Bureau of Reclamation Banner

Design, Estimating and Construction (DEC) Identity Graphic

DEC Authority and References

Tip:  You can either view or download ("open" or "save") the files below.  For easy navigation when "opening" and viewing the files, click the "Back" button on the toolbar to return to this "DEC Authority and References" page.





Design Estimate Construction (DEC) Position and Review Process
September 1, 2006
Adobe Acrobat - 113 KB .pdf File


Reclamation Manual Release—Policy FAC P10
Independent Oversight of Design, Cost Estimating, and Construction
November 16, 2007
Adobe Acrobat - 38 KB .pdf File


Reclamation Manual Release—Directives and Standards FAC 10-01
Identifying Design, Cost Estimating, and Construction Projects for which Independent Oversight Review is Required, and Performing those Reviews
November 7, 2007
Adobe Acrobat - 57 KB .pdf File


Economic and Environmental Principles and Guidelines for Water and
Related Land Resources Implementation Studies

March 10, 1983
Adobe Acrobat - 869 KB .pdf File


Technical Service Center's Design Data Collection Guidelines
http://www.usbr.gov/pmts/tech_services/engineering/design/designdatacollectionguides/index.html


Last updated: 9/15/14 - TSP
Back to Top Back to Top