Firebaugh Canal Water District 2nd Canal Lining Project
Site:
Summary:
Reclamation is providing a Bay-Delta Restoration Program: Agricultural Water Conservation and Efficiency Grant to the Firebaugh Canal Water District (FCWD) for the concrete lining of 2.2 miles of their 2nd Lift Canal to reduce seepage. In addition, FCWD will demolish an existing booster pump and install a new check structure to incorporate into the District’s current SCADA system to improve water management. The Proposed Action is located west of the community of Firebaugh, which encompasses approximately 22,000 acres on the Westside of the San Joaquin Valley in Fresno, California. The 2nd Lift Canal lining would begin at Douglas Avenue and continue to the 2nd Lift Canal booster pump.

Status:
09/24/2012:
The FONSI was signed September 20, 2012.

08/30/2012:
The EA and FONSI was available for public review from September 5, 2012 through September 19, 2012.

Contacts:
Shelly Hatleberg
Phone: (916) 978 5050
Fax: (916) 978-5290

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Firebaugh CWD 2nd Lift Canal Project - Signed FONSI .pdf 708.17KB 
File with .pdf extension Firebaugh Canal Water District 2nd Lift Canal Project - FONSI .pdf 116.10KB 
File with .pdf extension Firebaugh Canal Water District 2nd Lift Canal Project - Environmental Assessment .pdf 3,460.83KB