Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Installation and Rehabilitation of Stream Gages on the San Joaquin River Environmental Assessment
Site:
Summary:
Reclamation will rehabilitate and retrofit the existing stream gage stations at the bifurcation structure and below Sack Dam on the San Joaquin River, and to install two new monitoring stations at the top of Reach 4B and one at the confluence of the Merced and San Joaquin Rivers.

Status:
02/18/2009:
FONSI signed on January 29, 2009. Draft EA available for review October 31, 2008.

Contacts:
Laura Myers
Phone: 559-487-5179
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI and Final EA, Stream Gages on San Joaquin .pdf 1,331.61KB 
File with .pdf extension Draft EA/FONSI, Stream Gages on San Joaquin .pdf 4,848.62KB