Banner: Bureau of Reclamation, Great Plains Region
Reclamation Home            Regional Offices            Newsroom            Library            Projects & Facilities

Great Plains Region Photographs

2013 GP Regions Photo Contest Gallery

64
Dave Tordonato and Patrick Fischer inspect the downstream side of Yellowtail Dam.
65
Looking downstream from within the Gibson Dam Spillway Tunnel, Sun River Project, Mont.
66
Inspecting the Flatiorn Penstocks surge tank for seepage at the end of the Bald Mountain Tunnel.
67
Matt Gappa, Eric Schlosser, Scott Fraizer and Stan Core overlook the new cone jet valve for the Southern Delivery System.
68
Jeff Ticknor and Patrick Fischer of GPRO perform a rope inspection of the Granby spillway.
69
Looking west toward Mt. Elbert, from the crest of Mt. Elbert Dam.
70
Mni Wiconi Rural Water Supply System Core Line installed adjacent to the Pass Creek Basin.
71
Look Mom, nothing but air. Wildlife at Estes Power Plant.
72
The grass is greener on the other side of the parapet wall at Estes Power plant.

Last Updated: October 23, 2014

Privacy Policy | Disclaimer | Accessibility | FOIA | Quality of Information | FAQ | Notices
DOI | Recreation.gov | USA.gov
Stay in touch with Reclamation: Facebook | Twitter | YouTube | Flickr | Tumblr | Pinterest | Instagram | RSS | Multimedia