Bureau of Reclamation Banner

Cle Elum - Upstream Passage Model - 3/19/13

Case Descriptions Table (PDF)

      Flow Direction
Prototype Case (C)   Number  Total Discharge (cfs) Outlet Works (cfs) Fish Tower (cfs) Downstream Interim Flume (cfs)

Aux. + Fish Ladder

a=180 cfs

Aux.+ Fish Ladder

b=135 cfs

Aux. + Fish Ladder        

c=90 cfs

Aux. + Fish Ladder

d=45 cfs

1 220 220 0 0 Downstream        Downstream   
2 220 100 125 0 Downstream    Downstream    Downstream    Upstream
3 500 300 200 0 Downstream    Upstream Upstream Upstream
4 220 100 0 120 Downstream      Downstream    Upstream
5 500 100 300 100 downstream    Upstream Upstream Upstream
6 3500 3094 300 100 Upstream      
7 3500 3194 300 0 Upstream      
8 200 200 0 0 Downstream        Downstream   
9 700 400 300 0 Upstream      
10 600 300 300 0 Downstream  Upstream Upstream  
11 300 300 0 0 Downstream    Downstream  Downstream 
12 400 400 0 0 Upstream      
13 300 0 300 0 Downstream  Downstream  Upstream Upstream
14 400 0 400 0 Upstream      
15 300 150 150 0 Downstream       
16 400 200 200 0 Downstream       
17 400 100 300 0 Downstream       
18 500 250 250 0 Downstream       
19 500 200 300 0 Downstream       
20 600 200 400 0 Upstream      
21 700 300 400 0 Upstream      
22 400 300 0 100 Downstream       
23 500 400 0 100 Upstream      
24 700 300 300 100 Downstream       
25 800 400 300 100 Upstream      
26 400 0 300 100 Downstream       
27 500 0 400 100 Upstream      

 

Videos (WMV format)

Photos (click on each photo to enlarge)

IMG_1076 Photo of Q300 R2235.58
IMG_1080 Photo Q300 R2238.97
IMG_1082 Photo
IMG_1084 Photo
IMG_1085 Photo
IMG_1089 Photo
IMG_1093 Photo

Return to Leslie Hanna's home page

Last updated: 03/27/13