Click for More Information 1. Gray Lodge Wildlife Area 2014-15 Agreement for the Reimbursement of Deep Well Pumping Costs********* 2. Gray Lodge Wildlife Area 2012-2014 Agreement for the Reimbursement of Deep Well Pumping Costs on the between the United States and the State of California ******************************************************** 3. Gray Lodge Wildlife Area 2009 Agreement for the Reimbursement of Deep Well Pumping Costs on the between the United States and the State of California EA 1. Reclamation will amend the performance period for reimbursement of pumping costs at Gray Lodge Wi... Final EA completed and FONSI signed May 20, 2009.
Click for More Information 1. San Joaquin River Restoration Program (SJRRP) Water Year 2010 Interim Flows Project Environmental Assessment/ Initial Study ***************************** 2. SJRRP Water Year 2011 Interim Flows Project Supplemental Environmental Assessment ***************************** 3. SJRRP Water Year 2012 Interim Flows Project Supplemental Environmental Assessment 1. Water Year 2010 EA: Reclamation temporarily changed Friant Dam operations in Water Year (WY) 2010... FONSI signed and Final EA available on September 30, 2011.
Click for More Information 2011 CVPIA Gravel Replenishment Program Stanislaus River at River Mile 58 Reclamation proposes to add up to 5,500 cubic yards of gravel to the Lower Stanislaus River at Rive... Finding of No New Significant Impact signed August 12, 2011.
Click for More Information 2013 Water Transfers EA/FONSI Reclamation proposes to approve water transfers in 2013 that require Reclamation's approval, which i... FONSI signed and final EA completed on June 21, 2013.
Click for More Information 2013-2014 Acquisition of 9,000 Acre-Feet of Water from Merced Irrigation District and Conveyance Agreement with Patterson Irrigation District Reclamation proposes to acquire up to 9,000 acre-feet of water from the Merced Irrigation District (... Comments are due December 6, 2013.
Click for More Information Acquisition of Up to 7,363 Acre-Feet of Water from Merced Irrigation District for the East Bear Creek Unit of the San Luis National Wildlife Refuge (2012) Reclamation proposes to enter into a temporary water service contract with the Merced Irrigation Dis... FONSI signed and EA completed on October 29, 2012.
Click for More Information Agreement for the Reimbursement of Pumping Costs between the United States and the State of California for Refuge Water Supplies at Wildlife Areas Reclamation proposes entering into the “Agreement for the Reimbursement of Pumping Costs for Refuge ... Comments due August 1, 2014.
Click for More Information American River Spawning Gravel EA; 2010 supplemental EA; 2011 supplemental EA; 2014 supplemental EA Reclamation will add spawning gravel to the lower American River at seven sites from Nimbus Dam to U... FONSI signed on August 1, 2014.
Click for More Information Anderson Cottonwood Irrigation District IRWMP Groundwater Production Element Project EA Reclamation proposes to provide financial assistance to the Anderson-Cottonwood Irrigation District ... FONSI signed November 01, 2011.
Click for More Information ARRA New Wells Project - Region 1 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 2 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 3 EA Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed July 13, 2010.
Click for More Information ARRA New Wells Project - Region 4 Under Title IV of the American Recovery and Reinvestment Act (ARRA) for drought relief, the Bureau o... FONSI signed on August 3, 2010.
Click for More Information ARRA-funded Water Recycling (Title 16) Projects FONSIs This site shows the FONSIs for water recycling projects funded by the American Recovery and Reinvest... All of these were completed by June 2010.
Click for More Information Arroyo Canal Fish Screen and Sack Dam 6 Fish Passage Project EA/IS Reclamation in cooperation with the Henry Miller Reclamation District #2131 (HMRD), proposes to repl... FONSI signed on September 4, 2013.
Click for More Information Buena Vista Water Storage District Water Use and Irrigation Efficiency Project Buena Vista Water Storage District (BVWSD) applied for a WaterSMART grant when Reclamation announced... The FONSI was signed on December 12, 2012.
Click for More Information Butte Water District Canal Automation Project, Draft EA/FONSI Under the Sacramento Valley Integrated Regional Water Management Plan (SVIWRMP) Grants Program, Recl... FONSI signed and final EA completed on August 18, 2011.
Click for More Information Categorical Exclusion Checklists for Calendar Year 2012 Attached are complete Categorical Exclusion Checklists (CECs) for 2012 for our Regional Office in Sa...
Click for More Information Cawelo Water District Calloway Canal Lining Project Reclamation will provide a CALFED Bay-Delta Program grant to the Cawelo Water District to line the C... FONSI signed.
Click for More Information Cawelo Water District Calloway Canal Lining Project Reach B Reclamation proposes to award CWD with a $500,000 CALFED Water Use Efficiency Grant to assist in fun... FONSI signed and final EA completed on July 28, 2014.
Click for More Information Central California Irrigation District East Ditch and Poso Canal Reservoirs Project Reclamation proposes to award Central California Irrigation District (CCID) with a grant to fund a p...
Click for More Information Central Dublin Recycled Water Distribution and Retrofit Project EA Reclamation proposes to provide Federal funds to the share the cost with the Dublin San Ramon Servic... FONSI signed and Final EA completed on May 11, 2012.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects for Fiscal Year 2013 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... There were two EAs and two CECs for projects funded in fiscal year 2013.
Click for More Information Central Valley Project Conservation Program/Habitat Restoration Program Projects from FY 2011 through FY 2012 (EAs and CECs) The primary goal of the Central Valley Project Conservation Program (CVPCP) is to enhance, protect, ... Previous years' projects have their own sites.
Click for More Information Colusa Indian Community Council Compton Diversion Fish Screen Project Reclamation proposes to provide cost-share funding to Colusa Indian Community Council (CICC) through... Comments due September 11, 2014.
Click for More Information Contracts between the United States and Conaway Preservation Group, LLC and, the United States and the Woodland-Davis Clean Water Agency Reclamation proposes to execute an amendatory Sacramento River Settlement Contract between the Unite... FONSI signed and final EA completed October 2, 2013.
Click for More Information Delta Cross Channel Temporary Closure Multi-Year Study Reclamation is proposing to close the Delta Cross Channel (DCC) gates for up to 10 days during the f... FONSI signed on September 28, 2012.
Click for More Information Delta Diablo Sanitation District Recycled Water System Expansion Project Reclamation proposes to partially fund the Delta Diablo Sanitation District's Recycled Water System ... Waiting for completion of cultural resources studies and consultation
Click for More Information Execution of Warren Act Contracts for Storage and Conveyance of Non-CVP Water from Placer County Water Agency to Westlands Water District Reclamation proposes to enter into a one-year Warren Act contract, for storage and conveyance of up ... FONSI signed on May 30, 2013.
Click for More Information Feather Water District North and South Diversions Fish Screen Project Reclamation proposes to provide cost-share funding to SSWD through the Anadromous Fish Screen Progra... Comments due April 30, 2014.
Click for More Information Firebaugh Canal Water District (FCWD) 1st Canal WaterSMART Grant Project EA Reclamation would provide grant funding for the concrete lining of 2.6 miles of canal to reduce seep... FONSI signed and EA completed on September 29, 2011.
Click for More Information Firebaugh Canal Water District 1st Lift Canal Lining Project - Phase II and Check 2 Modernization Project Reclamation is providing grant funding to Firebaugh Canal Water District (FCWD) through the Bay-Delt... FONSI signed and EA completed on October 31, 2013
Click for More Information Firebaugh Canal Water District 2nd Canal Lining Project Reclamation is providing a Bay-Delta Restoration Program: Agricultural Water Conservation and Effici... The EA and FONSI was available for public review from September 5, 2012 through September 19, 2012.
Click for More Information Franks Tract Project EIR/EIS The Franks Tract Project is designed to address water quality and fish protection issues in the cent... The Draft Feasibility Report (FR)/EIS/EIR is due April 2013.
Click for More Information Fresno Irrigation District’s Installation of a Temporary Pumping Facility for the introduction of Kings River Water into the Friant-Kern Canal at the Gould Canal for Transfer and/or Exchange Reclamation proposes to do the following: (1) enter into an exchange agreement with Fresno Irrigatio... FONSI signed on March 21, 2014.
Click for More Information Friant-Kern Canal Capacity Restoration Draft EA/FONSI Bureau of Reclamation proposes to restore the capacity of the Friant-Kern Canal (FKC) from the curre... Waiting to complete cultural resources and endangered species compliance.
Click for More Information Golden Gate Salmon Association Project B.11 – Sacramento River Stranding Reclamation wants to stabilize releases from Keswick Dam during October to reduce salmon spawning an... Comments are due September 27, 2013.
Click for More Information Grassland Incremental Level 4 Groundwater Acquisition Pilot Project - Water Years 2008-2010 Environmental Assessment Under the proposed action, Reclamation would purchase up to approximately 10,000 acre-feet of water ... FONSI signed/final EA prepared on August 15, 2008.
Click for More Information Grassland Incremental Level 4 Groundwater Acquisition Pilot Project - Water Years 2012-2013 Environmental Assessment Under the proposed action, Reclamation would purchase up to approximately 10,000 acre-feet of water ... Supplemental FONSI signed on June 19, 2012.
Click for More Information Henry Miller Reclamation District No. 2131 Island Canal System Modernization Project Reclamation is providing grant funding to Henry Miller Reclamation District No. 2131 (HMRD) through ... FONSI signed and EA completed on January 14, 2014.
Click for More Information Interim San Joaquin Salmon Conservation and Research Facility Operations and Maintenance Funding Reclamation proposes to fund operations and maintenance of the Interim San Joaquin Salmon Conservati... FONSI signed and final EA completed on September 25, 2013.
Click for More Information Ivanhoe Irrigation District WaterSMART Grant Reclamation proposes to provide WaterSMART program grant funds to the Ivanhoe Irrigation District (D... The FONSI was signed on November 29, 2012.
Click for More Information Joint Operations Center Relocation Project EIS/EIR The Bureau of Reclamation (Reclamation) and the California Department of Water Resources propose to ... These investigation efforts have delayed the publication of the final EIS/EIR.
Click for More Information Kaweah Delta Water Conservation District Packwood Creek Control Structures and Oakes Basin Improvements Project Reclamation proposes to provide grant funds Kaweah Delta Water Conservation District to support the ... FONSI signed and final EA completed on August 8, 2014.
Click for More Information Kaweah Delta Water Conservation District Paregien Basin Project Reclamation proposes to provide WaterSMART program grant funds to the Kaweah Delta Water Conservatio... FONSI signed on August 20, 2013.
Click for More Information Kern National Wildlife Refuge, Annual Acquisition and Conveyance of up to 20,000 Acre-Feet of Water to Meet FWS Level 4 Water Supply Needs. The proposed action is for Reclamation to enter into annual agreements with Kern-Tulare Water Distri... FONSI signed and Final EA completed September 7, 2007.
Click for More Information Long-Term Environmental Water Account EIS/EIR The Environmental Water Account (EWA) was established in the CALFED Programmatic EIS/EIR. The purpo... Project is now inactive.
Click for More Information Long-Term Water Transfers Reclamation proposes to implement a long-term water transfer program to facilitate voluntary water t... Draft EIS/EIR expected to be available for public review in September 2014.
Click for More Information Los Vaqueros Expansion Project EIS/EIR The objectives of the Los Vaqueros Reservoir Expansion Project are to develop water supplies for env... Record of Decision signed March 11, 2011.
Click for More Information Madera Irrigation District Water Conservation, Telemetry Upgrade & Improvement Project Reclamation is providing grant funding through the WaterSMART Program: Water and Energy Efficiency g... FONSI signed and EA completed on March 17, 2014.
Click for More Information Mendota Dam Sluice Gates Replacement Project Central California Irrigation District (CCID) would replace all 6 of the existing Calco rectangular ... FONSI signed and final EA available on December 30, 2011.
Click for More Information Mendota Pool Bypass and Reach 2B Channel Improvements Project EIS/EIR The Proposed Action is a component of the San Joaquin River Settlement (October 2006) and is located... See attached notice of intent.
Click for More Information Merced Irrigation District Arena Canal and Howard Lateral Water Conservation Project Reclamation is providing a CALFED Water Use Efficiency Grant to the Merced Irrigation District (MID)... FONSI signed on October 16, 2012.
Click for More Information Meridian Farms Water Company IRWMP Groundwater Production Element Project EA Under the Sacramento Valley Integrated Regional Water Management Program (SVIWRMP) Grants Program, R... FONSI signed and Final EA completed on January 10, 2012.
Click for More Information Natomas Mutual Water Company & Anadromous Fish Screen Program Pritchard Lake Pumping Plant Fish Screen Project The Proposed Action will screen Natomas Mutual Water Company's (NMWC’s) existing 150 cubic feet per ... Comments are due by February 14, 2014.
Click for More Information New Melones Lake Area Storage Facility Reclamation proposes to construct a new storage facility at the New Melones Lake area to provide sec... The FONSI was signed on June 21, 2013.
Click for More Information North Bay Water Recycling Program (formerly North San Pablo Bay Restoration and Reuse Project) EIR/EIS The Sonoma County Water Agency (SCWA) has worked with Congressman Thompson to introduce H.R. 1326, w... Reclamation signed the Record of Decision on January 28, 2011.
Click for More Information North Bay Water Recycling Program - Sonoma Valley County Sanitation District Recycled Water Project Supplemental EA/Addendum The Sonoma Valley County Sanitation District proposes to slightly revise its portion of Phase 1, the... EA completed and FONSI signed on December 20, 2011.
Click for More Information North of the Delta Offstream Storage (NODOS) Feasibility Study and EIS/EIR The purpose of North-of-the-Delta Offstream Storage Feasibility Study is to investigate a range of s... Initial Alternatives Information Report – May 2006. Plan Formulation Report – May 2009. Draft EIS/EIR and Feasibility Report due in 2013. Final EIS/EIR and Feasibility Report due in 2016. Record of Decision – To be determined.
Click for More Information Patterson Irrigation District Two-Drains Project Reclamation proposes to provide a $1,500,000 grant to Patterson Irrigation District to help fund con... Comments due by July 18, 2014.
Click for More Information Pelger Mutual Water Company Groundwater Production Element Project and Sutter Mutual Water Company groundwater Monitoring Project Integrated Regional Water Management Program EA Reclamation proposes to provide a grant to the Pelger Mutural Water Company PMWC) and the Sutter Mut... FONSI signed on January 23, 2012.
Click for More Information Pixley Irrigation District Gravity Conveyance and Conservation Project Reclamation proposes to award Pixley Irrigation District (PID) with a WaterSMART grant to help fund ... The FONSI was signed on 9/26/13.
Click for More Information RD 2035 Joint Intake and Fish Screen Project EA/IS Reclamation proposes to provide cost-share funding to RD 2035 through its Anadromous Fish Screen Pro... The FONSI was signed on 11/19/2013
Click for More Information Reach 4B, Eastside Bypass and Mariposa Bypass Low Flow Channel and Structural Improvements Project The Bureau of Reclamation and the California Department of Water Resources are proposing to prepare ... NOI published September 9, 2009.
Click for More Information Recirculation of Recaptured Water Year 2010 San Joaquin River Restoration Program Interim Flows EA Reclamation is entering into various 12 consecutive month transfer and exchange agreements to recirc... Updated FONSI signed and Addendum to the final EA completed on February 4, 2011.
Click for More Information Recirculation of Recaptured Water Year 2012 San Joaquin River Restoration Program Interim Flows Environmental Assessment Reclamation estimates the recirculation of approximately 20,000 to 80,000 acre-feet (AF), based on 9... FONSI signed and final EA completed on April 3, 2012.
Click for More Information Recirculation of Recaptured Water Year 2013-2017 San Joaquin River Restoration Program Flows Reclamation proposes to implement the provisions of the Settlement pertaining to the Water Managemen... FONSI signed and final EA completed on April 1, 2013.
Click for More Information Reclamation District 108 South Steiner Pumps and Pipeline Project EA Reclamation would help fund Reclamation District 108's (District) proposal to abandon in place the S... Final FONSI signed October 31, 2011.
Click for More Information San Joaquin River Flow Modification Project EA/IS Reclamation proposes to provide two years of continued implementation of State Water Resources Contr... FONSI signed on February 7, 2012.
Click for More Information San Joaquin River Invasive Vegetation Monitoring and Management EA Reclamation proposes to monitor and manage invasive vegetation with potential to compromise successf... FONSI signed on October 11, 2012.
Click for More Information San Joaquin River Restoration Program Categorical Exclusion Checklists 2014 onwards Attached are completed Categorical Exclusion Checklists (CECs) for the San Joaquin River Restoration...
Click for More Information San Joaquin River Restoration Program Juvenile Fall-Run Chinook Salmon Trap and Haul Study Reclamation proposes to implement a trap and haul study to support the NRDC, et al., v. Kirk Rodgers... FONSI signed and EA completed on February 20, 2014.
Click for More Information San Joaquin River Restoration Program Programmatic EIS/EIR Reclamation and the California Department of Water Resources have prepared a PEIS/EIR for the San Jo... ************************************************************* Final PEISR available on July 31, 2012. Record of Decision signed September 28, 2012.
Click for More Information San Luis Reservoir Low Point EIS/EIR The Santa Clara Valley Water District has proposed the San Luis Reservoir Low Point Improvement Proj... The Final Plan Formulation Report (PFR) was completed January 2010. The Draft Environmental Impact Statement/Environmental Impact Report Feasibility Report is tentatively due September 2013.
Click for More Information Shasta Lake Water Resources Investigation EIS Reclamation is conducting a feasibility study including preparation of a decision document and envir... NOI published 10/7/05. Environmental scoping meetings were completed (in October/November 2005) for public input on scope, alternatives, and issues to be addressed in the draft EIS. ******************************************** The Draft EIS for the Shasta Lake Water Resources Investigation is now available for public review with comments due by midnight on September 30, 2013.
Click for More Information Short-term Sacramento Valley Water Management Program EIS/EIR. The Short-term phase of the SVWM Program resolves water quality and water rights issues arising from... Public scoping meetings held August 20/21 2003. Draft and Final EIS/EIR dates to be determined.
Click for More Information Site 902 Acquisition, Suisun Marsh Bureau of Reclamation proposes to provide funding to the State of California Department of Water Res...
Click for More Information Smith River Rancheria Water Resources Development Project The Bureau of Reclamation will provide funding to the Smith River Rancheria (SRR) to install and dev... Signed FONSI and Final EA available April 24th, 2010
Click for More Information South Bay Recycling Program - Phase 1C Projects The City of San Jose (City) has planned and implemented the San José Nonpotable Reclamation Project,... FONSI's and associated addendums, and memorandums to file that are available through May 2012.
Click for More Information South Bay Water Recycling Program San Jose Hedding Extension EA Reclamation, pursuant to funding provided through Title XVI of Public Law 102-575, will provide up t... FONSI signed and EA completed on January 25, 2011.
Click for More Information South Delta Improvements Program EIS/EIR The SDIP is a joint California Department of Water Resources (DWR) and Reclamation project that cont... Draft EIS/EIR released November 10, 2005. Draft EIS/EIR hearings in December 2005. Final EIS/EIR Stage 1 Decision released December 15, 2006. Biological Opinion due date to be determined.
Click for More Information South San Joaquin Irrigation District Division 9 Irrigation Enhancement Project The Bureau of Reclamation (Reclamation) has prepared a Draft Environmental Assessment (EA) to evalua... FONSI signed and Final EA completed June 30, 2011
Click for More Information South Sutter Water District Fish Screen Project Reclamation proposes to provide cost-share funding to South Sutter Water District (SSWD) through the... Comments due September 2, 2014.
Click for More Information Suisun Marsh Habitat Management, Preservation, and Restoration Plan EIS/EIR Develop a regional plan for Suisun Marsh that balances implementation of the CALFED Program, the Sui... Two public meetings held on November 18, 2010 to receive written comments regarding environmental effects. Final EIS/EIR available on December 6, 2011. Record of Decision signed on April 21, 2014.
Click for More Information Temporary Acquisition of Up to 2,000 Acre-Feet of Water from Merced Irrigation District for the East Bear Creek Unit of the San Luis National Wildlife Refuge EA Reclamation proposes to acquire from 500 to 2000 acre-feet of water from the Merced Irrigation Distr... ****** 2011 Acquisition: Finding of No New Significant Impact signed on November 21, 2011.
Click for More Information Temporary One-Year Transfer and Exchange of Recaptured San Joaquin River Restoration Program Flows from Madera Irrigation District and Chowchilla Water District to Red Top The purpose of the Proposed Action is to implement the provisions of the San Joaquin River Settlemen... FONSI signed and final EA completed on April 2, 2013.
Click for More Information Tulare Irrigation District Canal Modernization Project The Tulare Irrigation District Canal Modernization Project is being partially funded through Reclama... The FONSI was signed on May 23, 2013.
Click for More Information Upper San Joaquin River Basin Storage Investigation Geotechnical Field Exploration at River Mile 274 The purpose of the geological field exploration is to collect feasibility-level data for the Upper ... EA/FONSI available August 1, 2014
Click for More Information Upper San Joaquin River Basin Storage Project EIS/EIR The purpose of the study is to evaluate proposed actions to increase the storage of water from the S... FONSI signed/final EA completed on July 11, 2006. Draft EIS/EIR due spring 2014.
Click for More Information Upper Truckee River and Marsh Restoration Project EIR/EIS/EIS The Tahoe Regional Planning Agency, California Tahoe Conservancy and Reclamation are proposing a joi... Comments are due by April 29, 2013.
Click for More Information Upper Truckee River Restoration and Golf Course Relocation Project EIS/EIR The Tahoe Regional Planning Agency, the California Department of Parks and Recreation, and Reclamati... Final EIR/EIS available on October 7, 2011.
Click for More Information Upper Truckee River Restoration Project Middle Reaches 3 and 4 EA/IS/IEC The City of South Lake Tahoe with grant funding from the California Tahoe Conservancy and Reclamatio... Final EA/IS/IEC completed April 4, 2008. FONSI signed July 3, 2008.
Click for More Information Warren Act Contract for Storage and Conveyance of Non-CVP Water from Placer County Water Agency to Westlands Water District in 2014 Reclamation proposes to enter into a one-year Warren Act contract with Westlands Water District (WWD... FONSI signed on July 17, 2014.
Click for More Information Water Transfer Program for the San Joaquin River Exchange Contractors Water Authority, 2014-2038 EIS/EIR Reclamation would execute agreements for water transfers with Reclamation, Central Valley Project (... Record of Decision signed on July 30, 2013.
Click for More Information Water Transfers for the San Luis & Delta-Mendota Water Authority in 2014 The San Luis & Delta-Mendota Water Authority (SLDMWA) and its Participating Members will experience ... FONSI signed on April 22, 2014.
Click for More Information Water Transfers for the Tehama-Colusa Canal Authority in 2014 The Tehama-Colusa Canal Authority (TCCA) and its Member Units will experience severe water shortages... FONSI signed April 22, 2014.
Click for More Information Yountville Recycled Water Project EA/MND The Town of Yountville (Town) is proposing to meet its National Pollutant Discharge Elimination Syst... FONSI signed and final EA completed on April 18, 2013.
Click for More Information Yuba City Feather River Fish Screen Environmental Assessment/Initial Study Reclamation is funding a portion of the Yuba City Fish Screen Project through its Anadromous Fish Sc... FONSI signed and Final EA completed April 27, 2012.