Bureau of Reclamation Banner

Functional Area: Engineering and Design Services

Action Item 13

Analyze the potential benefits and requirements/tradeoffs associated with alternative funding of the engineering and design staff. This would include an analysis of whether the costs of maintaining core capabilities within the TSC should appropriately be funded by direct appropriations, by water and power customers, or by some combination of the two. 

Team Lead: Larry Walkoviak, Deputy Regional Director, Lower Columbia Region

Team Members: TBD

Objectives:

Tasks:

Milestones:

 Products: (If you would like to provide comments on any draft products, visit the Draft Products page.)

No products available at this time.


Last Updated: January 10, 2007