Billings, Mont.
(970) 962-4326
Released On: May 04, 2012
The investigations are part of the surveying research Reclamation is conducting for its preparation of an Environmental Impact Statement. This environmental document will evaluate three proposed federal actions: the proposed Arkansas Valley Conduit; an interconnection between the north and south outlets works of Pueblo Reservoir; and a possible long-term excess capacity Master Contract with Southeastern Colorado Water Conservancy District to store water in Pueblo Reservoir.
Drilling for geotechnical surveying is performed by Reclamation's Great Plains Regional Geology and Exploration crew. The crew operates a truck mounted CME-85 rig for drilling up to 120 feet below the ground surface to collect samples of rock and earth. The samples are then tested for standard physical properties that will help determine design requirements for the Arkansas Valley Conduit.
While most of the 1600 parcels to be surveyed are in public right-of-ways, some may be on private land. In those cases, Reclamation will contact property owners and provide them with an explanatory letter and a Right of Entry form.
To learn more about the proposed Arkansas Valley Conduit, proposed Master Contract, and the related environmental review process, please visit: www.usbr.gov/avceis. Media is invited to contact Kara Lamb, Reclamation Public Information Officer, for follow-up questions at (970) 062-4326 or klamb@usbr.gov.
Privacy Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ | Notices DOI | Recreation.gov | USA.gov Stay in touch with Reclamation: Facebook | Twitter | YouTube | Flickr | Tumblr | Instagram | RSS | Multimedia |

