Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Fresno Irrigation District’s Installation of a Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal for Transfer and/or Exchange
Site:
Summary:
Reclamation proposes to do the following: (1) enter into an exchange agreement with Fresno Irrigation Distric for the return of previously banked Unreleased Restoration Flows, (2) enter into Warren Act contracts and/or exchange agreements for the introduction and conveyance of the District’s available water supply into and through Friant Division facilities, and (3) issue a land use authorization to the District for the installation, operation, and maintenance of temporary pumping facilities within its right-of-way at or near the Gould Canal.

Status:
03/25/2014:
Draft FONSI and EA available for review on March 11, 2014. Comments due March 19, 2014. FONSI signed on March 21, 2014.

Contacts:
Becky Victorine
Phone: (916) 978-4624
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI,Fresno Irrigation District Installation of Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal .pdf 703.49KB 
File with .pdf extension Final EA, Fresno Irrigation District Installation of Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal .pdf 980.91KB 
File with .pdf extension Draft FONSI, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 483.02KB 
File with .pdf extension Draft EA, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 2,366.59KB 
File with .pdf extension Draft EA, Attachment A, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 1,366.40KB 
File with .pdf extension Draft EA, Attachment B, Fresno Irrigation District Installation of Temporary Pumping Facility for introduction of Kings River Water into Friant-Kern Canal at Gould Canal for Transfer and/or Exchange .pdf 167.19KB