Bureau of Reclamation Mid-Pacific Region : NEPA
Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities
Title:
Delta Cross Channel Temporary Closure Multi-Year Study
Site:
Summary:
Reclamation is proposing to close the Delta Cross Channel (DCC) gates for up to 10 days during the first half of October over the next five years (2012 through 2016). The purpose of the proposed action is to evaluate the effects of short term modifications to DCC gate operations on reduction of Mokelumne River fall-run Chinook salmon straying. Reclamation would evaluate in-season water quality modeling to ensure compliance with water quality standards and minimization of potential impacts to water supply to determine the duration of the closure.

Status:
10/19/2012:
Draft FONSI and EA available for review on August 8, 2012. Comments due August 23, 2012. FONSI signed on September 28, 2012.

Contacts:
Louis  Moore
Phone: (916) 978-5106
Fax: (916) 978-5114

List of Available Reports
 
Report Title
File Ext
File Size
File with .pdf extension Signed FONSI, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 87.83KB 
File with .pdf extension Final EA, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 472.03KB 
File with .pdf extension Final EA, Appendix A, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 94.78KB 
File with .pdf extension Final EA, Appendix B, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 313.74KB 
File with .pdf extension Draft FONSI, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 52.12KB 
File with .pdf extension Draft EA, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 387.63KB 
File with .pdf extension Draft EA, Appendix B, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 46.99KB 
File with .pdf extension Draft EA, Endangered Species List, Delta Cross Channel Temporary Closure Multi-Year Study .pdf 74.86KB