Delta Diablo Sanitation District Recycled Water System Expansion Project
Site:
Summary:
Reclamation proposes to partially fund the Delta Diablo Sanitation District's Recycled Water System Expansion Project. The Proposed Project includes both a near-term component, expected to be operational in 2015, and a long-term project for buildout of the recycled water system. The near-term project would serve 15 new users and would include the following components: 6,600 linear feet (LF) of new recycled water pipeline; 0.9-MG storage tank adjacent to Los Medanos Energy Center (including land purchase) or at the Recycled Water Facility; tank flow control valve, tank pad, and other tank-related appurtenances; testing and rehabilitation of 3,090 LF of two existing and parallel 8-inch pipelines; 15 new customer meters; and isolation valves.

Status:
07/03/2013:
Initial Study/Draft Environmental Assessment available for public review on August 30, 2013. Comments are due October 2, 2013.

Contacts:
Doug  Kleinsmith
Phone: (916) 978-5034
Fax: (916) 978-5055

David White
Phone: 916-978-5074
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Draft FONSI, Delta Diablo Sanitation District Recycled Water System Expansion Project .pdf 92.88KB 
File with .pdf extension Draft IS/EA, Part 1, Delta Diablo Sanitation District Recycled Water System Expansion Project .pdf 5,697.59KB 
File with .pdf extension Draft IS/EA, Part 2, Delta Diablo Sanitation District Recycled Water System Expansion Project .pdf 4,827.02KB