Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
1. San Joaquin River Restoration Program (SJRRP) Water Year 2010 Interim Flows Project Environmental Assessment/ Initial Study ***************************** 2. SJRRP Water Year 2011 Interim Flows Project Supplemental Environmental Assessment ***************************** 3. SJRRP Water Year 2012 Interim Flows Project Supplemental Environmental Assessment
Site:
Summary:
1. Water Year 2010 EA: Reclamation temporarily changed Friant Dam operations in Water Year (WY) 2010 to release Interim Flows from Friant Dam into the San Joaquin River and potentially downstream to the Sacramento-San Joaquin River Delta (Delta), as specified in the Stipulation of Settlement in NRDC et al. v. Kirk Rodgers et al., and as part of the SJRRP. Interim Flows would be constrained by existing channel capacity, anticipated seepage, future agreements with downstream agencies, entities, and landowners, and the capacity of diversions, as well as water supply demand at the possible diversion locations. The purpose of the WY 2010 Interim Flows Project is to implement provisions of the Settlement related to Interim Flows and to collect relevant data to guide future releases of Interim Flows and Restoration Flows under the SJRRP.*********************** 2. Water Year 2011 EA: This Supplemental EA described and analyzed the effects of an additional year of Interim Flows for WY 2011. The Supplemental EA includes a review of the WY 2010 Final EA/IS, synthesizes discussions/results where conditions have not changed, and evaluates potential impacts due to implementation of WY 2011 Interim Flows in consideration of changed conditions or new data/information that have occurred.************************** 3. Water Year 2012 EA: The purpose of this Supplemental EA is to proceed with the continuation of activities necessary to convey the flows in the San Joaquin River from Friant Dam to the Delta, and to continue data collection and monitoring activities during Interim Flow releases consistent with the provisions and conditions described in the WY 2010 Interim Flows Final EA/IS and the Supplemental WY 2011 Interim Flows Final EA.

Status:
09/30/2011:
Draft Supplemental EA for 2012 available for review June 14, 2011. Comments due 5:00 p.m. on July 21, 2011. FONSI signed and Final EA available on September 30, 2011.

09/22/2010:
Draft Supplemental EA for 2011 available for review June 11, 2010. Comments due date extended to July 23, 2010. FONSI signed and Final 2011 Supplemental EA completed on September 21, 2010.

06/24/2010:
Draft 2010 EA/IS available for review on June 3, 2009. The comment period ended July 20, 2009. Final 2010 EA/IS and signed FONSI available September 25, 2009.

Contacts:
Michelle Banonis
Phone: 916 978-5457
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI, 2012 Interim Flows Project .pdf 109.29KB 
File with .pdf extension Final Supplemental EA, 2012 Interim Flows Project .pdf 950.55KB 
File with .pdf extension Final Supplemental EA, Appendices A-G; 2012 Interim Flows Project .pdf 3,643.81KB 
File with .pdf extension Final Supplemental EA, Appendices H-J; 2012 Interim Flows Project .pdf 2,494.46KB 
File with .pdf extension Final Supplemental EA, Appendix K, Part 1: BCID thru RP; 2012 Interim Flows Project .pdf 4,518.94KB 
File with .pdf extension Final Supplemental EA, Appendix K, Part 2: RMC; 2012 Interim Flows Project .pdf 5,279.33KB 
File with .pdf extension Final Supplemental EA, Appendix K, Part 3: RMC thru SLDMWA ; 2012 Interim Flows Project .pdf 1,819.97KB 
File with .pdf extension Final Supplemental EA, Appendix K, Part 4: SLDMWA attachments; 2012 Interim Flows Project .pdf 4,377.93KB 
File with .pdf extension Final Supplemental EA, Appendix K, Part 5: SLDMWA thru WSID; 2012 Interim Flows Project .pdf 627.71KB 
File with .pdf extension Draft FONSI, Supplemental EA 2012 Interim Flows Project .pdf 80.38KB 
File with .pdf extension Draft Supplemental EA, 2012 Interim Flows Project .pdf 932.72KB 
File with .pdf extension Draft Supplemental EA - Appendix A_G. 2012 Interim Flows Project .pdf 5,582.06KB 
File with .pdf extension Draft Supplemental EA - Appendix H_I. 2012 Interim Flows Project .pdf 2,138.95KB 
File with .pdf extension FONSI, Supplemental EA 2011 Interim Flows Project .pdf 622.03KB 
File with .pdf extension Final Supplemental EA, Part 1, 2011 Interim Flows Project .pdf 4,079.36KB 
File with .pdf extension Final Supplemental EA, Part 2, 2011 Interim Flows Project .pdf 5,480.07KB 
File with .pdf extension Final Supplemental EA, Part 3, 2011 Interim Flows Project .pdf 2,085.87KB 
File with .pdf extension Final Supplemental EA; Attachment A-1, Part 1; 2011 Interim Flows Project .pdf 3,259.45KB 
File with .pdf extension Final Supplemental EA; Attachment A-1, Part 2; 2011 Interim Flows Project .pdf 4,469.47KB 
File with .PDF extension Final Supplemental EA; Attachment A-2; 2011 Interim Flows Project .pdf 314.98KB 
File with .pdf extension Final Supplemental EA; Appendix A, Part 1; 2011 Interim Flows Project .pdf 2,358.60KB 
File with .pdf extension Final Supplemental EA; Appendix A, Part 2A; 2011 Interim Flows Project .pdf 3,259.37KB 
File with .pdf extension Final Supplemental EA; Appendix A, Part 2B; 2011 Interim Flows Project .pdf 4,363.66KB 
File with .pdf extension Final Supplemental EA; Appendix B; 2011 Interim Flows Project .pdf 1,201.94KB 
File with .pdf extension Draft Supplemental FONNSI 2011 Interim Flows Project .pdf 186.81KB 
File with .pdf extension Draft Supplemental EA 2011 Interim Flows Project .pdf 715.92KB 
File with .pdf extension Draft Supplemental EA - Appendix A. Part 1; 2011 Interim Flows Project .pdf 4,018.42KB 
File with .pdf extension Draft Supplemental EA - Appendix A. Part 2; 2011 Interim Flows Project .pdf 4,384.55KB 
File with .pdf extension Draft Supplemental EA - Appendix B; 2011 Interim Flows Project .pdf 458.48KB 
File with .pdf extension Draft Supplemental EA - Appendix C; 2011 Interim Flows Project .pdf 1,662.24KB 
File with .pdf extension Draft Supplemental EA - Appendix D; 2011 Interim Flows Project .pdf 1,346.29KB 
File with .pdf extension Draft Supplemental EA - Appendix E; 2011 Interim Flows Project .pdf 1,601.91KB 
File with .pdf extension Draft Supplemental EA - Appendix F. Part 1; 2011 Interim Flows Project .pdf 3,963.79KB 
File with .pdf extension Draft Supplemental EA - Appendix F. Part 2; 2011 Interim Flows Project .pdf 4,550.25KB 
File with .pdf extension Draft Supplemental EA - Appendix G; 2011 Interim Flows Project .pdf 106.69KB 
File with .pdf extension Signed FONSI, 2010 Interim Flows Project .pdf 367.75KB 
File with .pdf extension Final EA/IS - Chapters 1-3; 2010 Interim Flows Project .pdf 6,444.49KB 
File with .pdf extension Final EA/IS - Chapters 4-8; 2010 Interim Flows Project .pdf 2,499.50KB 
File with .pdf extension Final EA/IS - Appendix A,Settlement, Part 1; 2010 Interim Flows Project .pdf 5,335.31KB 
File with .pdf extension Final EA/IS - Appendix A,Settlement, Part 2; 2010 Interim Flows Project .pdf 2,521.76KB 
File with .pdf extension Final EA/IS - Appendices B-C; 2010 Interim Flows Project .pdf 6,531.89KB 
File with .pdf extension Final EA/IS - Appendix D; 2010 Interim Flows Project .pdf 1,868.53KB 
File with .pdf extension Final EA/IS - Appendix E; 2010 Interim Flows Project .pdf 102.18KB 
File with .pdf extension Final EA/IS - Appendix F; 2010 Interim Flows Project .pdf 63.53KB 
File with .pdf extension Final EA/IS - Appendix G,Chap. 1-7, Att.1; 2010 Interim Flows Project .pdf 5,047.18KB 
File with .pdf extension Final EA/IS - Appendix G, Att.2; 2010 Interim Flows Project .pdf 6,874.13KB 
File with .pdf extension Final EA/IS - Appendix G, Att.3; 2010 Interim Flows Project .pdf 3,479.91KB 
File with .pdf extension Final EA/IS - Appendix G, Att.4-5; 2010 Interim Flows Project .pdf 384.14KB 
File with .pdf extension Final EA/IS - Appendix G, Att.6, Part 1; 2010 Interim Flows Project .pdf 3,417.06KB 
File with .pdf extension Final EA/IS - Appendix G, Att.6, Part 2; 2010 Interim Flows Project .pdf 5,370.99KB 
File with .pdf extension Final EA/IS - Appendix H; 2010 Interim Flows Project .pdf 790.43KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 1-2; 2010 Interim Flows Project .pdf 6,848.83KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 3, Part 1; 2010 Interim Flows Project .pdf 6,126.24KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 3, Part 2; 2010 Interim Flows Project .pdf 5,270.35KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 3, Part 3; 2010 Interim Flows Project .pdf 6,443.49KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 4, Part 1; 2010 Interim Flows Project .pdf 6,778.67KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 4, Part 2; 2010 Interim Flows Project .pdf 6,159.27KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 4, Part 3; 2010 Interim Flows Project .pdf 6,366.73KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 5, Part 1; 2010 Interim Flows Project .pdf 4,784.46KB 
File with .pdf extension Final EA/IS - Appendix I, Chap. 5, Part 2; 2010 Interim Flows Project .pdf 5,362.45KB 
File with .pdf extension Final EA/IS - Appendix J, Att. 1-4; 2010 Interim Flows Project .pdf 6,546.15KB 
File with .pdf extension Draft EA/IS - Draft FONSI, Chap. 1 - 2; 2010 Interim Flows Project .pdf 4,526.55KB 
File with .pdf extension Draft EA/IS - Chap. 3-8; 2010 Interim Flows Project .pdf 3,312.30KB 
File with .pdf extension Draft EA/IS - Appendix A main body; 2010 Interim Flows Project .pdf 4,928.24KB 
File with .pdf extension Draft EA/IS - Appendix A exhibits; 2010 Interim Flows Project .pdf 2,943.18KB 
File with .pdf extension Draft EA/IS - Appendix B; 2010 Interim Flows Project .pdf 142.76KB 
File with .pdf extension Draft EA/IS - Appendix C; 2010 Interim Flows Project .pdf 6,051.45KB 
File with .pdf extension Draft EA/IS - Appendix D; 2010 Interim Flows Project .pdf 1,465.94KB 
File with .pdf extension Draft EA/IS - Appendix E; 2010 Interim Flows Project .pdf 100.04KB 
File with .pdf extension Draft EA/IS - Appendix F; 2010 Interim Flows Project .pdf 67.29KB 
File with .pdf extension Draft EA/IS - Appendix G; 2010 Interim Flows Project .pdf 4,563.03KB 
File with .pdf extension Draft EA/IS - Appendix H; 2010 Interim Flows Project .pdf 349.04KB