Bureau of Reclamation Mid-Pacific Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library            Projects & Facilities


Here is a list of the current Stations related to the project:
Special Investigation Projects

Please click the checkbox next to each Station you would like to view the field data for, and then hit the submit button. You can also narrow the criteria of your search below.

Beginning Date: End Date: Matrix

        Check/Uncheck All Checkboxes

Station ID Description Source X-Coord Y-Coord
DS_08 Putah Creek @ Monticello Dam ( Desert Storm Anti Terrorism) Creek/Stream
AC_01 Alder Creek drain Drainage Ditch
AC_02 Alder Creek trial Creek/Stream
AFWQ_01 SE Hall, Auburn Office Domestic Water Supply
AFWQ_02 NE Hall, Auburn Office Domestic Water Supply
AFWQ_04 Basement Fountain, Auburn Office Domestic Water Supply
AFWQ_05 Basement Tap, Auburn Office Domestic Water Supply
ARP_01 Goethe Park - American River (Aerojet Perchlorate Study) River
ARP_02 Buffalo Creek (Aerojet Perchlorate Study) Creek/Stream
ARP_03 Alder Creek (Aerojet Perchlorate Study) Creek/Stream
ARP_04 Folsom South Canal (Aerojet Perchlorate Study) Canal
ARP_05 American River below Buffalo Creek (Aerojet Perchlorate Study) River
ARP_07 Am.River @ Nimbus Hatchery Inlet (Aerojet Perchlorate Study) River
ASR_01 East Range (Pistol) Trench 1 (closest to Foresthill Road) (Auburn Shooting Range) Non-Cultivated
ASR_02 East Range (Pistol) Trench 2 (Auburn Shooting Range) Non-Cultivated
ASR_03 East Range (Pistol) Trench 3 (Auburn Shooting Range) Non-Cultivated
ASR_04 East Range (Pistol) Trench 4 (Auburn Shooting Range) Non-Cultivated
ASR_05 East Range (Pistol) Trench 5 (Auburn Shooting Range) Non-Cultivated
ASR_06 West Range (Rifle) Trench 1 (closest to Foresthill Road) (Auburn Shooting Range) Non-Cultivated
ASR_07 West Range (Rifle) Trench 2 (Auburn Shooting Range) Non-Cultivated
ASR_08 West Range (Rifle) Trench 3 (Auburn Shooting Range) Non-Cultivated
ASR_09 West Range Wall (Rifle) (Auburn Shooting Range) Non-Cultivated
ASR_10 East Range Wall (Pistol) (Auburn Shooting Range) Non-Cultivated
ASR_12 Compound Trench Pistol Range (Auburn Shooting Range) Non-Cultivated
BRM_01 Surface Scraping; 2-3" deep (Brown's Ravine Marina) River
BRM_02 Dug Down 5 feet (Brown's Ravine Marina) River
BRM_04 Dug Down 2 feet (Brown's Ravine Marina) River
BRM_05 Surface Scraping 2ft from lake's edge; 2-3" deep (Brown's Ravine Marina) River
BRM_06 Long Peninsula; 15ft above lake surface (Brown's Ravine Marina) River
BT_02 Negro bar, (Bioterrorism Investigation) Lake
BT_03 Folsom South Canal, (Bioterrorism Investigation) Canal
BT_04 Putah Creek, (Bioterrorism Investigation) Creek/Stream
BT_18 New Melones, (Bioterrorism Investigation) Lake
CHP_01 Carson Hill Mine - Spine Drain #1 Ground Water
CHP_02 Carson Hill Mine - Site #1 Lower Shore Sediment
CHP_03 Carson Hill Mine - Site #2 Lower Shore Sediment
CHP_04 Carson Hill Mine - Site #1 Upper Shore Sediment
CHP_05 Carson Hill Mine - Site #3 Lower Shore Sediment
CHP_06 Carson Hill Mine - Site #3 Upper Shore Sediment
CHP_08 Carson Hill Mine - Site #5 Upper Shore Sediment
CHP_09 Carson Hill Mine - Background Lower Shore Sediment
CHP_10 Carson Hill Mine - Background Upper Shore Sediment
CHP_11 Carson Hill Mine - Spine Drain #2 Ground Water
CHP_12 East drainage above Site 1 Surface Water
CKWF_01 West Side of Building (Cottage Kids Water Fountains) Domestic Water Supply
CKWF_02 East Side of Building (Cottage Kids Water Fountains) Domestic Water Supply
CKWF_03 Preschool South Wall (Cottage Kids Water Fountains) Domestic Water Supply
CKWF_04 Preschool East 1/2 Wall (Cottage Kids Water Fountains) Domestic Water Supply
CKWF_05 Toddler Room (Cottage Kids Water Fountains) Domestic Water Supply
CL_01 Cody Spring Spring
CL_02 Cody Lake Lake
FUST_01 Southwest corner of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_02 Southeast corner of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_03 Northwest corner of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_04 Northeast corner of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_05 Center of east wall of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_06 Waste pile Southwest of excavation pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_07 Backhoe bucket; excavated from 16ft (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_08 Site A; 12.6ft south of southeast corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_09 Site B; 5.2ft south of southeast corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_10 Site C; 5.3ft south of southwest corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_11 Site D; 10ft south of southwest corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_12 Site F; 15ft southwest of southwest corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
FUST_13 Site G; 20ft west of center of west wall of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
MDB_01 Group 1 (McCoy Detention Basin) Soil
MDB_02 Group 2 (McCoy Detention Basin) Soil
MDB_05 Group 5 (McCoy Detention Basin) Soil
MDB_06 Group 7 (McCoy Detention Basin) Soil
MDB_07 Group 8 (McCoy Detention Basin) Soil
MDB_08 Group 9 (McCoy Detention Basin) Soil
MDB_09 Group 10 (McCoy Detention Basin) Soil
MDB_10 Composite of all 9 groups (McCoy Detention Basin) Soil
MDB_12 Trib 2 (McCoy Detention Basin) Surface Water, Soil 588711 4236215
MDB_13 Trib 3 (McCoy Detention Basin) Surface Water, Soil 588331 4237113
MDB_16 Putah South Canal (McCoy Detention Basin) Surface Water 587844 4238212
MI_01 Mormon Island Well 1 (Mormon Island) Sediment
MIADSP_01 MIAD #1: Dam Station 438+00 (Mormon Island Dam Sediment Samples) Surface Water
MIADSP_02 MIAD #2: Dam Station 433+00 (Mormon Island Dam Sediment Samples) Surface Water
MID_02 Mormon Island Wells - OW2 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water
MID_04 Mormon Island Wells - OW11 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water 646412 4313202
MID_06 Mormon Island Wells - SW1 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Surface Water
MID_07 Mormon Island Wells - SW2 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Surface Water 641761 4310743
MID_08 Mormon Island Wells - OW93 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water 648981 4286637
NBD_01 Nimbus Dam near 40" spill pipe and location of new 60" pipe ( Nimbus Dam) Sediment, Soil, Surface Water
NFH_01 Site 001: Under excavated fish pond (Nimbus Fish Hatchery) Soil
NFH_02 Site 002: Under excavated fish pond (Nimbus Fish Hatchery) Soil
NFH_03 Site 003: Under excavated fish pond (Nimbus Fish Hatchery) Soil
NFH_HG_02 Lower Settling Pond ( Nimbus Fish Hatchery Mercury Study) Surface Water
NFH_HG_03 American River downstream of Ponds ( Nimbus Fish Hatchery Mercury Study) Surface Water
NFH_HG_04 R-1 Receiving Water ( Nimbus Fish Hatchery Mercury Study) Surface Water
NFH_HG_05 R-3 American River ( Nimbus Fish Hatchery Mercury Study) Surface Water
NFH_HG_06 O-005 Outfall Water ( Nimbus Fish Hatchery Mercury Study) Surface Water
NPP_001 Breakroom (Nimbus Power Plant Bacteriological Investigation (Water)) Surface Water
NPP_002 Stairway (Nimbus Power Plant Bacteriological Investigation (Water)) Surface Water
NPP_003 Turbine Room (Nimbus Power Plant Bacteriological Investigation (Water)) Surface Water
MID_12 Mormon Island Wells - Detention Pond Discharge (Mormon Island Auxiliary Dam Wetland Monitoring Program) Surface Water
PC_01 Site B: right side of well -- (Putah Creek Special Investigation) Obsevation Well
PC_02 Site C: left side of well (Putah Creek Special Investigation) Obsevation Well
PC_03 Site A: Well's middle (Putah Creek Special Investigation) Obsevation Well
PI_01 Prospect Island Cross Levee Repairs (Prospect Island Levee Repair Soil Pile Investigation) Soil
PII_01 Backside of spray cart (Prospect Island) Soil
PII_03 Area around skid, mounted tank (Prospect Island) Soil
PII_04 Inside skid, mounted tank (Prospect Island) Soil
PP_WQI_01 Pond Pit Mine Adit (Pond Pit Mine Water Quality Investigation) Surface Water
PSP_01 Prospect Island (Prospect Island) Surface Water
PSP_02 Miners Slough (Prospect Island) Surface Water
FBI_01 TPR2-01A-04 & TPR2-01B-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_02 TPR2-01C-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_03 TPR2-02-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_05 TPR2-03B-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_06 TPR2-05-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_07 TPR2-06-04 & TPR2-06A-04 & TPR2-06B-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_08 TPR2-07-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_09 TPD2-22-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_10 TPD2-23-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_11 TPL1-16-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_12 TPL1-17A-04 & TPL1-17B-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_13 TPL1-18A-04 &TPL1-18B-04 ( Folsom Borrow Investigation) Non-Cultivated
FDF_01 Administration Building West (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_02 Administration Building East (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_03 Electric Test (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_05 General Maintenance Lunch Room (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_06 Paint Shop (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_07 Welding Shop (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_08 Electric and Mechanical Shop (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_09 Warehouse B (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_10 Entrance (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_13 Power Plant 4th Floor (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_14 Power Plant 3rd Floor (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_15 Power Plant 2nd Floor (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_16 Pumping Plant (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_17 Dam 8th Floor West Sink (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_19 Drill Crew Ice Machine (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDP_01 Hoist cover for gate ( Folsom Dam Paint project) Paint
FDS_01 Folsom Dam Sump (Folsom Dam Sump) Sump
FDW_01 Administration Building West (Folsom Drinking Water) Domestic Water Supply
FDW_03 Electric Test Shop (Folsom Drinking Water) Domestic Water Supply
FDW_04 Garage (Folsom Drinking Water) Domestic Water Supply
FDW_05 General Maintenance Lunch Room (Folsom Drinking Water) Domestic Water Supply
FDW_06 Paint Shop (Folsom Drinking Water) Domestic Water Supply
FDW_07 Welding Shop (Folsom Drinking Water) Domestic Water Supply
FDW_08 Electic/Mechanic Shop (Folsom Drinking Water) Domestic Water Supply
FDW_09 Warehouse B (Folsom Drinking Water) Domestic Water Supply
FDW_10 Entrance (Folsom Drinking Water) Domestic Water Supply
FDW_11 Picnic Area (Folsom Drinking Water) Domestic Water Supply
FDW_12 Powerplant 6th Floor (Folsom Drinking Water) Domestic Water Supply
FDW_13 Powerplant 4th Floor (Folsom Drinking Water) Domestic Water Supply
FDW_14 Powerplant 3rd Floor (Folsom Drinking Water) Domestic Water Supply
FDW_15 Powerplant 2nd Floor (Folsom Drinking Water) Domestic Water Supply
FDW_17 Dam 8th Floor West Sink (Folsom Drinking Water) Domestic Water Supply
FDW_18 Drill Crew Drinking Fountain (Folsom Drinking Water) Domestic Water Supply
FDW_19 Drill Crew Ice Machine (Folsom Drinking Water) Domestic Water Supply
FDW-01 Admin Office, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FDW-02 Civil Maintence Office, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FDW-03 Plant Mechanic Shop, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FDW-04 Warehouse, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FDW-05 Annet, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FDW-06 Conference Room, Folsom Drinking Water Investigation (Folsom Drinking Water Investigation) Domestic Water Supply
FFDR_01 F.O.P. Directly east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_02 F.O.P. 1 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_03 F.O.P. 2 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_04 F.O.P. 3 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_05 F.O.P. 4 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_06 F.O.P. 5 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_08 F.O.P. 7 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_09 F.O.P. 8 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_10 F.O.P. 9 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_11 F.O.P. 10 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_12 F.O.P. 11 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_13 F.O.P. 12 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_14 F.O.P. 13 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_15 F.O.P. 14 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_16 North end of dike 4 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_17 NE of dike 4 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_18 Below North end of dike 4 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_19 North end of dike 4, at shoreline ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_21 Middle of dike 4, at shoreline ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_22 Middle of dike 4, midway to water ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_23 Between dike 4 and 5 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_24 Between dike 4 and 5, midway to water ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_25 Between dike 4 and 5, near shore ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_26 Center of dike 5 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_27 Between dike 5 and 6 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_28 North between dike 5 and 6 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_29 Between dike 5 and 6, adjacent to dredge channel ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_30 South end of dike 5, halfway to water. ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_31 Between dike 5 and 6, near water ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_32 Between dike 5 and 6, west of FFDR_31 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_33 North end of dike 6, Midway to water ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_35 F.O.P. near dam ( Folsom Flood Damage Reduction) Lake
FFDR_36 F.O.P. between 3 and 4 east ( Folsom Flood Damage Reduction) Lake
FFDR_37 F.O.P. between 8 and 9 east ( Folsom Flood Damage Reduction) Lake
FFDR_38 Point on approach to dredge channel ( Folsom Flood Damage Reduction) Lake
FFDR_39 East of FFER_31 ( Folsom Flood Damage Reduction) Lake
FG_01 Behind Dam, Surface (Folsom Gate Water) Lake
FG_02 Behind Dam, Bottom (Folsom Gate Water) Lake
FG_03 100' Depth (Folsom Gate Water) Lake
FG_04 Stilling Basin (Folsom Gate Water) Lake
FH_DS_01 Fish Hatchery Diversion Structure Waste, Solid
FL_MFS_01 Folsom Lake(Folsom Lake Mercury Fish Study) Biological
FLS_01 Folsom Pipes ( Folsom -Lead soil) Non-Cultivated
FLS_02 North Fork ( Folsom -Lead soil) Non-Cultivated
FLS_03 Natomas Pipe ( Folsom -Lead soil) Non-Cultivated
FLS_04 Folsom Sand Blast ( Folsom -Lead soil) Non-Cultivated
FPP_01 Folsom Pumping Plant Roof (Folsom Pipe Paint) Waste, Solid
FPP_02 Folsom water pipe (Folsom Pipe Paint) Non-Cultivated
FSI_01 01 (Folsom Sump Investigation) Lake
FSI_02 02 (Folsom Sump Investigation) Lake
FSI_03 Sump A (Folsom Sump Investigation) Lake
FSI_04 Sump B (Folsom Sump Investigation) Lake
FSS_01 Folsom Spillway Sediments (Location #1) Lake
FSS_02 Folsom Spillway Sediments (Location #2) Lake
FSS_03 Folsom Spillway Sediments (Location #3) Lake
FSS_04 Folsom Spillway Sediments (Location #4) Lake
FSS_05 Folsom Spillway Sediments (Location #5) Lake
FSS_06 Folsom Spillway Sediments (Location #6) Lake
FSS_07 Folsom Spillway Sediments (Location #7) Lake
FSS_08 Folsom Spillway Sediments (Location #8) Lake
FSS_09 Folsom Spillway Sediments (Location #9) Lake
FSS_10 Folsom Spillway Sediments (Location #10) Lake
FSS_11 Folsom Spillway Sediments (Location #11) Lake
FSS_15 Folsom Spillway Sediments (Location #15) Lake
FSS_16 Folsom Spillway Sediments (Location #16) Lake
FSS_17 Folsom Spillway Sediments (Location #17) Lake
FSS_18 Folsom Spillway Sediments (Location #18) Lake
FSS_19 Folsom Spillway Sediments (Location #19) Lake
FSS_23 Folsom Spillway Sediments (Location #23) Lake
SM_01 S-49: Suisun Slough Next to Terminus of Volanti Slough (Suisun Marsh) Creek/Stream
SM_02 Fairfield Sewage Treatment Plant (Suisun Marsh) Creek/Stream
SM_03 S-40: Boynton Slough (Suisun Marsh) Creek/Stream
SM_04 Frank Horan Slough (Suisun Marsh) Creek/Stream
SM_05 Suisun Creek @ Cordelia Road (Suisun Marsh) Creek/Stream
SM_06 North Bay Aqueduct (Suisun Marsh) Creek/Stream
SM_07 Greene Valley Creek (Suisun Marsh) Creek/Stream
SM_09 Goodyear Slough/ Morrow Club (Suisun Marsh) Creek/Stream
SM_10 Putah South Canal Terminus (Suisun Marsh) Creek/Stream
SM_11 Godfather (Suisun Marsh) Creek/Stream
SM_12 Unnamed Ditch (Suisun Marsh) Creek/Stream
SM_13 Pierce Harbor (Suisun Marsh) Creek/Stream
SM_WQI_01 Sliger Mine Adit (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_03 R-1: American River Upstream of Sliger Mine Discharge Point (Sliger Mine Water Quality Investigation) River
SM_WQI_04 R-2: American River Downstream of Sliger Mine Discharge Point (Sliger Mine Water Quality Investigation) River
SM_WQI_05 SMA Root Seepage #1 (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_06 SMA Root Seepage #2 (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_08 Sliger Mine Main Shaft (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_10 Mine Drainage @ American River (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_11 Storm Runoff (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_12 Crushing Area & side of steep hill; Sliger Mine Rock Investigation (Sliger Mine Water Quality Investigation) Mine/Mine Discharge Waste Rock
SM_WQI_13 1' off shore, 4' u/s of Adit Drainage (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_14 1' off shore, 10' u/s of Adit Drainage (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_15 1' off shore, 15' u/s of Adit Drainage (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_17 10' off shore, 15' u/s of Adit Drainage (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_18 Upstream Stormwater Channel (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_19 Downstream Stormwater Channel (Sliger Mine Water Quality Investigation) Surface Water
SM_WQI_20 Feeder Channel (Sliger Mine Water Quality Investigation) Surface Water
ASR_11 Compound Trench Rifle Range (Auburn Shooting Range) Non-Cultivated
BD_10 Ripon (Bay/Delta) River
BD_13 Contra Costa Canal (Bay/Delta) River
BD_17 Antioch (Bay/Delta) River
BD_20 Cache Slough (Bay/Delta) River
BR_05 Site H (Bromide Investigation) River
BT_01 Folsom Dam, (Bioterrorism Investigation) Lake
BT_12 Sugar Pine Reservoir, (Bioterrorism Investigation) Lake
FBH_01 Geo-technical observation well at footings of new Folsom Bridge (Folsom Bridge Water Quaity Investigation) Observation Well
MDB_11 Trib 1 (McCoy Detention Basin) Surface Water, Soil 588329 4237291
MDB_15 Lower McCoy (McCoy Detention Basin) Surface Water
MI_02 PW3 & 4 (Morman Island) Sediment
MID_01 Mormon Island Wells - OW1 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water
MID_05 Mormon Island Wells - OW12 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water 644642 4312584
SM_WQI_02 Discharge Point 8 Feet Upstream (Sliger Mine Water Quality Investigation) River
SM_WQI_09 Sliger Mine Creek (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
SM_WQI_16 1' off shore, 25' u/s of Adit Drainage (Sliger Mine Water Quality Investigation) Surface Water
WC_01 Willow Creek (Willow Creek) Surface Water
WF_01 Child Care ( Water Fountains) Domestic Water Supply
WF_02 FBI Garage ( Water Fountains) Domestic Water Supply
WF_03 East Wing ( Water Fountains) Domestic Water Supply
WF_04 West Wing ( Water Fountains) Domestic Water Supply
WFW_02 1st Floor, West Wing, 3rd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_04 1st Floor, West Wing, 5th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_05 1st Floor, West Wing, 6th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_06 1st Floor, West Wing, 7th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_07 1st Floor, West Wing, 8th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_09 1st Floor, West Wing, 10th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_10 1st Floor, West Wing, 11th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_11 1st Floor, West Wing, 12th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_13 1st Floor, East Wing, 2nd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_15 2nd Floor, West Wing, 1st Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_16 2nd Floor, West Wing, 2nd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_17 2nd Floor, West Wing, 3rd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_19 2nd Floor, West Wing, 6th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_20 2nd Floor, West Wing, 7th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_21 2nd Floor, West Wing, 8th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_22 2nd Floor, West Wing, 9th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_24 2nd Floor, West Wing, 12th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_25 2nd Floor, West Wing, 13th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_27 2nd Floor, East Wing, 2nd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_29 2nd Floor, East Wing, 5th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_30 2nd Floor, East Wing, 6th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WWW_01 Wooley Way Warehouse Drinking Fountain ( Wooley Way Warehouse Drinking Fountain Water Quality) Domestic Water Supply
FPP_03 Pipe at the Folsom Pumping Plant (Folsom Pipe Paint) Paint
FDW_21 Admin - Admin Building Sink in Breakroom (Folsom Drinking Water) Domestic Water Supply
FDW_20 Annex - Annex sink in breakroom (Folsom Drinking Water) Domestic Water Supply
FDW-22 ARWEC - American River Water Education Center drinking fountain outside main entrance (Folsom Drinking Water) Domestic Water Supply
MID_10 Mormon Island Wells - PW-06-2 (Mormon Island Auxiliary Dam Wetland Monitoring Program)
MID_11 Mormon Island Wells - PW2 (Mormon Island Auxiliary Dam Wetland Monitoring Program)
AFWQ_03 NW Hall, Auburn Office Domestic Water Supply
ARP_06 Lake Natoma below Alder Creek (Aerojet Perchlorate Study) Lake
FBI_04 TPR2-03A-04 ( Folsom Borrow Investigation) Non-Cultivated
FBI_14 TPL1-19-04 ( Folsom Borrow Investigation) Non-Cultivated
FDF_11 Picnic Area (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDP_02 Hand Rail ( Folsom Dam Paint project) Paint
FDP_03 Gate Hoste Platform ( Folsom Dam Paint project) Paint
FDW_02 Administration Building East (Folsom Drinking Water) Domestic Water Supply
FDW_16 Pumping Plant (Folsom Drinking Water) Domestic Water Supply
FFDR_07 F.O.P. 6 east of dam ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_20 North end of dike 5 ( Folsom Flood Damage Reduction) Non-Cultivated
FFDR_34 Dike 6 near tree line ( Folsom Flood Damage Reduction) Non-Cultivated
FUST_14 Site J; 34ft southwest of southwest corner of pit (Folsom Underground Storage Tank Removal) Non-Cultivated
NFH_HG_01 Lake Natoma ( Nimbus Fish Hatchery Mercury Study) Surface Water
SM_WQI_07 Sliger Mine Pipe Leak (Sliger Mine Water Quality Investigation) Mine/Mine Discharge
BRM_03 Dug Down 6 feet (Brown's Ravine Marina) River
BT_13 Sly Park Reservoir, (Bioterrorism Investigation) Lake
CHP_07 Carson Hill Mine - Site #4 Lower Shore Sediment
FSS_12 Folsom Spillway Sediments (Location #12) Lake
MDB_04 Group 4 (McCoy Detention Basin) Soil
MDB_14 Outfall (McCoy Detention Basin) Surface Water 588205 4236209
MID_03 Mormon Island Wells - OW13 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water 648745 4285060
PII_02 Frontside of spray cart (Prospect Island) Soil
SM_08 S-97:Cordelia Slough @ IBIS Club (Suisun Marsh) Creek/Stream
WFW_01 1st Floor, West Wing, 1st Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_26 2nd Floor, East Wing, 1st Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
MDB_03 Group 3 (McCoy Detention Basin) Soil
FDF_04 Garage (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_18 Drill Crew Drinking Fountain (Folsom Drinking Fountain Investigation) Domestic Water Supply
FDF_12 Power Plant 6th Floor (Folsom Drinking Fountain Investigation) Domestic Water Supply
ARG_01 Mississippi Bar TP-1 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_02 TP-2 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_03 TP-3 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_04 TP-4 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_05 TP-5 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_06 TP-6 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_07 TP-7 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_08 TP-8 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_09 TP-9 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_10 TP-10 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_11 TP-11 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_13 TP-13 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_14 TP-14 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_15 TP-15 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_16 TP-16 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_17 TP-17 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_18 TP-18 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_19 TP-19 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_20 TP-20 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_21 TP-21 (American River Spawning Gravel Augmentation) Non-Cultivated
ARG_22 American River @ Salior Bar (American River Spawning Gravel Augmentation) Non-Cultivated
PC_W_01 MW-1 (Putah Creek Sewage Ponds) Observatioin Well
PC_W_02 MW-2 (Putah Creek Sewage Ponds) Observatioin Well
PC_W_03 MW-3 (Putah Creek Sewage Ponds) Observatioin Well
CCAO_01 Folsom Admin Bathroom - Men (Folsom Admin Bathrooms) Floor Tile 659294 4285751
CCAO_02 Folsom Admin Bathroom - Women (Folsom Admin Bathrooms) Floor Tile 659294 4285751
BVR_01 Spring (Buena Vista Rancheria) Spring 682741 4238014
BVR_02 Pond (Buena Vista Rancheria) Spring 682806 4238180
BVR_03 Spring/Pond Discharge (Buena Vista Rancheria) Spring 682823 4238179
BVR_04 Homestead (Buena Vista Rancheria) Spring 682697 4238200
BVR_05 Outdoor Kitchen (Buena Vista Rancheria) Spring 682810 4238578
WFW_03 1st Floor, West Wing, 4th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_08 1st Floor, West Wing, 9th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_12 1st Floor, East Wing, 1st Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_18 2nd Floor, West Wing, 5th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_23 2nd Floor, West Wing 11th Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_28 2nd Floor, East Wing, 3rd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
WFW_14 1st Floor, East Wing, 3rd Fountain (Water Fountain Water Quality) (Cottage Way Building) Domestic Water Supply
MID_09 Mormon Island Wells - PW-06-1 (Mormon Island Auxiliary Dam Wetland Monitoring Program)
NIM_01 NIM 16-1 (Gate 16) (Nimbus Gates Sediment) Sediment
NIM_02 NIM 16-2 (Gate 16) (Nimbus Gates Sediment) Sediment
NIM_03 NIM 17-1 (Gate 17) (Nimbus Gates Sediment) Sediment
NIM_04 NIM 17-2 (Gate 17) (Nimbus Gates Sediment) Sediment
NIM_05 NIM 18-1 (Gate 18) (Nimbus Gates Sediment) Sediment
NIM_06 NIM 18-2 (Gate 18) (Nimbus Gates Sediment) Sediment
ACM_01 Alder Creek North Arm (Alder Creek Mecury) Surface Water
ACM_02 Alder Creek South Arm (Alder Creek Mercury) Surface Water
ACM_03 Alder Creek Below Folsom Blvd (Alder Creek Mercury) Surface Water
ACM_04 Alder Creek @ Prairie City (Alder Creek Mercury) Surface Water
ACM_05 North Arm "Deep" (Alder Creek Sediment) Sediment
ACM_06 North Arm "Shallow" (Alder Creek Sediment) Sediment
ACM_07 South Arm #3 (Alder Creek Sediment) Sediment
ACM_08 South Arm #2 (Alder Creek Sediment) Sediment
ACM_09 South Arm Deep (Alder Creek Sediment) Sediment
ACM_10 South Arm #1 (Alder Creek Sediment) Sediment
MDB_17 Tooby Drain (McCoy Detention Basin) Surface Water 588011 4237697
SM_WQI_22 Bioreactor Effluent (Sliger Mine Water Quality Investigation) Surface Water
RMW_01 MW 1 (Rancho Monticello Investigation) Monitoring Wells 564870.4 4271417.9
RMW_02 MW 2 (Rancho Monticello Investigation) Monitoring Wells 564843.8 4271410.3
RMW_03 MW 3A (Rancho Monticello Investigation) Monitoring Wells 564873.9 4271377
SM_WQI_21 Bioreactor Inflow (Sliger Mine Water Quality Investigation) Surface Water
MID_13 SM-1 (Mormon Island Auxiliary Dam Wetland Monitoring Program) Ground Water

 

Website Maintained by: Environmental Monitoring Branch


Bureau of Reclamation, Mid-Pacific Region  Public Affairs Office  2800 Cottage Way, Sacramento CA  95825-1898
Main (916) 978-5100   |   FAX (916) 978-5114   |   TDD (916) 978-5608

MP Regional Offices Telephone Numbers


July 8, 2014