Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows
Site:
Summary:
Reclamation proposes to implement the provisions of the Settlement pertaining to the Water Management Goal for Water Years (WY) 2013-2017 Interim Flows and Restoration Flows (SJRRP Flows) March 1, 2013, through February 28, 2018. The need for the action is to reduce or avoid water supply impacts to Friant Contractors by providing mechanisms to ensure that recirculation, recapture, reuse, exchange, or transfer of SJRRP Flows occurs.

Status:
04/01/2013:
Draft EA and FONSI available for review on March 4, 2013. Comments period has been extended until 5 p.m. on March 22, 2013. FONSI signed and final EA completed on April 1, 2013.

Contacts:
Michelle Banonis
Phone: 916 978-5457
Fax:

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI, Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows .pdf 112.67KB 
File with .pdf extension Final EA, Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows .pdf 5,102.74KB 
File with .pdf extension Draft EA, Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows .pdf 3,266.72KB 
File with .pdf extension Draft FONSI, Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows .pdf 49.51KB