Newton Project - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Canals |
6.6 mi |
|
Laterals |
0.9 mi |
|
Storage Facilities
Newton Dam
Carriage Facilities
Main Canal
|
Location |
Generally south from Newton Dam along west side of Clarkston Creek. |
|
Construction period |
1946-1947 |
|
Length |
0.6 mi |
|
Diversion capacity |
24.7 cfs |
|
Typical section concrete lined: |
|
|
Bottom width |
3.9 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
1.8 ft |
|
East Canal
|
Location |
From the end of Main Canal generally south to a point about 1 mile east of Newton, Utah. |
|
Construction period |
1946-1947 |
|
Length |
2 mi |
|
Diversion capacity |
9 cfs |
|
Typical section in earth: |
|
|
Bottom width |
3 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
1 ft |
|
Highline Canal
|
Location |
From end of Main Canal generally southwest to a point about 1.5 miles west of Newton, Utah. |
|
Construction period |
1946-1947 |
|
Length |
4 mi |
|
Diversion capacity |
17.7 cfs |
|
Typical section concrete lined: |
|
|
Bottom width |
3 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
1 ft |
|
|