Bureau of Reclamation Banner
Upper Colorado Region
Salt Lake City, Utah
Media Contact:
Kim Greenwood
(505) 462-3557

Released On: May 18, 2004

Informational Meeting On San Acacia River Miles 114 and 113 Priority Sites Project
Reclamation invites the media to attend an informational meeting for the public on its proposal to address two priority sites along the Rio Grande where the river flow is nearing the levee.

Reclamation will briefly present five options and provide details on the preferred option. The preferred option would be a unique project constructed on federal land, and it would entail moving the levee and Low Flow Conveyance Channel to the west of their present locations. This option would allow the river more room to migrate in the floodplain and potentially provide improved habitat for the endangered Rio Grande silvery minnow while providing flood protection for private property and citizens.

The meeting will be held on Friday, May 21, 2004, at 1:30 p.m. in the Socorrro Field Division offices located at: 2401 State Rd. #1, Socorro, New Mexico. For directions, please call Beverly at: (505) 835-1202.

# # #
Reclamation is the largest wholesale water supplier and the second largest producer of hydroelectric power in the United States, with operations and facilities in the 17 Western States. Its facilities also provide substantial flood control, recreation, and fish and wildlife benefits. Visit our website at www.usbr.gov.