Recent Bid Results
Note: The following results reflect the bids as opened. They are preliminary, and have not been adjusted for mathematical errors that may have been made in the submitted bids. Award will be made after review of the bid documents and a contractor responsibility determination by the Contracting Officer.
- R12PS60224
Tophead Drive Drill Rig w/Truck
Bid Opening October 11, 2012 at 2:00PM
1. Kipper Tool, Gainsville, GA $840,900.00
Option 2 $3,565.00
Option 3 $6,925.00
Independent Govt. Cost Estimate $850.000.00 - R12PS60314
Casper Mountain West Tower Replacement, Wyo.
Bid Opening: Aug. 31, 2012 at 2:30 P.M.
1. Flake Towers, LLC, Clarksville, TN $197,500.00
2. B&F Contracting, Inc., Phoenix, AZ $210,936.00
3. Milender White Construction Co., Arvada, CO $212,893.00
4. Sabre Communications, Sioux City, IA $226,288.00
Independent Govt. Cost Estimate $233,514.66 - R11PS60365
Electrical Distribution System Replacement - Eastern Colorado Area Office, Loveland, Colo.
Bid Opening: Aug. 29, 2012 at 2:30 P.M.
1. St. Andrew Construction, Eastlake, CO $581,416.00
2. Growling Bear, Greeley, CO $729,312.77
3. Bison Construction, Ft. Collins, CO $959,365.00
4. Koontz Electric Co., Morrilton, AZ $1,272.628.00
Independent Govt. Cost Estimate $809,547.00 - R12PS60110
Addition of windows - Eastern Colorado Area Office, Loveland, Colo.
Bid Opening: Aug. 24, 2012, 2:30 P.M.
1. Cornerstone Construction, Estes Park, CO $195,002.00 2. Joe Funk Construction, Dallas, TX $222,953.00 3. Growling Bear Company, Greeley, CO* $110,487.00 4. G.L. Hoff Construction, Loveland, CO $158,695.00 5. Calahan Construction, Denver, CO $145,706.00 6. Guardian Construction, Salt Lake City, UT $117,665.00 Independent Govt. Cost Estimate $133,404.00 *Apparent low bidder - R12PS60071
Mills Complex Fire safety System - North Platte Area, Wyo.
Bid Opening: Date April 26, 2012 2:30 P.M.
1. BBA Engineering PC Schedule A $429,112.00 Schedule B $250,127.20 Schedule C $97,090.00 Total $776,329.20 2. Brahma Group Inc. No Schedule Provided Total $709,217.60 IGCE Total Schedule A $304,202.94 Schedule B $218,540.24 Schedule C $79,031.64 Total $601,774.83 - R12PS60109
Sugar Loaf Dam Concrete Spillway Repair Colo.
Bid Opening Date April 5, 2012 2:30 P.M.
1. Tropical Contracting, San Antonio, TX $147,080.00
2. C&W Diving Services Inc., National City, CA $277,644.50
3. Asian Construction, Berthoud, CO $284,185.50
4. Gracon Corporation, Loveland, CO $324,168.50
5. Kovilic Construction, Franklin Park, IL $358,750.00
6. Inland Potable Service, Centennial, CO $409,662.00
7. MJ Hughes Construction, Gresham, OR $415,135.00
8. Mueller Construction, Glenwood Springs, CO $492,499.00
Independent Government Estimate $275,213.25 - R11PS60311
Green Mountain Spillway Bridge and Elliott Creek Chute Repairs - Colorado Big Thompson Project Colo.
Bid Opening July 22, 2011 2:00 P.M.
1. MJ Hughes Construction Schedule A $591,890.00 Gresham, OR Schedule B $393,682.00 Total $984,572.00 2. Gracon Corporation Schedule A $1,031,435.00 Loveland, CO Schedule B $293,760.00 Total $1,325,195.00 3. American Civil Constructors Schedule A $1,152,440.00 Littleton, CO Schedule B $337,220.00 Total $1,489,660.00 Independent Government Cost Estimate Schedule A $885,064.00 Schedule B $409,773.00 Total $1,294,837.00 - R11PS60176
Overhaul Hydraulic Head Gate Hoist Mt Elbert Power Plant Fryingpan Arkansas Project Colo.
Bid Opening Date June 28, 2011 at 2:00 P.M.
1. Engstorms Welding, Junction, City KS $145,000.00
2. Gracon Corporation, Loveland, CO $202,668.00
3. Kovilic Construction, Franklin Park, IL $399,000.00
Independent Government Estimate $222,325.00 - R11PS60162
Trenton Dam Rip Rap Replacement Neb.
Bid Opening Date May 5, 2011 at 2:30 P.M.
1. Road Builders Inc, Murrieta, GA $141,800.00
2. Aspen Construction, Hackensack, MN $189,980.00
3. Pavkov Contracting, Sumter, SC $211,084.00
4. Four Star Construction, Kansas City, MO $326,156.20
IGCE $95,000.00 - R11PS60163
Ketterling Point Shore Protection Shadehill Reservioir, S. D.
Bid Opening Date May 3, 2011 2:30P.M.
1. Aspen Construction Schedule A $269,125.90 Hackensack, MN Schedule B $61,925.00 Schedule C $123,850.00 Schedule D $247,700.00 2. Pavkov Contracting Schedule A $866,423.00 Sumter, SC Schedule B $95,000.00 Schedule C $190,000.00 Schedule D $380,000.00 3. Miller Construction Schedule A $629,680.00 Isabel, SD Schedule B $100,875.00 Schedule C $201,750.00 Schedule D $403,500.00 4. Kovilic Construction Schedule A $1,370,350.00 Franklin Park, IL Schedule B $265,000.00 Schedule C $530,000.00 Schedule D $1,060,000.00 5. Quinn Construction Schedule A $674,610.00 Rapid City, SD Schedule B $177,500.00 Schedule C $355,000.00 Schedule D $710,000.00 6. Norcon Corporation NOT A BID 7. Prudent Technologies Schedule A $1,174,572.91 Kansas City, MO Schedule B $237,725.00 Schedule C $364,050.00 Schedule D $616,100.00 8. Ho Chunk Builder Schedule A $617,550.00 Sioux City, NE Schedule B $62,500.00 Schedule C $125,000.00 Schedule D $250,000.00 9. Rachel Contracting Schedule A $402,000.00 St. Michael, MN Schedule B $55,000.00 Schedule C $110,000.00 Schedule D $220,000.00 10. DLM Contracting Schedule A $534,910.00 Bozeman, MT Schedule B $130,000.00 Schedule C $250,000.00 Schedule D $500,000.00 IGCE Schedule A $510,000.00 Schedule B $105,000.00 Schedule C $200,000.00 Schedule D $370,000.00 - R11PS60202
Coating Repair of Shadehill Dam 72 inch Steel Outlet Pipe, Shadehill Unit, Missouri Basin Project, S. D.
1. TMI Coating Schedule A $169,999.25 Eagar, MN Schedule B $290,500.00 2. Long Painting Schedule A $191,219.00 Kent, WA Schedule B $273,843.00 3. Abhe & Svoboda Schedule A $206,720.00 Prior Lake, MN Schedule B $330,195.00 4. Huber Contracting Schedule A $230,000.00 Belvidere, SD Schedule B $295,000.00 5. Horsley Specialties Schedule A $249,516.00 Rapid City, SD Schedule B $448,336.00 6. PCI Roads LLC Schedule A $341,955.55 Saint Michael, MN Schedule B $471,251.05 7. Kovilic Construction Schedule A $261,150.00 Franklin Park, IL Schedule B $386,725.00 Govt Estimate Schedule A $193,360.00 Schedule B $330,195.00 - R11PS60187
Road Repair - Operation & Maintenance, Shadehill Reservoir, Shadehill Unit, S. D.
Bid Opening April 8
1. Miller Construction & Gravel LLC Schedule A $60,250.00 Isabel, SD Schedule B $30,000.00 2. Rosenau Enterprises Schedule A $69,460.00 Lemmon, SD Schedule B $36,380.00 3. Central America Inc. Schedule A $80,886.19 Lead, SD Schedule B $59.677.30 4. Rachel Contracting Schedule A $84,300.00 St. Michael, MN Schedule B $35,300.00 5. Quinn Construction Inc. Schedule A $87,700.00 Rapid City, SD Schedule B $44,950.00 6. R P & H, Inc. Schedule A $89,200.00 Reliance, SD Schedule B $42,500.00 7. Ghost Bear Contracting Inc. Schedule A $156,956.00 Oglala, SD Schedule B $56,600.00 Independent Government Cost Estimate Schedule A $96,550.00 Schedule B $46,510.00 - R11PS60085
Bridge and Spillway Concrete Repairs, Frenchman and Cambridge Division, Pick-Sloan Missouri River Program, Neb.
Bid Opening March 16
1. Kovilic Construction Co. Schedule A $365,830.00 Franklin Park, IL Schedule B $380,700.00 Total A+B $746,530.00 2. Aspen Construction Co. Schedule A $377,361.29 Hackensack, MN Schedule B $457,831.58 Total A+B $835,192.87 3. Guarantee Interiors Schedule A $509,500.15 St. Louis, MO Schedule B $401,178.40 Total A+B $910,678.55 4. Pavkov Contracting Co, Inc. Schedule A $434,873.00 Sumter, SC Schedule B $492,333.00 Total A+B $927,206.00 5. United Contracters, Inc. Schedule A $556,568.00 Johnston, IA Schedule B $782,591.00 Total A+B $1,339,159.00 Independent Government Cost Estimate Schedule A $295,891.50 Schedule B $315,513.80 Total A+B $611,405.30 - R11PS60026
Riverside Campground Development, Canyon Ferry Reservoir, Montana
Bid Opening: April 12 at 2:30P.M.
1. Helena Sand & Gravel, Helena, MT $923,548.50
2. North Wind Inc., Kellogg, ID $952,810.00
3. CK MAY Excavating, Belgrade, MT $995,930.00
4. Swank Enterprises, Valier, MT $1,075,694.20
5. Aspen Construction, Hackensack, MN $1,119,483.76
6. J. Talcott Construction, Great Falls, MT $1,181,280.00
7. Ginno Construction Co., Coeur D'Alene, ID $1,214,137.00
8. Landscape Unlimited, Lincoln, NE $1,304,050.00
9. Western State Construction, Spokane, WA $1,332,294.00
10. C-2 Construction, Mountain Home, ID $1,808,105.00
IGCE $1,193,945.00 - R11PS60001
Stilling Basin Repairs River Outlet Works Cedar Bluff Dam, Cedar Bluff Unit Pick-Sloan Missouri Basin Program, Neb.
1. Lead Con Inc., Hudson, WI $113,718.00
2. Four Star Const, Kansas City, MO $142,843.20
3. Norcon Corp, Schoefield, WI $145,231.00
4. WLH Const, Denver, CO $154,572.00
5. Kovilic Const, Franklin Park, Il $168,450.00
6. Fuel Tank Maint, Cookeville, TN $212,120.00
7. MJ Hughes, Gresham, OR $232,950.00
IGCE $170,000.00 - R10PS60400
Glen Elder Dam Soil Cement Repair Pick Sloan Missouri Basin Program Kan.
Bid Opening September 2, 2:00P.M.
1. Joe Funk Construction Engineers, Dallas, TX $434,764.33
2. Dondlinger & Sons Constr., Wichita, KS $438,960.00
3. Smokey Hill LLC, Salina, KS $498,395.00
4. VIECO Construction, St. Joseph, MO $618,000.00
5. Norcon Corporation, Schofield, WI $733,120.00
Government Estimate $661,782.16 - R10PS0186
Glendo Dam Modification Oregon Trail Division Glendo Unit Pick Sloan Missouri Basin Program Wyo.
Bid Opening August 20, 2010 at 2;00 P.M.
1. Johnson-Wilson, Helena, MT $16,777,777.00
2. RSCI, Meridian, ID $17,237,902.00
3. Sena Construction, Centennial, CO $17,784,790.00
4. ASI Construction, Pueblo West, CO $17,847,822.00
5. Oftedal Construction, Miles City, MT $18,514,620.00
6. American Civil, Littleton, CO $19,623,038.00
7. Ames Construction, Aurora, CO $21,706,880.00
8. Mowat Construction, Woodinville, WA $20,633,370.00
9. COP Wyoming LLC, Sheridan, WY $24,017,148.00
Government Estimate $18,587,934.00 - R10PS60342
Pierre Office Building – Phase II Pierre, S. D.
Bid Opening August 18, 2010 2:00 P.M.
1. Zarecky's Midwest Construction Schedule A $23,8357.00 Pierre, SD Schedule B 13,350.00 Total 251,707.00 2. Sharpe Enterprises Inc. Schedule A $314,930.00 Pierre, SD Schedule B $32,100.00 Total $347,030.00 3. RCS Construction Schedule A $363,711.00 Rapid City, SD Schedule B $21,363.00 Total $385,074.00 Government Estimate Schedule A $249,330.20 Schedule B $15,830.38 Total $265,210.58 - R10PS60324
East Shore Road Gabion Repair and Extension Canyon Ferry Reservoir, Mont.
Bid Opening August 17, 2010 2:30 P.M.
1. Mockel Precast and Exc., East Helena, MT $183,351.00
2. Scott Construction, East Helena, MT $203,224.00
3. Storm Water Construction, Havre, MT $219,805.00
Government Estimate $182,046.60 - R10PS60323
Confederate Creek Culvert Replacement Canyon Ferry Reservoir, Mont.
Bid Opening August 12, 2010 2:30 P.M.
1. A.M. Wells Inc., Norris, MT $258,675.00
2. DLM Construction, Bozeman, MT $282,815.00
3. Western Municipal Const., Billings, MT $357,229.00
4. Diamond Construction, Helena, MT $393,254.50
5. Mockel Precast Inc., East Helena, MT $460,824.00
Government Estimate $303,076.00 - R10PS60340
Ramp Flumes Courtland Canal, Pick Sloan Missouri Basin Program - Neb. and Kan.
1. ERS, Inc. Schedule A $631,875.00 Jackson, MS Schedule B $358.890.00 Total $990,765.00 2. Central Builders Schedule A $399,900.00 Woodbine, IA Schedule B $199,840.00 Total $599,740.00 3. Gracon Corp Schedule A $458,727.00 Loveland, CO Schedule B $179,737.50 Total $638,464.50 4. Midwest Underground Schedule A $297,825.00 Lincoln, NE Schedule B $165,890.00 Total $463,715.00 IGCE Schedule A $332,300.00 Schedule B $181,960.00 Total $514,260.00 - R10PS60R17 (ARRA)
Universal Accessibility Modifications, Silo, Hellgate, Confederate, White Earth, Cottonwood, Campgrounds Campgound, and Canyon Ferry Vistor Center
Canyon Ferry Reservoir - Mont.
Bid Opening 3/4/10
1. Mockel Precast & Excavating Inc. Schedule A. $158,740.00 East Helena, MT Schedule B. $165,990.00 Schedule C. $124,815.00 Total $449,545.00 2. Northside Welding & Fabrication, Inc. Schedule A. $164,504.23 Helena, MT Schedule B. $162,829.02 Schedule C. $137,006.44 Total $464,339.69 3. J&S Inc. Schedule A. $199.053.00 Bozeman, MT Schedule B. $190,302.35 Schedule C. $138,738.50 Total $528,093.85 4. Lane & Co., Inc. Schedule A. $193,620.86 Cortez, CO Schedule B. $188,905.06 Schedule C. $145,960.78 Total $528,486.70 5. Hall Construction Schedule A. $189,200.00 Belgrade, MT Schedule B. $201,575.00 Schedule C. $150,330.00 Total $541,105.00 6. Helena Sand & Gravel Inc. Schedule A. $216,162.50 Helena, MT Schedule B. $205,238.75 Schedule C. $167,973.50 Total $589,374.75 7. Lord’s Construction Schedule A. $211,912.50 Fort Walton Beach, FL Schedule B. $171,372.10 Schedule C. $238,408.95 Total $621,693.55 8. Diamond Construction Schedule A. $205,475.00 Helena, MT Schedule B. $201,552.00 Schedule C. $220,853.50 Total $627,880.50 9. W.R. Lane Construction Inc Schedule A. $272,385.00 Toston, MT Schedule B. $267,447.00 Schedule C. $204,496.00 Total $744,328.00 IGCE Schedule A. $362.285.00 Schedule B. $303,180.50 Schedule C. $257,218.00 Total $922,683.50 - R10PS60R15
Afterbay Irrigation Pump and Intake Structure Addition Yellowtail Government Camp Mont.
Bid Opening February 26, 2010
1. Londscopes Unlimited, Lincoln, NE $346,435.00
2. Troy Management Group, Reno, NV $348,936.61
3. Western Construction Municpal, Billings, MT $410,255.00
4. MT Civil Contractors, Belgrade, MT $437,017.00
5. Sletten Construction, Cody, WY $472,191.58
6. C & S Construction, Billings, MT $490,666.57
7. Stillwater Exc., Columbus, MT $512,250.00
8. W. Construction, Bozeman, MT $657,444.25
9. Pacific Tech, Longview, WA $689,355.00
Engineer's Estimate $296,687.00 - R10PS60R09 ARRA
Universal Accessibility Modifications, Jo Boner, Lewis and Clark, Goose Bay, and Chinamen’s Gulch Campgrounds
Canyon Ferry Reservoir Mont.
Bid Opening: January 28, 2010
1. Mockel Precast & Excav Schedule A $52,525.00 East Helena, MT Schedule B $57,295.00 Schedule C $53,985.00 Total $163,805.00 2. Diamond Construction Schedule A $68,182.00 Helena, MT Schedule B $52,142.00 Schedule C $46,815.00 Total $167,139.00 3. Lapke Construction Schedule A $57,025.00 Simms, MT Schedule B $62,200.00 Schedule C $59,725.00 Total $178,950.00 4. Helena Sand & Gravel Schedule A $73,333.00 Helena, MT Schedule B $58,999.00 Schedule C $56,874.00 Total $189,206.00 5. W Construction Schedule A $66,449.50 Bozeman, MT Schedule B $69,296.00 Schedule C $65,499.00 Total $201,244.50 6. Toepfer Concrete Schedule A $79,562.00 Billings, MT Schedule B $69,816.00 Schedule C $67,756.00 Total $217,134.00 7. Hall Construction Schedule A $71,100.00 Belgrade, MT Schedule B $81,650.00 Schedule C $70,175.00 Total $222,925.00 8. Blevin Excavation Schedule A $73,952.00 Bozeman, MT Schedule B $80,429.00 Schedule C $69,950.00 Total $224,331.00 9. James Talcott Construction Schedule A $79,088.00 Great Fall, MT Schedule B $78,708.00 Schedule C $80,915.00 Total $238,711.00 10. TDT Construction Schedule A $80,805.00 Ashland, MT Schedule B $88,205.00 Schedule C $88,177.00 Total $257,187.00 11. Bearstar Enterprises Schedule A $102,870.00 Billings, MT Schedule B $112,773.00 Schedule C $100,559.00 Total $316,202.00 12. Hardrive Const. Schedule A $115,326.55 Billings, MT Schedule B $110,924.20 Schedule C $105,564.65 Total $331,815.40 13. William R. Lane Schedule A $116,420.00 Toston, MT Schedule B $113,540.00 Schedule C $107,000.00 Total $336,960.00 - R10PS60R06
Enders Dam Outlet Works Metalwork Recoating Pick-Sloan Missouri Basin Program Frenchman Cambridge Division Nebr.
Bid Opening December 29, 2009
1. Hartman Walsh Painting Co., St. Louis, MO $281,728.82
2. Coblaco Service Co., Aurora, CO $296,694.00
3. TMI Coatings, St. Paul, MN $297,300.00
4. Long Painting Co., Kent, WA $305,628.00
5. Zieglar Industries, Nauvoo, IL $448,904.00
IGCE $250,500.00