Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
South San Joaquin Irrigation District Division 9 Irrigation Enhancement Project
Site:
Summary:
The Bureau of Reclamation (Reclamation) has prepared a Draft Environmental Assessment (EA) to evaluate and disclose any potential environmental impacts associated with implementation of the South San Joaquin Irrigation District's (SSJID) Division 9 Irrigation Enhancement Project. Reclamation proposes to disburse Water SMART grant funds to SSJID to support construction of the proposed project. The location of the proposed project and service area is Division 9 of the existing SSJID irrigation system, which encompasses approximately 3,800 acres west of the City of Ripon in an unincorporated area of southern San Joaquin County in California. The new pressurized irrigation system would consist of 12.6 miles of underground, pressurized PVC pipeline, along with two storage basins with a total capacity of approximately 80 acre-feet (AF). Each basin would be equipped with a pump station and a groundwater well to provide an alternative water supply in dry years.

Status:
08/23/2011:
Available June 15, 2011. Comments due June 29, 2011. FONSI signed and Final EA completed June 30, 2011

Contacts:
Brad Hubbard
Phone: (916) 978-5204
Fax: (916) 978-5290

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension South San Joaquin Irrigation District signed FONSI .pdf 4,364.31KB 
File with .pdf extension South San Joaquin Irrigation District Final EA .pdf 3,530.48KB 
File with .pdf extension Draft FONSI, South San Joaquin Irrigation District Irrigation Enhancement Project .pdf 110.56KB 
File with .pdf extension Draft EA, South San Joaquin Irrigation District Irrigation Enhancement Project .pdf 2,480.27KB