Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Reclamation District 108 South Steiner Pumps and Pipeline Project EA
Site:
Summary:
Reclamation would help fund Reclamation District 108's (District) proposal to abandon in place the South Steiner Pumping Plant (SSPP) on the Sacramento River after constructing a 2,830 foot pipeline and related facilities to redirect irrigation water pumped from the Wilkins Slough Pumping Plant and Fish Screen Facility (also on the Sacramento River) to fields previously served by the SSPP. The proposed action includes two primary components: 1) installation of pump sumps; and 2) construction of a dual 21-inch, 2,830 foot-long PVC pipeline.

Status:
09/30/2011:
Draft FONSI and EA available for review September 30, 2011. Comments due by October 28, 2011. Final FONSI signed October 31, 2011.

Contacts:
Shelly Hatleberg
Phone: (916) 978 5050
Fax: (916) 978-5290

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Final FONSI Reclamation District 108 South Steiner Pumps and Pipeline Project .pdf 281.20KB 
File with .pdf extension Final EA Reclamation District 108 South Steiner Pumps and Pipeline Project .pdf 5,837.61KB 
File with .pdf extension Reclamation District 108 South Steiner Pumps and Pipeline Project FONSI .pdf 39.32KB 
File with .pdf extension Reclamation District 108 South Steiner Pumps and Pipeline Project EA .pdf 2,039.45KB