Boulder City, Nev.
702-293-8421
702-293-8373
Released On: December 17, 2010
The drawdown is scheduled to begin early Wednesday morning, December 29, 2010. The one-foot drop should be completed by 11:00 a.m. MST, but if unfavorable conditions are encountered, the drawdown time could be extended.
During the drawdown, Lake Moovalya will be maintained at approximately elevation 363.40 feet; it is normally at elevation 364.40 feet.
The lake's projected refill date is Tuesday, January 18, 2011; however, a return to normal elevation may occur sooner or later than this expected date.
The temporary drawdown is expected to have only minimal impacts on releases from Parker Dam and will not affect flows below Headgate Rock Dam.
All river users should remember that fluctuating or lower than normal river flows may expose or create natural hazards such as moving sandbars, gravel bars, unstable riverbanks, floating or submerged debris, or other unfamiliar obstacles. As always, caution should be exercised while using the river.
Privacy Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ | Notices DOI | Recreation.gov | USA.gov Stay in touch with Reclamation: Facebook | Twitter | YouTube | Flickr | Tumblr | Instagram | RSS | Multimedia |

