Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Westlands Water District Coalinga Canal Turnout Project at Milepost 11.58
Site:
Summary:
The Proposed Action would approve the removal and replacement of a pressure tank and 18-inch pipe located within the existing operations and maintenance road at Milepost 11.58, plus installing several minor refurbishments.

Status:
11/13/2012:
The FONSI was signed on November 5, 2012.

06/18/2012:
Draft FONSI and EA available for public review on June 18, 2012. Comments due by July 2, 2012.

Contacts:
Ben Lawrence
Phone: 559-487-5039
Fax:

Chuck Siek
Phone: (559) 487-5138
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension FONSI/EA - Westlands Water District Coalinga Canal Turnout Project at Milepost 11.58 .pdf 2,032.17KB 
File with .pdf extension Draft FONSI, Westlands Water District Coalinga Canal Turnout Project at Milepost 11.58 .pdf 75.84KB 
File with .pdf extension Draft EA, Westlands Water District Coalinga Canal Turnout Project at Milepost 11.58 .pdf 564.61KB