Gila Monster Meeting and Presentation
TR-01-06 2001 Las Vegas Bay ADCP data collection
TR-01-05 2001 Las Vegas Bay ADCP data collection, January 17 - 18, 2001
TR-01-04 2001 Las Vegas Bay ADCP data collection, December 11 - 14, 2000
TR-01-03 2001 First USBR/PWRI Workshop, January 25 - 30, 2001
TR-01-02 2000 Las Vegas Bay ADCP Data Collection, November 1 - 3, 2000
TR-01-01 2000 Site Visit to Red Bluff Research Pumping Plant (RBRPP) to conduct discharge measurements on the Wemco-Hidrostal pump
TR-00-17 2000 Collection of Acoustic Doppler Current Profiler (ADCP) Data in Las Vegas Bay, Hoover Dam Forebay, near Southern Nevada Water System's Intake at Saddle Island and Boulder Canyon (September)
TR-00-16 2000 Collection of Acoustic Doppler Current Profiler (ADCP) data in Las Vegas Bay, Hoover Dam Forebay, near Southern Nevada Water System's intake at Saddle Island and Boulder Canyon
TR-00-15 2000 Reconnaissance of the Little Colorado River, Task 2, Little Colorado Sediment Study Service Agreement
TR-00-14 2000 Hungry Horse Dam Selective Withdrawal Evaluatoin, Travel to Kalispell and Columbia Falls, MT
TR-00-13 2000 Travel to Lummi Indian Nation, Skookum Creek Fish Hatchery Intake Structure
TR-00-12 2000 Travel to Controlotron Flowmeter Installation, Big Thompson Powerplant
TR-00-11 2000 Travel to Dillon, Montana
TR-00-10 2000 Travel to Gila River Indian Community (GRIC) Sacaton, AZ
TR-00-09 2000 Travel to 5th International Symposium oon Stratified Flows
TR-00-08 2000 Travel to Tucumcari
TR-00-07 2000 Travel to Las Vegas, NM, Lake Mead and Boulder Canyon
TR-00-06 2000 Travel to Los Alamos, NM
TR-00-05 2000 Travel to Wallingford, UK, May 22-25, 2000 to visit Hydraulics Laboratory and attend the Workshop on Management of Irrigation and Drainage Research and to present a case study.
TR-00-03 2000 Travel for Las Vegas Bay Acoustic Doppler Current Profiler (ADCP) Data Collection
TR-00-02 2000 Foreign Travel for Participation in the International Workshop on Hydraulics of Stepped Spillways in Zurich, Switzerland (Control Number 034)
TR-00-01 2000 Travel to Gila River Indian community (GRIC), Sacaton, Arizona
R-HYD-10 1962 Laboratory Studies of the Pendvane Flowmeter [PDF] 12.8 MB
Research Report No. 4 1966 Hydraulic Downpull Forces on Large Gates [PDF] 4.2 MB
Research Report No. 26 1974 Reclamation Research in the Seventies - First Progress Report
Research Report No. 25 1971 Evaluation of Effect of Impoundment on Water Quality in Cheney Reservoir
Research Report No. 24 1978 Hydraulic Design of Stilling Basin for Pipe or Channel Outlets [PDF] 2.5 MB
Research Report No. 18 1969 A Study of the Effects of Waves on Evaporation from Free Water Surfaces
Research Report No. 13 1968 Removal of Saline Water From Aquifers
REC-OCE-70-55 1970 Reaeration of Streams and Reservoirs - Analysis and Bibliography [PDF] 5.1 MB
REC-OCE-70-54 1970 Investigation of a 10-inch Vertical Flowmeter, Flow Controller, and Integrator [PDF] 3.4 MB
REC-OCE-70-51 1970 Evaluation of Materials for Cavitation Resistance [PDF] 5.3 MB
REC-OCE-70-44 1970 Hydraulic Model Studies of Tiber Dam Auxiliary Outlet Works - MRBP [PDF] 4.8 MB
REC-OCE-70-42 1970 Hydraulic Model Studies of Toa Vaca Dam Spillway - Puerto Rico Wate [PDF] 10.0 MB
REC-OCE-70-38 1970 Water Measurement Procedures - Irrigation Operators Workshop [PDF] 7.5 MB
REC-OCE-70-37 1970 High Head Gate Seal Studies [PDF] 1.2 MB
REC-OCE-70-33 1970 Hydraulic Model Studies of a Turnout from Lateral WB38 Chute-Wahluk [PDF] 1.0 MB
REC-OCE-70-30 1970 Pond Lining for Desalting Plant Effluents-Field and Laboratory Evaluation [PDF] 7.6 MB
REC-OCE-70-17 1970 Hydraulic Model Studies of the Spillway Bucket Energy Dissipator,Pa [PDF] 1.1 MB
REC-OCE-70-16 1970 Hydraulic Model Studies of Interstage Module Piping in the 2.5 MGD [PDF] 0.8 MB
REC-OCE-70-12 1970 Hydraulic Model Studies of Jackson Lake Dam Baffle Blocks [PDF] 0.9 MB
REC-OCE-70-11 1970 Hydraulic Model Studies of an Energy Dissipator for a Fixed Cone Valve at the Ute Dam Outlet Works [PDF] 1.4 MB
REC-OCE-70-08 1970 Colorado River Front Work and Levee System- Hydraulic Model Studies [PDF] 11.7 MB
REC-OCE-70-03 1970 Hydraulic Model Studies of Silver Jack Dam Spillway Stilling Basin [PDF] 2.1 MB
REC-OCE-69-05 1969 Experimental Study and Analysis of Draft-tube Surging [PDF] 1.1 MB
REC-OCE-69-03 1969 Hydraulic Model Studies of Pump Intake Manifold and Evaporation Trays [PDF] 7.2 MB
REC-ERC-90-01 1990 Compilation Report on the Effects of Reservoir Releases on Downstream Ecosystems - January 1990 [PDF] 10.7 MB
REC-ERC-88-06 1988 1986 Lake Powell Survey [PDF] 11.0 MB
REC-ERC-88-03 1988 Overtopping Flow on Low Embankment Dams - Summary Report of Model [PDF] 2.7 MB
REC-ERC-88-02 1988 Hydraulic Model Studies of Twin Buttes Dam Fuse Plug Spillway [PDF] 4.0 MB
REC-ERC-88-01 1988 Emergency Spillways Using Geomembranes [PDF] 1.6 MB
REC-ERC-87-06 1987 Hydraulic Model Studies of Upper Stillwater Dam Stepped Spillway and Outlet Works - October 1987 - F-861 [PDF] 5.3 MB
REC-ERC-86-07 1986 Gravel Pack Thickness for Ground-water Wells - Report No. 1 - June 1986 F-884 [PDF] 7.0 MB
REC-ERC-85-07 1985 Hydraulic Model Studies of Fuse Plug Embankments [PDF] 2.5 MB
REC-ERC-83-11 1984 Seepage Analysis Using the Boundary Element Method [PDF] 1.8 MB
REC-ERC-83-09 1983 Discharge Algorithms for Canal Radial Gates [PDF] 18.0 MB
REC-ERC-82-14 1983 Hydraulic Model Studies on Bulb Turbine Intakes [PDF] 1.4 MB
REC-ERC-82-09 1982 Hydraulic Model Studies of Landslide-Generated Water Waves-Morrow Point Dam [PDF] 27.3 MB
REC-ERC-81-03 1981 Hydraulic Sediment Model Study for Proposed Blanco Diversion Dam Mo [PDF] 2.9 MB
REC-ERC-80-08 1980 Impinging Jets [PDF] 0.6 MB
REC-ERC-79-07 1979 Gate Stroking [PDF] 3.9 MB
REC-ERC-79-06 1979 Shaft Torsional Oscillations of Hydrogenerators [PDF] 1.9 MB
REC-ERC-79-04 1979 Winter Ice Jams on the Gunnison River [PDF] 4.5 MB
REC-ERC-79-03 1979 Electronic Filter Level Offset (EL-FLO) Plus Reset Equipment for Automatic Control of Canals [PDF] 17.0 MB
REC-ERC-79-01 1979 Development of Pump Characteristics from Field Tests [PDF] 2.9 MB
REC-ERC-78-12 1978 Studies of a Method to Prevent Draft Tube Surge and the Analysis of Wicket Gate Flow and Forces [PDF] 2.3 MB
REC-ERC-78-08 1978 Low Froude Number Stilling Basin Design [PDF] 1.2 MB
REC-ERC-78-02 1978 Hydraulic Laboratory Manning "n" and Grade Deviation Study for 4-inch-diameter, Nonperforated, Corrugated Plastic Drain Tubing [PDF] 8.1 MB
REC-ERC-77-14 1978 Hydraulic Tests and Development of Multijet Sleeve Valves [PDF] 3.4 MB
REC-ERC-77-08 1977 Atmospheric Simulation Using Stratified Liquid Models [PDF] 4.8 MB
REC-ERC-77-06 1978 Physicochemical and Biological Conditions in Two Oklahoma Reservoir
REC-ERC-77-03 1977 Frequency - Response Analysis of Automated Canal [PDF] 1.8 MB
REC-ERC-77-01 1977 Modulus of Soil Reaction (E') Values for Buried Flexible Pipe [PDF] 4.9 MB
REC-ERC-76-12 1976 Studies of the Benthic Environment of Twin Lakes, Colorado
REC-ERC-76-05 1976 Hydraulic Model Studies of Navajo Dam Auxiliary Outlet Works and Hollow-Jet Valve Bypass - Modifications to Reduce Dissolved Gas Supersaturation, April 1976 [PDF] 4.8 MB
REC-ERC-76-03 1976 Load and Voltage Control Algorithms for Grand Coulee Powerplant - March 1976
REC-ERC-76-02 1976 Hydraulic Model Vortex Study - Grand Coulee Third Powerplant [PDF] 6.8 MB
REC-ERC-75-06 1975 Hydraulic Model Studies of a Fish Screen Structure for the McClusky Canal, December 1975 [PDF] 2.2 MB
REC-ERC-75-03 1975 Hydraulic Model Studies for Backfilling Mine Cavities (Second Series) [PDF] 6.8 MB
REC-ERC-75-01 1975 Reaeration and Control of Dissolved Gases-A Progress Report [PDF] 1.6 MB
REC-ERC-74-27 1974 Hydraulic Model Studies of Canyon Ferry Dam Spillway Stilling Basin [PDF] 8.4 MB
REC-ERC-74-19 1974 Design and Operation of Shallow River Diversions in Cold Regions [PDF] 3.1 MB
REC-ERC-74-16 1974 Hydraulic Model Studies of the Teton Canal Outlet Works Energy Dissipator [PDF] 4.2 MB
REC-ERC-74-15 1974 Prevention of Frazil Ice Clogging of Water Intakes by Application of Heat [PDF] 1.5 MB
REC-ERC-74-12 1974 Hydraulic Model Studies for the Penstocks for Grand Coulee Third Po [PDF] 8.4 MB
REC-ERC-74-09 1974 Hydraulic Model Studies of Plunge Basins for Jet Flow, June 1974 [PDF] 1.8 MB
REC-ERC-74-04 1974 Research and Development of Nozzles for Spray Applications-First Progress Report [PDF] 8.0 MB
REC-ERC-74-03 1974 Hydraulic Model Studies of the Low-Level Outlet Works, LG-2 Develop [PDF] 4.1 MB
REC-ERC-74-01 1974 Hydraulics of Stratified Flow - Final Report - Selective Withdrawal [PDF] 1.7 MB
REC-ERC-73-22 1973 Hydraulic Model Studies of Crystal Dam Spillway and Outlet Works,Co [PDF] 4.7 MB
REC-ERC-73-20 1973 Mathematical Simulation of Temperatures in Deep Impoundments [PDF] 1.0 MB
REC-ERC-73-19 1973 Hydraulic Model Studies for Backfilling Mine Cavities [PDF] 4.5 MB
REC-ERC-73-15 1973 Hydraulic Model Studies of O'Sullivan Dam - Columbia Basin Project [PDF] 3.0 MB
REC-ERC-73-08 1973 Discharge and Torque Characteristics, 198-inch Butterfly Valve,Auburn Dam [PDF] 1.7 MB
REC-ERC-73-05 1973 Hydraulic Model Studies of Chute Offsets, Air Slots, and Deflectors [PDF] 3.3 MB
REC-ERC-73-03 1973 Hydraulic Model Studies of Vertical Stilling Wells [PDF] 1.8 MB
REC-ERC-73-02 1973 Hydraulic Model Studies for Grand Coulee Third Powerplant Forebay [PDF] 1.6 MB
REC-ERC-72-33 1972 Biological Effects of Artificial Destratification and Aeration in [PDF] 4.4 MB
REC-ERC-72-32 1972 Measuring Water Velocity with an Ultrasonic Flowmeter [PDF] 1.0 MB
REC-ERC-72-31 1972 Hydraulic Laboratory Studies of a 4-foot-wide Weir Box Turnout Structure [PDF] 1.6 MB
REC-ERC-72-28 1972 Control of Surging in Low-pressure Pipelines [PDF] 1.3 MB
REC-ERC-72-27 1972 Hydraulic Model Studies of Scoggins Dam Fish-trap Aeration and Supply [PDF] 0.8 MB
REC-ERC-72-24 1972 Influence of Draft Tube Shape on Surging Characteristics of Reaction Turbines [PDF] 1.5 MB
REC-ERC-72-22 1972 Hydraulic Model Studies of the Canal Structures Adjacent to Bacon [PDF] 1.2 MB
REC-ERC-72-14 1972 Laboratory Study of a Flat-Bottom Trapezoidal Venturi Flume [PDF] 0.7 MB
REC-ERC-72-05 1972 Hydraulic Model Studies of the Forebay Reservoir Inlet-Outlet Structure for Mt. Elbert Pumped-Storage Powerplant, Fryingpan-Arkansas Project, Colorado, January 1972 [PDF] 1.0 MB
REC-ERC-72-04 1972 Laboratory Tests to Study Drainage from Sloping Land [PDF] 2.8 MB
REC-ERC-72-03 1972 Study of Hydraulic Filter Level Offset (HyFLO) Equipment for Automation [PDF] 1.0 MB
REC-ERC-71-48 1971 Laboratory Investigations of Combined Vertical Flowmeter and Flow [PDF] 1.1 MB
REC-ERC-71-47 1971 Hydraulic Model Studies of Aeration Devices for Yellowtail Dam Spillway [PDF] 0.9 MB
REC-ERC-71-46 1971 Ice Control Structure on the North Platte River - A Hydraulic Study [PDF] 2.3 MB
REC-ERC-71-44 1971 Drainage from Level and Sloping Land [PDF] 1.5 MB
REC-ERC-71-42 1971 Draft Tube Surges - A Review of Present Knowledge and an Annotated Bibliography [PDF] 1.1 MB
REC-ERC-71-36 1971 Reducing Hazards to People and Animals on Reclamation Canals [PDF] 1.4 MB
REC-ERC-71-34 1971 Hydraulic Model Studies of the Reservoir Inlet-Outlet Structure for Horse Mesa Pump-Storage Unit, Salt River Project, Arizona, September 1971 [PDF] 1.2 MB
REC-ERC-71-32 1971 Selective Withdrawal Studies for the Fish Hatchery Outlet at Pueblo [PDF] 1.5 MB
REC-ERC-71-31 1971 Hydraulic Model Studies of the Intake-outlet Structure for the Pump [PDF] 0.8 MB
REC-ERC-71-29 1971 Studies to Determine the Feasibility of a Baffled Apron Drop as an Energy Dissipator - Conconully Dam Spillway [PDF] 0.5 MB
REC-ERC-71-25 1971 Pond Linings for Desalting Plant Effluents-Evaluation of Four Types [PDF] 9.0 MB
REC-ERC-71-23 1971 Documentation of Operation, Damage, Repair, and Testing of Yellowtail [PDF] 3.4 MB
REC-ERC-71-18 1971 Hydraulic Model Studies of The Pueblo Dam Spillway and Plunge Basin [PDF] 1.0 MB
REC-ERC-71-12 1971 Hydraulic Model Studies of Folsom Spillway-Outlet Junction [PDF] 1.1 MB
REC-ERC-71-10 1971 Hydraulic Model Studies of Corrugated - Metal Pipe Underdrain Energy [PDF] 1.3 MB
REC-ERC-71-08 1971 Ice Formation - A Review of the Literature and Bureau of Reclamation Experience, September 1971 [PDF] 2.0 MB
REC-ERC-71-04 1971 Hydraulic Model Studies of the Tehama-Colusa Canal Fish Concentrators [PDF] 1.1 MB
R-99-08 1999 Hydraulic Model Study of Folsom Dam Spillway Performance and Stilling Basin Abrasion [PDF] 5.1 MB
R-99-05 1999 Hydraulic Model Study of Contra Costa Canal Fish Screen Structure and Trash Rake [PDF] 4.7 MB
R-99-02 1999 Glen Canyon Dam Multi-Level Intake Structure Hydraulic Model Study [PDF] 0.7 MB
R-98-04 1998 Physical model studies of the GCID pumping plant fish screen structure : report no. 3 : 1:16 scale model investigations : alternative D [PDF] 2.6 MB
R-98-03 1998 Physical model studies of the GCID pumping plant fish screen structure : progress report no. 2 : 1:30 scale model investigations : alternative A - multiple bay "V" screens [PDF] 3.4 MB
R-97-09 1997 Use of Temperature Control Curtains to Control Reservoir Release Water Temperatures [PDF] 5.1 MB
R-97-08 1997 Physical Model Study of Enlarged Fish Ladders for Red Bluff Diversion Dam, Red Bluff Diversion Dam Fish Passage Program, September 1997 [PDF] 10.5 MB
R-97-07 1997 Hydraulic Field Evaluation of the Right Abutment Fish Ladder at Red Bluff Diversion Dam, Red Bluff Diversion Dam Fish Passage Program, September 1997 [PDF] 3.8 MB
R-97-06 1997 Grand Valley Irrigation Company Diversion Dam Fish Passage Physical Model Study, September 1997 [PDF] 2.9 MB
R-97-02 1997 Physical Model Studies of the GCID Pumping Plant Fish Screen Structure Alternatives, Progress Report No. 1, 1:30 Scale Model Investigations: Alternative D, March 1997 [PDF] 1.7 MB
R-96-09 1996 Hydraulic Model Study of Ochoco Dam Spillway Modifications and Stilling Basin Design. [PDF] 3.0 MB
R-96-05 1996 Hydraulic Model Study of the Positive Barrier Fish Screen at Reclamation District No. 108, Wilkins Slough Pumping Plant, September 1996 [PDF] 3.0 MB
R-95-15 1995 Erosional and Depositional Characteristics of Cohesive Sediments Found in Elephant Butte Reservoir, New Mexico, December 1995 [PDF] 3.5 MB
R-95-13 1995 Laboratory and Field Evaluations of Acoustic Velocity Meters at Davis and Parker Dams, September 1995 [PDF] 3.0 MB
R-95-07 1995 Prattville Intake, Lake Almanor, California, Hydraulic Model Study on Selective Withdrawal Modifications, July 1995 [PDF] 2.6 MB
R-95-03 1995 Hydraulic Model Study of the Spring Creek Debris Dam Selective Withdrawal System, February 1995 [PDF] 1.1 MB
R-95-01 1995 Hydraulic Model Study Results For Black Rock Dam, January 1995 [PDF] 11.0 MB
R-94-14 1994 Deschutes--Canal-Lining Demonstration Project Durability Report--Year 2 September 1994
R-94-12 1994 Historical Performance of Buried Water Pipe Lines, September 1994
R-94-10 1994 Hungry Horse Selective Withdrawal Hydraulic Model Study, August 1994 [PDF] 2.2 MB
R-94-06 1994 Deschutes--Canal-Lining Demonstration Project Construction Report - Upper Deschutes River Basin Water Conservation Project
R-94-05 1994 Hydraulic Model Tests: Twin Peaks Pumping Plant [PDF] 1.3 MB
R-94-04 1994 Vallecito Dam Flow Measurement and Weir Calibration - May 1994 [PDF] 1.9 MB
R-93-18 1993 Elastomeric Canal Sealants - Application to Wet Concrete - Dry-Damp-Underwater Study - December 1993
R-93-16 1993 Environmental Research in the Klamath Basin, Oregon - 1992 Annueal Report - September 1993
R-93-12 1993 Hydraulic Model Studies of a 52-inch Multiported Sleeve Valve for Sixth Water Aqueduct Flow Control Structure - July 1993 [PDF] 0.9 MB
R-93-11 1993 Hydraulic Model Study of Bartlett Dam Service and Auxiliary Spillways - May 1994 [PDF] 6.3 MB
R-93-10 1993 Hydraulic Model Study of Horseshoe Dam Fuse Plug Auxiliary Spillway [PDF] 3.7 MB
R-93-09 1993 Elastomeric Canal Sealants - Air-Water-Heat Study - May 1993
R-93-06 1993 Naches/Cowiche Diversion Dam Spillway Model Project - Fish Barrier Study - Summary of Investigations - April 1993 [PDF] 1.6 MB
R-93-04 1993 Emergency Closure of Guard Gates with Unbalanced Heads - High-Pressure Slide Gates - April 1993 [PDF] 2.0 MB
R-92-15 1992 Agricultural Water Management Research Workshop - October 1992
R-92-10 1992 Hydraulic Model Study of Taylor Draw Dam Outlet Works - March 1992 [PDF] 2.0 MB
R-92-05 1992 Trash Control Structures and Equipment: A Literature Review and Survey of Bureau of Reclamation Experience - February 1992 [PDF] 2.2 MB
R-92-04 1992 Investigation of Debris and Safety Boom Alternatives for Bureau of Reclamation Use - February 1992 [PDF] 2.2 MB
R-91-11 1990 Evaluation of Techniques for Detection of Cavitation on the Runner of a Model Hydraulic Turbine - December 1991 [PDF] 9.0 MB
R-91-09 1991 Characteristics and Problems of Dispersive Clay Soils [PDF] 1.2 MB
R-91-08 1991 Hydraulic Model Study of Ritschard Dam Spillways - October 1991 [PDF] 2.3 MB
R-91-03 1991 Morning-Glory Spillway Model - Beaver Run Dam - Pennsylvania -May 1991 [PDF] 1.5 MB
R-90-19 1990 Lower Colorado River Authority Water Box Calibrations - October 1990 [PDF] 1.0 MB
R-90-18 1990 Mapping Backwater Habitat on the Green River as Related to the Operation of Flaming Gorge Dam Using Remote Sensing and GIS - September 1990
R-90-16 1990 Laboratory Tests on the 30-inch Clamshell Gate for Grassy Lake Dam - Upper Snake River Project - August 1990 [PDF] 1.5 MB
R-90-13 1990 Hydraulic Model Studies of the Santa Rosa Turnout - Tucson Aqueduct - Central Arizona Project - August 1990 [PDF] 1.6 MB
R-90-12e 1990 Hydraulic Modeling of Boating Hazards and Sedimentation - Union Avenue Dam, Denver, Colorado [PDF] 3.1 MB
R-90-12d 1990 Momentum and Kinetic Energy Coefficient Research - Ramp Flumes [PDF] 3.1 MB
R-90-12c 1990 Guard Gate Tests at Tieton Dam [PDF] 3.1 MB
R-90-12b 1990 The Influence of Uniformity on Riprap Stability [PDF] 3.1 MB
R-90-12a 1990 Overtopping Protection for Embankment Dams [PDF] 3.1 MB
R-90-10 1990 Publication Guidelines - Research and Laboratory Services Division
R-90-08 1990 Hydraulic Model Study of the Theodore Roosevelt Dam Spillway Modifications - July 1990 [PDF] 6.9 MB
R-90-07 1990 Hydraulic Model Study of Chili Bar Dam Spillway Modifications - April 1990 [PDF] 2.9 MB
R-90-03 1990 Effects of Mountain Stream Topography on the Accuracy of Small Parshall Flumes - February 1990 [PDF] 0.9 MB
R-90-02 1990 Hydraulic Model Study of McClure Dam Existing and Proposed Stepped Spillways - February 1990 [PDF] 1.7 MB
R-90-01 1990 Hydraulic Model Studies - Aeration of the Submerged Jet-flow Gates at Seminoe Dam - February 1990 [PDF] 0.9 MB
R-89-17 1989 Model Study of Roosevelt Diversion Weir - October 1989 [PDF] 1.3 MB
R-89-12 1989 Union Avenue Dam Boatchute Study - September 1989 [PDF] 21.2 MB
R-03-03 2003 Design Guidance for Coanda-Effect Screens [PDF] 0.7 MB
R-03-02 2003 A Survey of Selective Withdrawal Systems [PDF] 3.9 MB
R-02-04 2002 Durango Pumping Plant 1:12 Scale Physical Model Study [PDF] 3.0 MB
R-02-01 2002 Hydraulic Model Study of the San Sevaine Side-Weir Diversion to Jurupa Basin [PDF] 4.3 MB
R-01-02 2001 Arrowrock Dam Mid-Level Outlet Works Rehabilitation 48-Inch Clamshell Gate Concept 1:10.67 Scale Physical Model Study [PDF] 3.9 MB
R-01-01 2001 Price-Stubb Diversion Dam Fish Passage Structure, Colorado River 1:20 Scale Physical Model Study [PDF] 4.2 MB
PAP-999 2009 Evaluation of New Models for Simulating Embankment Dam Breach [PDF]
PAP-998 2009 Studies Evaluate Cavitation Potential of Baffle Blocks within a Stilling Basin on a Novel Stepped Sillway Design [PDF]
PAP-997 2009 Stilling basin performance for stepped spillways of mild to steep slopes- Type III Basins [PDF]
PAP-996 2009 Sediment Transport Similtude for Scaled Physical Hydraulic Modeling [PDF]
PAP-995 2009 USBR Experience with Multiple-Slot-Baffled Fishways [PDF] 0.6 MB
PAP-994 2009 Practical Improvements for the Hole Erosion Test [PDF] 0.1 MB
PAP-993 2007 Flow Dynamics in a Typical Offset Joint on a High Velocity Chute Spillway [PDF]
PAP-992 2007 Field Testing of the Dynamic Stability of the Thermalito Diversion Dam Tainter-Gates [PDF]
PAP-991 2009 Durango Pumping Plant Fish Screens Field Evaluation [PDF] 0.6 MB
PAP-990 2009 Laboratory Evaluation of an OTT Acoustic Digital Current Meter and a SonTek Laboratory Acoustic Doppler Velocimeter [PDF] 0.2 MB
PAP-99 1956 Water Measurement and Control at Farm Turnouts
PAP-989 2009 Red Bluff Pumping Plant and Fish Screen Project Hydraulics: Fish Refuge Physical Modeling (1:1 Scale) [PDF] 0.3 MB
PAP-988 2009 Pumping Plant and Fish Screen Project Hydraulics: Red Bluff Pumping Plant Fish Screen Hydraulic Model Study (1:42 Scale) [PDF] 2.5 MB
PAP-987 2009 Flow Measurement with Long-Throated Flumes under Uncertain Submergence [PDF] 0.4 MB
PAP-986 2009 Cost-Effective Monitoring and Control for Irrigation Districts [PDF] 0.7 MB
PAP-985 2008 CHTR Fish Release Study: Fish Release Pipe Model Study - Hydraulic Analysis [PDF] 2.3 MB
PAP-984 2008 Trashrack Cleaning Alternatives for Parker Dam Powerplant Forebay Inlet Trashrack Structure [PDF] 0.6 MB
PAP-983 2008 Soils Erodibility Characterization: Confrontation between Two Erodimeters [PDF] 1.0 MB
PAP-982 2008 The Influence of Some Engineering Parameters on the Erosion of Soils [PDF] 0.1 MB
PAP-981 2007 Report on the Work Concerning the Comparison of the Jet-Test and Hole-Erosion Test [PDF] 1.4 MB
PAP-980 2008 El Vado Dam Middle Rio Grande Project, New Mexico, Issue Evaluation - Service Spillway - Operational Testing & Dynamic Analysis, Technical Memorandum No. EVMAA-8668460-2008-1 [PDF] 2.0 MB
PAP-98 1954 Modification of Water Measuring Station Downstream from Outlet Work
PAP-979 2008 Laboratory Studies of High Velocity Flows Over Open Offset Joints [PDF] 0.9 MB
PAP-978 2008 Development of Next-Generation Embankment Dam Breach Models [PDF] 0.2 MB
PAP-977 2008 Hole Erosion Tests for Wolf Creek Dam [PDF] 6.2 MB
PAP-976 2008 Uplift and Crack Flow Resulting from High Velocity Discharges Over Open Offset Joints - Laboratory Studies [PDF] 8.8 MB
PAP-975 2008 Results of Laboratory Physical Properties and Hole Erosion Tests, Truckee Canal Embankment Breach, Newlands Project, Nevada [PDF] 4.3 MB
PAP-974 2007 Embankment Dam Erosion and Breach Project [PDF]
PAP-973 2008 Soils Erodibility: A Comparison Between the Jet Erosion Test and the Hole Erosion Test [PDF] 0.2 MB
PAP-972 2008 The Glen Canyon Dam temperature control device: restoring downstream habitat for endangered fish recovery [PDF] 0.3 MB
PAP-971 2008 Computing the Trajectory of Free Jets [PDF] 0.3 MB
PAP-970 2007 Discussion of "Broad-Crested Weirs with Rectangular Compound Cross Sections" [PDF] 0.3 MB
PAP-97 1958 Some Experiments With Emergency Siphon Spillways
PAP-969 2007 Developing a Combined Air Concentration and Velocity Probe for Measuring in Air-Water Jets [PDF] 1.4 MB
PAP-968 2007 Measuring Air Entrainment and Flow Bulking in Skimming Flow over Steeply Sloping Stepped Chutes [PDF] 0.2 MB
PAP-967 2007 Using Bluetooth Radios to Communicate with Acoustic Instruments [PDF] 0.2 MB
PAP-966 2007 Measuring Point Velocities and Near-Bed Turbulence Parameters with an Acoustic Doppler Velocimeter in Environmental River Studies [PDF] 0.1 MB
PAP-965 2007 Comparing Apples and Oranges: Teledyne/RDI StreamPro ADCP and the OTT QLiner River Discharge Measurement System [PDF] 4.1 MB
PAP-964 2007 Software for Discharge Calibration of Canal Radial Gates [PDF] 0.1 MB
PAP-963 2007 Analysis of the Erosion Potential of Flow Overtopping Arrowrock Dam [PDF]
PAP-962 2007 Lower Pryor Creek Fish Passage Assessment Study [PDF] 1.7 MB
PAP-961 1999 Experiences using Acoustic Doppler Current Profilers (ADCP) for Physical Model Calibrations [PDF] 0.8 MB
PAP-960 1995 Managing Water Temperatures below Hydroelectric Facilities, Hydro Review, Vol. 14 No. 3, May 1995 [PDF] 2.5 MB
PAP-96 1957 The Preparation of Hydraulic Laboratory Reports
PAP-959 2002 Measuring Selective Withdrawal Characteristics using an Argonaut Acoustic Doppler Velocimeter in Folsom Lake, California [PDF] 0.7 MB
PAP-957 2006 Assessment of Behavior and Swimming Ability of Yellowstone River Sturgeon for Design of Fish Passage Devices. [PDF] 1.1 MB
PAP-956 2006 Hydraulic Investigations of the Erosion Potential of Flows Overtopping Owyhee Dam - Owyhee Project, Oregon-Idaho Pacific Northwest Region [PDF]
PAP-955 2001 Link River Dam Fishway Replacement Feasibility Study [PDF] 1.1 MB
PAP-954 2006 Link River Falls Fish Passage Investigation - Flow Velocity Simulation [PDF] 4.9 MB
PAP-953 2005 Dynamic Study of the P2 Discharge Line at Grand Coulee Pumping Plant [PDF] 2.7 MB
PAP-952 2005 Thesis: Air Entrainment and Energy Dissipation on a Stepped Block Spillway
PAP-951 2002 Hydraulic Design of Stepped Spillways
PAP-950 2005 On The Role of Stepped Overlays to Increase Spillway Capacity of Embankment Dams
PAP-95 1957 "Deflection Meter"; International Boundary and Water Commission [PDF] 2.8 MB
PAP-949 2005 Self-Aerated Flow on Corps of Engineers Spillways
PAP-948 2005 Tests of Circular Weirs (Vol. 9, No. 4, Civil Engineering for April 1939) [PDF] 0.4 MB
PAP-947p 2005 Incorporating Sharp-Crested Weirs Into Irrigation Scada Systems (poster) [PDF] 1.1 MB
PAP-947 2005 Incorporating Sharp-Crested Weirs Into Irrigation Scada Systems [PDF] 0.2 MB
PAP-946 2005 Labor-Saving Debris and Fish Screens [PDF] 0.8 MB
PAP-945 2005 Applying the Energy-Momentum Method to Radial Gate Discharge Calibration [PDF] 0.1 MB
PAP-944 2005 Refined Energy Correction for Calibration of Submerged Radial Gates [PDF] 0.2 MB
PAP-943 2005 Simplified Design of Flumes and Weirs [PDF] 0.8 MB
PAP-942 2005 Laboratory Evaluation of a Shallow-Water Acoustic Doppler Profiling Flowmeter [PDF] 1.7 MB
PAP-941 2005 Task Committee on Experimental Uncertainty and Measurement Errors in Hydraulic Engineering [PDF] 0.4 MB
PAP-940 2004 Swim-Thru Fishway Evaluation Project
PAP-94 1957 Coefficient of Discharge Curve for Palisades-type Gate
PAP-939 2004 Uncertainty of Predictions of Embankment Dam Breach Parameters [PDF] 0.4 MB
PAP-938 2004 Discussion of "Despiking Acoustic Doppler Velocimeter Data" [PDF] 0.1 MB
PAP-937 2004 Issues and Problems with Calibration of Canal Gates [PDF] 0.1 MB
PAP-936 2004 Laboratory Evaluation of a SonTek Argonaut-SW Flowmeter [PDF] 0.9 MB
PAP-935 2004 Effectiveness of high velocity inclined profile-bar fish screens measured by exclusion and survival of early life stages of fathead minnow [PDF] 0.8 MB
PAP-934 1993 Near-Prototype Testing of Wedge-Block Overtopping Protection
PAP-933 2004 Brains versus Brawn: The Changing World of Hydraulic Model Studies [PDF] 1.0 MB
PAP-932 1997 Design of stepped-block spillways
PAP-931 2004 Practical Solutions to Water Measurement Challenges in the Western United States
PAP-930 2004 Issues, Remedies, and Research Needs Related to Dam Service and/or Emergency Spillways
PAP-93 1957 Hydraulic Studies of a Vertical Shaft Intake To a Pressure Tunnel [PDF] 5.1 MB
PAP-929 2004 Physical Model Study of a Primary Bypass Intake With Louvers at the Tracy Fish Collection Facility, Tracy, California
PAP-928 2004 Roza Fish Screen Facility Velocity Measurements With and Without Porosity Boards at an Intermediate Canal Flow Rate
PAP-927 2004 Computational Flow Analysis of the Existing Hydraullic Condition of the Spillway and Ejectors at Imperial Diversion Dam
PAP-926 2004 Test Results of Intralox Traveling Screen Material
PAP-925 2002 Bull Trout Performance During Passage Over a Horizontal Flat Plate Screen [PDF] 0.3 MB
PAP-924 2004 Hydrographic Survey Data Collected at Three Proposed Pumping Plant Sites on the Williamson River near Chiloquin, Oregon [PDF] 0.2 MB
PAP-923 2004 Upper Gila River Fluvial Geomorphology Study - Final Report - Arizona [PDF] 1.9 MB
PAP-922 2004 Upper Gila River Fluvial Geomorphology Study - Geomorphic Map - Arizona [PDF] 0.3 MB
PAP-921 2004 Flow Deflectors for Preventing Stilling Basin Abrasion Damage [PDF] 1.1 MB
PAP-920 2004 Upper Gila River Fluvial Geomorphology Study - Stream Corridor Assessment - Arizona (55 MB!) [PDF] 55.0 MB
PAP-92 1957 Velocity Scour and Pressure Measurements from Three Models of the Same Structure, presented at the Seventh Congress of the International Association for Hydraulic Research, Lisbon, Portugal
PAP-919 2004 Dissolved Gas and Fishery Investigations at Ridgway Dam-Phases 1,2 and 3 Report [PDF] 1.3 MB
PAP-918 2004 Hydro Review-Preventing Abrasion Damage in Stilling Basins: Controlling the Flow
PAP-917 2004 Second Japan-U.S. Workshop on Watershed and River System Management-Summary Report
PAP-916 2003 Dog River Dam Study Hydraulic Model Study Results
PAP-915 2003 Accurate Water Delivery Using a Simplified Automated Farm Turnout
PAP-914 2003 Upper Gila River Fluvial Geomorphology Study - Geomorphic Analysis - Arizona (19 MB!) [PDF] 19.0 MB
PAP-913 2003 Outlet Works Emergency Gate Closure Air Vent Analysis Deadwood Dam, Boise Project
PAP-912 2003 Upper Gila River Fluvial Geomorphology Study - Geomorphic Analysis - Arizona
PAP-911 2003 Upper Gila River Fluvial Geomorphology Study - Geomorphic Map - Arizona [PDF] 0.3 MB
PAP-910 2003 Tongue and Yellowstone Rivers Diversion Dam Fishway Feasibility Study.
PAP-91 1956 Cavitation Characteristics of Gate Valves and Globe Valves Used as
PAP-909 1984 Hydraulic Design and Application of Labyrinth Spillways
PAP-908 2003 Swimming performance of Rio Grande Silvery Minnow [PDF] 2.9 MB
PAP-907 2003 Analysis of Little Colorado River Stability between Holbrook and Winslow Arizona
PAP-906 2003 St. Mary Diversion Dam and Canal Headworks Concept Design Study
PAP-905 2003 Hydraulic Model Study of the Grand Valley Irrigation Company Fish Screen Structure
PAP-904 2003 Laboratory Calibration of the Mag-Tube Flow Meter [PDF] 0.4 MB
PAP-903 2003 Acoustic Dopper Current Profiler Measurement Collected Near the A-Canal Larval Curtain, Klamath Area Project, Oregon [PDF] 0.7 MB
PAP-902p 2003 The Energy Correction for Calibration of Submerged Radial Gates [PDF] 0.8 MB
PAP-902 2003 The Energy Correction for Calibration of Submerged Radial Gates [PDF] 0.3 MB
PAP-901 2002 Stable Channel Analysis, New Mexico
PAP-900 2002 Catalog of Historical Changes, New Mexico
PAP-90 1957 Model Studies; Clear Creek Power Conduit Surge Tank; Trinity River
PAP-9 1951 Hydraulic Laboratory Venturi Meter Discharge Tables; August 1951
PAP-899 2002 Coleman National Fish Hatchery Barrier Weir Preliminary Concept Study Report
PAP-898 2002 Acoustic Doppler Velocity Measurements Collected Near the Southern Nevada Water System Intake, Lake Mead, Nevada-Arizona [PDF] 1.2 MB
PAP-897 2002 Impact of Reclamation's Hydraulic Laboratory on Water Development
PAP-896 2002 Acoustic Doppler Current Profile Measurements in Government Highline Canal, Collected near Grand Junction, Colorado [PDF] 2.0 MB
PAP-895 2002 Flood Frequency, Flow Duration and Trends, New Mexico
PAP-894 2002 HENDRICK SCREEN TEST
PAP-893 2002 Performance Limits of Width-Contracted Flumes [PDF] 0.3 MB
PAP-892 1986 Modelling Energy Dissipation with Hydraulic Structures: A Phenmomenon with Insignificant Scale Effects
PAP-891 2002 Hydraulic Model Study for Waddell fixed Cone Peck
PAP-890 2002 Tools for Design, Calibration, Construction and Use of Long-Throated Flumes and Broad-Crested Weirs [PDF] 1.6 MB
PAP-89 1955 Common Errors in Measurement of Irrigation Water
PAP-889 2002 Red Bluff Diversion Dam Fishway Attraction Study-Spillway Operation Test
PAP-888 2001 Upper Gila Fluvial Geomorphology Study - Background Information and Summary
PAP-887 2001 Upper Gila River Fluvial Geomorphology Study - Stable Channel Analysis - Analysis [PDF] 6.9 MB
PAP-886 2001 Pueblo Dam-Hydraulic Model Study Report for Existing and Modified Spillway Geometries
PAP-885 2001 Lower Colorado, Boulder Canyon, Hoover Dam Penstock System Evaluation of tie rods at the A-1 penstock junction, Upper Arizona Penstock
PAP-884 1998 "Classification of Canal Control Algorithms" and "Canal Control Algorithms Currently in Use" [PDF] 1.8 MB
PAP-883 2001 Model Tests for Battle Creek Bypass Tunnel/ Energy Dissipation Structure
PAP-882 2001 Model Tests for Traveling Water Screen at Lilley Pumping Plant
PAP-881 2001 Idaho Fish and Game Cylindrical Screen Tests
PAP-880 2001 Exclusion and Survival Rate of Early Life Stages of Fathead Minnows Released over Inclined Wedge-Wire Screens
PAP-88 1956 Cavitation Damage of Roughened Concrete Surfaces
PAP-879 2001 Rehabilitation of the Outlet Works at Arrowrock Dam
PAP-878 2001 CONTINUOUS FLOW METER FOR IRRIGATION USE MANUAL
PAP-877 2001 Hydraulic Performance of Coanda-Effect Screens [PDF] 0.2 MB
PAP-876 2001 The Uncertainty of Embankment Dam Breach Parameter Predictions Based on Dam Failure Studies [PDF] 0.2 MB
PAP-875 2001 Upper Gila River Fluvial Geomorphology Study - Flood Frequency and Flow Duration Analyses - Arizona
PAP-874 2001 Santa Cruz River Bank Stabilization at San Xavier Ribarian Area
PAP-873 2001 Flaming Gorge Tunnel Spillway Aerator Analysis
PAP-872 2001 FLUME OR WEIR CONTINUOUS WATER FLOW RATE RECORDER FOR IRRIGATION
PAP-871 2001 Upper Gila River Fluvial Geomorphology Study - Catalog of Historical Changes - Arizona [PDF] 9.1 MB
PAP-870 2000 Intake Diversion Dam; Yellowstone River, MT: Fish Protection and Passage Concept Study Report
PAP-87 1956 Use of Steel Jetties for Bank Protection and Channelization in Rivers, August 1965
PAP-869 2001 Potential Fish-Friendly Water Measurement Device Pre-assessment
PAP-868p 2000 Emergency Dam Break Analyses Following the Cerro Grande Fire near Los Alamos, New Mexico [PDF] 1.3 MB
PAP-868 2000 Emergency Dam Break Analyses Following the Cerro Grande Fire near Los Alamos, New Mexico [PDF] 0.1 MB
PAP-867 2000 Breach Parameters for Risk Assessment of Jamestown Dam
PAP-866 2000 Stability of a Viscous Column of Fluid Rigidly Rotating in the Absence of Gravity
PAP-865 2000 Derby Dam Concept Report for Truckee Canal Fish Screen Fishway Auxiliary Gated Flood Control Structure
PAP-864 2000 Grand Valley Diversion Dam and Government Highline Canal Fish Passage and Screening Concept Study
PAP-863 2000 Pyramid Lake Fishway Replacement Feasibility Study
PAP-862 2000 Structural Alternatives for TDG Abatement at Grand Coulee Dam [PDF] 3.8 MB
PAP-861 2000 Operation-Based Design Guildelines for Modern Irrigation Delivery Systems [PDF] 2.1 MB
PAP-860 2000 Irrigation Flow Measurement-Instrumentation Development Part II
PAP-86 1957 Structures and Methods for Measuring Irrigation Water
PAP-859 2000 Modular Fish Screen Hydraulic Model Study
PAP-858 2000 Arrowrock Dam Outlet Works Rehabilitation, 1:10.667 Scale Physical Model of 48-inch Clamshell Gates, Preliminary Results Memorandum
PAP-857 2000 Hydraulic Tests of Proposed Coanda-Effect Screens for Fulton Ditch: Phase I Test Results
PAP-856 2000 WINFLUME - Windows-Based Software for the Design of Long-Throated Measuring Flumes [PDF] 0.5 MB
PAP-855 2000 Willow Creek Feeder System, Game Range Reach Erosion Control and Bank Stabilation Plan
PAP-854 2000 Review of Past Studies and Data Related to Temperature Management Options for the Columbia River Below Grand Coulee Dam, Washington [PDF] 2.3 MB
PAP-853 2000 Skookum Creek Fish Hatchery Intake Structure Modifications
PAP-852 2000 Tracy Experimental Laboratory Facility Investigations: Leaky-Louver Development Preliminary Results
PAP-851 2000 Grand Valley Irrigation Company Fish Screens, Final Report, Value Engineering
PAP-850 1999 Fish Diversion Investigation, Nimbus Fish Hatchery, Value Analysis Workshop Report
PAP-85 1956 Boulder Creek Supply Canal Turnouts to Parshall Flume; CBTP
PAP-849 2000 Using Acoustic Doppler Velocity Measurement Techniques to Quantify Hydraulic Characteristics of Interflows in Lake Mead [PDF] 0.4 MB
PAP-848 2000 Hydraulic Characteristics of a Plunge Zone in Whiskeytown Reservoir, California [PDF] 0.5 MB
PAP-847 2000 Application of Flexible Curtains to Control Mixing and Enable Selective Withdrawal in Reservoirs [PDF] 0.3 MB
PAP-846 2000 Water Management Research in the Western United States - Case Study: Water Measurement and Water Systems Automation
PAP-845 1999 Shasta Temperature Control Device CFD Modeling Study [PDF] 3.7 MB
PAP-844 1999 Acoustic Doppler Velocity Measurements in Boulder Basin, Lake Mead
PAP-843 1999 Model-Derived guidelines for "Effective" TCD Operations for Target Temperatures below Shasta Dam and the Resulting Changes in the Coolwater Pool in Shasta Lake
PAP-842 2000 New Developments in Design and Application of Long-Throated Flumes [PDF] 0.3 MB
PAP-841 2000 Laboratory Testing and Numerical Modeling of Coanda-Effect Screens [PDF] 0.1 MB
PAP-840 2000 Analyzing ADV Data Using WinADV [PDF] 0.2 MB
PAP-84 1953 Cavitation Tests of Protective Coatings
PAP-839 2000 ADFM Measurement of Tidally-induced Flow and Stage in a Canal Headworks [PDF] 0.2 MB
PAP-838 2000 A Laboratory Evaluation of Unidata's Starflow Doppler Flowmeter and MGD Technologies' Acoustic Doppler Flow Meter [PDF] 0.4 MB
PAP-837 2000 Effects of Aeration on the Performance of an ADV
PAP-836 2000 Flow and Velocity Measurements Using Vortex Shedding and Magnetic Flow Meters, Jones Hole National Fish Hatchery.
PAP-835 2000 Design of Concrete Stepped Overlay Protection for Embankment Dams
PAP-834 1999 Low Cost Adaptable Canal Automation for Small Canals
PAP-833 1989 Model Study of Roosevelt Diversion Weir
PAP-832 2000 Part III, ICE-PREVENTION SYSTEM
PAP-831 2008 Sediment Transport Scaling for Physical Models [PDF] 6.7 MB
PAP-830 1999 Determination of Controlled-Release Capacity from Trinity Dam [PDF] 0.1 MB
PAP-83 1956 Model Studies to Determine the Downpull Characteristics of the Palisade
PAP-829 1999 Denver Water Foothills Water Treatment Plant Reservoir Outlet Study
PAP-828 1999 Sure-Flo Screen Tests
PAP-827 1948 Exclusion and Ejection of Excess Sediment From Canals, Distributaries, and Reservoirs
PAP-826 1983 Removal of Sediment Particles by Vortex Basin [PDF] 13.0 MB
PAP-825 1983 Passive Intake System for a Shallow Sand-Bed River
PAP-824 1971 Louvred Intake for Arresting Silt and Debris, International Association for Hydraulic Research
PAP-823 1934 Vortex-Tube Sandtrap Tests for 1933, United States Department of Agriculture, Bureau of Agricultural Engineering, May 1934
PAP-822 1960 Vortex Tube Sand Trap, Journal of the Irrigation and Drainage Division, Proceedings of the American Society of Civil Engineers, December 1960 [PDF] 4.8 MB
PAP-821 1932 Piezometer Investigation (Reprinted from Hydraulic Section of Transactions for May 15, 1932)
PAP-820 1951 Model and Prototype Studies of Sand Traps, Volume 77, Proceedings, American Society of Civil Engineers, Separate No. 67, May 1951
PAP-82 1956 Calibration of Flow Meter (3-inch Sparling) and Bourbon Pressure
PAP-819 1952 Discussion of Diversions From Alluvial Streams (Published in January 1951), Volume 78, Proceedings, American Society of Civil Engineers, Separate No. D-112, December 1952
PAP-818 1952 Diversions From Alluvial Streams, Volume 78, Proceedings, American Society of Civil Engineers, Separate No. 112, January 1952
PAP-817 1999 Analysis of Acoustic Doppler Current Profiler Data Collected Near Tracy Fish Facility, March 24-25, 1999, July 19, 1999
PAP-816 1999 Overview of Density Flows and Turbidity Currents, June 1999
PAP-815 1999 Results From the Model Study of the Tracy Facility Crab Screen, July 13, 1999
PAP-814 1998 Change in Emphasis For Hydraulic Research at Bureau of Reclamation, July 1998
PAP-813 1999 Analyses of Controlled-Release Capacity from Trinity Dam - Central Valley Project, Trinity River Division, California, June 22, 1999
PAP-812 1956 Morning-Glory Shaft Spillways, American Society of Civil Engineers, A Symposium, Paper No. 2802, Reprinted from Transactions, Vol. 121, 1956, p 311
PAP-811 1999 A Laboratory Evaluation of Unidata's Starflow Doppler Flowmeter and MGD Technologies Acoustic Doppler Flowmeter (ADFM), April 1999
PAP-810 1998 Preliminary Results for the Contra Costa Fish Screen Structure Model Study (Effective Length 293 ft), August 1998
PAP-81 1956 Results of Tests to Determine Merits of Constructing Baffle Piers
PAP-809 1998 Final Report on Riprap Design for Overtopped Embankments, October 1998
PAP-808 1999 1999 US-Japan Workshop on Watershed Management, Topic 2: Reservoir Operation Methods for Sustaining Water Quality and Ecosystems, Summary and Case Studies
PAP-807 1999 Pacific-Ag Systems Screen Tests, March 5, 1999
PAP-806 1999 Technical Review of Long-Throated Flume and Labyrinth Weir Hydraulics for Newtown Creek Water Pollution Control Plant Upgrade, February 1999
PAP-805 1999 An Overview of the Design Concept and Hydraulic Modeling of the Glen Canyon Dam Multi-Level Intake Structure, February 1999 [PDF] 0.4 MB
PAP-804 1999 Armoring of the Irrigation Canals in the San Luis Valley, Colorado, Ft Collins, 1999 [PDF] 5.3 MB
PAP-803 1997 Air Concentration Meter Electronics Package Manual, Hydroelectric Research and Technical Services Group, Project Notes 8450-98-01 [PDF] 4.3 MB
PAP-802 1998 Physical Model Study of Marble Bluff Dam Cui-ui Passage, August 1998
PAP-801 1999 Traveling Water Screen Tests, February 1999
PAP-800 1998 Damage Assessment for the Choke Canyon Dam Outlet Works Stilling Basin, September 1998
PAP-80 1947 Discussion, Horizontal Control, on paper "Reservoir Sedimentation
PAP-8 1952 Discussion of Paper by Mr. B. Lipscomb for Fifth Hydraulic Conference of the Iowa Institute of Hydraulic Research - May 1952
PAP-799 1998 Acoustic Doppler Current Profiler (ADCP) Measurements of Velocity Fields on Upper Klamath Lake Approaching the A-Canal Intake, October 1998 [PDF] 1.5 MB
PAP-798 1989 Design of Riprap Revetment
PAP-797 1998 Management of Reservoir Sedimentation
PAP-796 1998 Scale Modeling of WAter Storage Tanks to Improve Flow Circulation, Proceedings of the American Water Works Association, Water Quality Technology Conference, San Diego, California, November 1998
PAP-795 1998 Structural Alternatives for TDG Abatement at Grand Coulee Dam (Conceptual), October 1998
PAP-794 1998 Operational Alternatives for TDG at Grand Coulee Dam, November 1998
PAP-793 1998 Structural Alternatives for TDG Abatement at Grand Coulee Dam (Preliminary Concepts Report), February 1998
PAP-792 1998 Middle Rio Grande Conservancy District (MRGCD) Design and Estimates for Sandia Lakes Wasteway Overshot Gate, July 31, 1998
PAP-791 1998 Maximum Controlled-Release Capacity from Trinity Dam - Central Valley Project, Trinity River Division, California
PAP-790 1998 Simplified Design Guideline for Riprap Subjected to Overtopping Flow [PDF] 0.3 MB
PAP-79 1955 Note on Utilization of Bentonite for Watertightness of the Invert
PAP-789 1998 Improved Software for Design of Long-Throated Flumes [PDF] 0.4 MB
PAP-788 1998 Japanese Visit Concerning Clamshell Gate Technology
PAP-787 1991 Hydraulic Design of Flood Control Channels
PAP-786 1998 Aeration Enhancements at the Folsom Dam Outlet Works: Reducing Cavitation Damange Potential, April 1998, Prepared for Bruce Muller, Team Leader, Technical Service Center
PAP-785 1998 Analytical and Experimental Investigations of 2-D Laminar Free Jets, Dam Foundation Erosion Research Program, March 1998
PAP-784 1997 Flaming Gorge River Outet Pipe Failure Root Cause Analysis, Flaming Gorge Dam, Flaming Gorge Field Division, Colorado River Storage Project, Upper Colorado Region, August 1997
PAP-783 1998 Reclamation's Efforts to Upgrade Water Management of Existing Irrigation Systems, Reclamation's Water Management Efforts, March 1998
PAP-782 1993 Design of Labyrinth Spillways
PAP-781 1998 Water Measurement Device Design, Recommendations, Data Recording and Communications Equipment for the Nambe, Pojoaque, and San Ildefonso Pueblos and the Pojoaque Valley Irrigation District (PVID), January 1998
PAP-780 1997 City of Fort Collins Water and Wastewater Utilities 15 MG Reservoirs Baffle Study, October 1997
PAP-78 1956 Clausen-Pierce Weir Rule [PDF] 0.6 MB
PAP-779 1997 Denver Water Marston Water Treatment Plant Basin 3 Baffle Study, October 1997
PAP-778 1997 Inflow Velocity Fields Measured in Whiskeytown Reservoir Using an Acoustic Doppler Current Profiler, 1997
PAP-777 1994 Recommendations for Bioengineering Stabilization of Five Sites on Harland Creek, Mississippi
PAP-776 1998 Muddy Creek Demonstration Stream Restoration Research Project
PAP-775 1997 Measurement Accuracy for Major Surface-Water Flows Entering and Leaving the Imperial Valley, Draft WCL Report #23
PAP-774 1991 Grand Coulee Powerplant Signature Data for Units G22, G23, G24, August 1991
PAP-773 1997 Durango Pumping Plant Model Studies, Fiscal Year 1996
PAP-772 1997 Tongue River Fish Protection Concept Design Study, T&Y Diversion and Mobley's Diversion, June 1997
PAP-771 1997 Hydraulic Model Study of Buckhorn RCC Replacement Dam (H&S Project No. 3820)
PAP-770 1997 Model Tests of Air Burst and Hydraulic Back-Flush Cleaning Efficiency for a Cook Cylindrical Screen, August 1997
PAP-77 1956 Model Tests to Determine the Hydraulic Downpull Forces on the Fixed
PAP-769 1997 Non-Salmonid Fish Passage for Small Diversion Dams, August 1997
PAP-768 1997 New Riprap Design Criteria to Prevent Embankment Dam Failure During Overtopping
PAP-767 1997 Muddy Creek Demonstation Stream Restoration Research Project
PAP-766 1997 Dam Foundation Erosion, Phase III - Clear Water Experiments, 1:3 Scale Model Facility, Plunge Pool Circulation at Dam Foundations, June 1997
PAP-765 1997 Prediction Cavitation in Tunnel Spillways [PDF] 0.2 MB
PAP-764 1997 Folsom Dam - Selective Withdrawal Analysis for a Proposed Temperature Control Device for the Municipal Water Supply Intake, May 1997
PAP-763 1997 GCID Model Study Progress Report, Screen Model and Fish Bypass Model, April 1997
PAP-762 1986 Algorithms for Automatic Control of Diversion Dams, Presented at the ASCE Water Forum '86, "World Water Issues in Evolution," August 4-6, 1986, Long Beach, California
PAP-761 1997 Muddy Creek Demonstration Stream Restoration Research Project, Progress Report, Winter 1996-1997
PAP-760 1997 Pre-Temperature Control Device Selective Withdrawal Evaluation for Shasta Lake for the Years 1995 and 1996
PAP-76 1956 Hydrostatic Tests and Back-Seating Under Pressure Tests of Small
PAP-759 1997 Comparison of ACER TM-11 and MacDonald & Langridge-Monopolis Procedures for Estimating Embankment Breach Parameters and Peak Breach Outflow
PAP-758 1996 Denver Water Treated Water Storage Reservoir Hydraulic Model Mixing Study
PAP-757 1997 Folsom Dam Spillway Vortices Computational Fluid Dynamic Model Study
PAP-756 1997 Selective Withdrawal at Hungry Horse Dam, Montana
PAP-755 1995 Draft Groundwater Resource Management Research Needs, July 1995
PAP-754 1996 Hydraulic Field Evaluation of the Right Abutment Fish Ladder at Red Bluff Diversion Dam, Red Bluff Diversion Dam Fish Passage Program
PAP-753 1996 Muddy Creek Demonstration Stream Restoration Research Project.
PAP-752 1997 Hydraulic Model Study of Pilar Dam
PAP-751 1997 Papers to be Presented at the 27th International Association for Hydraulic Research Congress, San Francisco, California, August 10-15, 1997
PAP-750 1996 Areas of Investigation for Positive Barrier Fish Screen Applications, Fish Screen Research Program, FY96 Research Summary, October 1996
PAP-75 1956 Research Needs in Sediment Hydraulics
PAP-749 1992 Modification of the Stilling Basin at Arthur R. Bowman Dam, Oregon, to Reduce Dissolved Gas Supersaturation, Included in Proceedings of the Hydraulic Engineering Sessions at Water Forum '92 [PDF] 0.4 MB