Billings, Mont.
(970) 962-4326
Released On: March 02, 2012
Reclamation has identified five possible pipeline routes from Pueblo to Lamar that will be surveyed. The survey crews will use large white panels shaped like giant plus signs in conjunction with aerial photography to map the potential routes.
The panels are constructed flat on the ground and the locations are calculated using global positioning equipment. Once placed, they need to remain on the ground for up to three weeks. The panels are used with aerial photography from an airplane flying at 5000 feet to obtain topographic information. The topographical data will be used to design the water pipeline.
During the survey process, some private land may need to be accessed by Reclamation surveyors. In those cases, most property owners will be contacted in person by Reclamation staff.
To learn more about the proposed Arkansas Valley Conduit, proposed Master Contract, and the related NEPA process, please visit: www.usbr.gov/avceis. Media is invited to contact Kara Lamb at (970) 062-4326 or klamb@usbr.gov.
Privacy Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ | Notices DOI | Recreation.gov | USA.gov Stay in touch with Reclamation: Facebook | Twitter | YouTube | Flickr | Tumblr | Instagram | RSS | Multimedia |

