Environmental Documentation Including BA's/BO's
Documents are in portable document format (PDF). You will need Adobe Acrobat Viewer to view.
Draft Environmental Assessments/Findings of No Significant Impact
- Draft Supplemental Environmental Assessment and Draft FONSI for 2006 Renewal of Interim Water Service Contracts for the Central Valley Project
- Draft FONSI for the City of Lindsay, 2004
- Draft FONSI for the City of Fresno, 2004
- Draft EA/FONSI for the Article 5 Exchanges for the Cross Valley Central Valley Project Contractors with Others
- Draft EA/FONSI for the San Joaquin Valley National Cemetery Long-Term Water Service Contract
- Draft Environmental Assessment and Draft FONSI for the Pajaro Valley Water Management Agency, the Westlands Water Distribution District No. 1, and the Santa Clara Valley Water District
- Supplemental Draft Environmental Assessment and Draft FONSI for the Cross Valley Canal Contractors
- Revised Draft Environmental Assessment and Draft FONSI for Contra Costa Water District
- Delta-Mendota Canal Unit Draft EA and FONSI
- Environmental Documents Available for Renewal of Cities of Fresno and Lindsay's CVP Long-Term Water Service Contacts
- Draft Updated Environmental Assessment and Draft Finding of No Significant Impact for the Renewal of the Long-Term Water Service Contracts for the Shasta and Trinity River Divisions Contractors
- Draft Environmental Assessment and Draft Finding of No Significant Impact for the Feather Water District
- Press Release MP-04-57
- Draft Revised Enivironmental Assessment and Draft Finding of No Significant Impact for the Sacramento River Division
- Draft Environmental Assessment for the 2004 Renewal of Interim Water Service Contracts
- Draft Finding of No Significant Impact (through February 28, 2006) (pdf - 41 KB | Word - 358 KB)
- Draft Addendum - To Interim Renewal Contract Proposed Action/Project Description, December 2003 (pdf - 18 KB | Word - 36 KB)
- Draft Supplemental Environmental Assessment for the 2004 Renewal of Interim Water Service Contracts through February 28, 2006, Central Valley Project, California, December 2003 (pdf - 88 KB | Word - 517 KB)
- Draft Appendix A: Draft Form Contract 12/12/03 (pdf - 17 KB | Word - 38 KB)
- Draft Appendix B: Draft DMC Form of Contract 12/12/03 (pdf - 1.4 MB)
- Appendix C: Supplemental Environmental Assessment for the 2002 Renewal of Interim Water Service Contracts through February 29, 2004, Central Valley Project, California, February 2002
(pdf - 58 KB | Word - 265 KB)
- Appendix A: 2002 Interim Contract Sample (pdf - 13 KB | Word 28 KB)
- Appendix B: Final 2001 Supplemental EA (pdf - 7.5 MB)
- Appendix C: Interim Contract Renewal Biological Opinion Status Report (pdf - 35 KB | Word - 65 KB)
- Appendix D: Responses to Comments on the Draft 2002 Supplemental EA (pdf - 2.2 MB)
- Appendix E: National Marine Fisheries Service Concurrence Letter (pdf - 156 KB)
- Appendix F: U.S. Fish and Wildlife Service Biological Opinion (pdf - 704 KB)
- Draft Appendix D: Maps showing the Existing Habitat and Service Area Location for 17 Interim Renewal Contractors shown on Table 1 (pdf - 9.1 MB)
- Draft Appendix E: Summaries of Existing Habitat and Habitat Change Since 1993 fFor Each 2004 Interim Renewal Contractor (split into two files) (pdf - 540 KB | 565 KB)
- Draft Appendix F: Summary Status Report On The Conservation Actions Included In The 2000 Biological Opinion (pdf - 51 KB | Word - 112 KB)
- Press Release MP-03-76
To view these documents, you will need the Adobe Reader.
Contact: Janet Sierzputowski, Public Affairs Office, 916/978-5112
For assistance or information about our website please contact MP Region Public Affairs

