Central California Area
 
Project
Summary
Status
Click for More Information 1. Folsom Dam Safety and Flood Damage Reduction EIS/EIR************************************************** 2. Folsom Dam Safety and Flood Damage Reduction Supplemental Environmental assessment/Initial Study 1. Reclamation seeks to improve public safety downstream of Folsom Dam by modifying the dam and its ... FONSI signed on April 14, 2008 and Final EA available April 15, 2008
Click for More Information 2011 Interim American River Division Water Service Contract Renewals for Placer County Water Agency and the City of Roseville EA Reclamation proposes to execute interim renewal contracts for Placer County Water Agency and for t... FONSI signed December 30, 2010.
Click for More Information 2013 Interim American River Division Water Service Contract Renewals for Sacramento Municipal Utility District and Sacramento County Water Agency Draft EA Reclamation proposes to execute two 26-month interim renewal contracts for Sacramento Municipal Util... FONSI signed on December 28, 2012.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for Sacramento Municipal Utility District The Bureau of Reclamation proposes to enter into a 24-month (second) Interim Renewal Contract with S... Comments on draft EA/FONSI due by COB on December 3, 2014.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for the City of Roseville The Bureau of Reclamation proposes to enter into a 24-month (third) Interim Renewal Contract with th... Comments on draft EA/FONSI due by COB on December 3, 2014.
Click for More Information 2015 American River Division Interim Water Service Contract Renewal for the Sacramento County Water Agency Bureau of Reclamation proposes to enter into a 24-month (second) Interim Renewal Contract with Sacra... Comments on draft EA due by COB on December 3, 2014.
Click for More Information American River Hatchery – New Hatchery Building Reclamation proposes to approve the construction by California Department of Fish and Game of a new ... FONSI signed and final EA completed on October 1, 2012
Click for More Information Award of WaterSMART Grant for Tracy Lake Groundwater Recharge Project North San Joaquin Water Conservation District Reclamation proposes to provide funding, under a WaterSMART grant, to the North San Joaquin Water Co... FONSI signed and Final EA completed on June 9, 2014.
Click for More Information Camp Berryessa EA Reclamation would issue a lease to Napa County Regional Park and Open Space District to construct an... FONSI signed March 15, 2011.
Click for More Information City of Roseville and Placer County Water Agency Interim Renewal Water Service Contracts 2013 Reclamation proposes to approve two separate 24-month interim renewal water service contracts with t... Signed FONSI and EA available to the public on March 4, 2013.
Click for More Information City of Roseville Warren Act Contract EA/IS Purpose is to convey up to 30,000 acre-feet of non-CVP Placer County Water Agency (PCWA) water to th... Final EA/IS completed and FONSI signed on September 7, 2006.
Click for More Information East Bay Municipal Utility District WaterSMART Grant - Water and Energy Efficiency Lawn Conversion Rebate Program EA The Bureau of Reclamation has awarded a WaterSMART Grant to East Bay Mud Municipal Utility District ... FONSI signed and EA completed on February 1, 2012.
Click for More Information El Dorado County Water Agency Proposed Water Service Contract EIS/EIR The proposed project consists of a water supply contract for the El Dorado County Water Agency under... Comment period extended to December 31, 2009.
Click for More Information El Dorado Irrigation District Warren Act Contract Environmental Assessment - Project 184 The Bureau of Reclamation proposes to enter into a long-term (40-year) Warren Act contract with the ... NMFS is continuing to assess whether this long-term water supply has been adequately covered in previous consultations; conversations have been ongoing since the OCAP Biological Opinions were remanded.
Click for More Information El Dorado Irrigation District's Pump Station Temperature Control Device Environmental Assessment Reclamation and EID plan to install a TCD on EID's existing water supply intake in Folsom Reservoir ... There have been other regional solutions presented that may serve to fulfill this structural improvement RPA’s intent.
Click for More Information Folsom Dam Road Access Restriction EIS The Folsom Dam Road was closed indefinitely for security reasons on February 28, 2003 to preserve an... PROBLEMS VIEWING OR DOWNLOADING FILES? PLEASE CONTACT LYNNETTE WIRTH AT (916) 978-5102 or lwirth@mp.usbr.gov
Click for More Information Geotechnical and Geophysical Investigations for the Solano Project Terminal Reservoir Reclamation proposes to perform geotechnical and geophysical investigations at the Terminal Dam Faci... FONSI signed May 4, 2012.
Click for More Information Interim Recreation Services at Lake Berryessa Reclamation proposes to award interim concession contracts for the vacant concession areas at Lake B... The EA will be availabe for public review from April 15, 2013 to April 26, 2013.
Click for More Information Interim Renewal Warren Act Contract Between the United States and Sacramento Municipal Utility District Reclamation proposes to execute two 26-month interim renewal Warren Act (WA) contract with Sacrament... FONSI signed on December 28, 2012.
Click for More Information Lake Natoma Waterfront Trail Project EA The City of Folsom is proposing to enhance the existing trails and environmental conditions along th... Public meeting on the EA/IS will be on May 23, 2012.
Click for More Information Mormon Island Auxiliary Dam Modification, Folsom Dam Safety of Dams EIS/EIR The purpose of the Proposed Action is to reduce the seismic and static risk of failure of Mormon Isl... Record of decision signed June 25, 2010.
Click for More Information Napa Berryessa Resort Improvement District – Water and Wastewater Treatment Upgrades and Expansion Reclamation proposes to grant the Napa Berryessa Resort Improvement District (District) a land-use a... FONSI signed Feburary 21, 2013
Click for More Information New Melones Lake Concession Development Reclamation proposes to award a new concession agreement for improvement, development, and managemen... The FONSI was signed on August 28, 2013.
Click for More Information Nimbus Hatchery Fish Passage Project EIS/EIR The purpose of the Project is to create and maintain a reliable system for collecting adult fish to ... Record of Decision signed April 5, 2013.
Click for More Information North Fork Trail Project EA Placer County is proposing to construct a multiple-use trail with parking and staging facilities alo... Reclamation will issue a Supplemental EA by July 2013.
Click for More Information Oak Shores Trail Construction at Lake Berryessa EA Reclamation, in cooperation with Berryessa Trails and Conservation, will construct a 3.6 mile hiking... FONSI signed on March 29, 2011.
Click for More Information Rehabilitation of North End Trail at Lake Berryessa EA Reclamation will rehabilitate the north end trail at Lake Berryessa, in partnership with Berryessa T... FONSI signed on March 29, 2011.
Click for More Information Release of Oakdale I.D. and South San Joaquin I.D. Water from New Melones Reservoir Reclamation proposes to release Oakdale Irrigation District and South San Joaquin Irrigation Distric... The Environmental Assessment is available for public review from April 3, 2013 through April 7, 2013.
Click for More Information Sacramento Suburban Water District Warren Act Contract for 2011 EA Reclamation will enter into a temporary one-year Warren Act contract with Sacramento Suburban Water ... FONSI signed on March 31, 2011.
Click for More Information Stanislaus Afterbay Dam Removal Draft EA The proposed action is to demolish and remove the Afterbay Dam in a controlled manner that is protec... FONSI signed and final EA completed on February 9, 2012.
Click for More Information Summary of Recent Categorical Exclusion Checklists for Central California Area Office Attached in the Documents section are the titles of Categorcal Exclusion Checklists for the Central ...
Click for More Information Temporary Warren Act Contract Between the United States and Placer County Water Agency Reclamation proposes to enter a Five-Year Temporary Warren Act Contract with Placer County Water Age... The FONSI was signed on April 2, 2013.