Navajo Indian Irrigation Project - Main Page
Facilities in Operation
Storage Facilities
Cutter Dam - Owned and Operated by the Bureau of Indian Affairs Navajo Dam
Diversion Facilities
Navajo Dam Diversion Works - Main Canal Headworks
Carriage Facilities
Main Canal
|
Location |
Originates at Navajo Dam and terminates at the west fork of Gallegos Canyon. |
|
Construction period |
1967-1977 |
|
Length |
46.30 mi |
|
Lined open canal |
25.75 mi |
|
Unlined open canal |
0.60 mi |
|
Tunnels |
11.51 mi |
|
Siphons |
7.35 mi |
|
Flume |
0.09 mi |
|
Cutter Reservoir |
0.90 mi |
|
Capacity |
1,800 cfs |
|
Tunnel No. 1 - Mile Post 0.00-2.01
|
Type |
Comcrete circular section |
|
Year completed |
1967 |
|
Length |
2.01 mi |
|
Inside diameter |
18 ft |
|
Method of construction |
Hughes boring machine |
|
Capacity |
1,800 cfs |
|
Flume - Mile Post 2.01-2.10
|
Type |
Reinforced concrete |
|
Year completed |
1967 |
|
Length |
0.09 mi |
|
Typical section |
|
|
Width |
35.0 ft |
|
Height |
9.0 ft |
|
Water depth |
6.91 ft |
|
Capacity |
1,800 cfs |
|
Gobernador Siphon - Mile Post 2.10-2.40
|
Type |
Monolithic concrete section |
|
Year completed |
1969 |
|
Length of siphon barrel |
0.30 mi |
|
Inside diameter |
17.5 ft |
|
Thickness of pipe |
19 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 2.40-2.50
|
Type |
Trapezoidal section |
|
Year completed |
1969 |
|
Length |
0.10 mi |
|
Typical section |
|
|
Bottom width |
23 ft |
|
Height to top of lining |
13.70 ft |
|
Height to O&M road |
15.75 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
11.81 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.5 in |
|
O&M roads |
2 |
|
Width |
20 ft |
|
Slope |
0.0001 |
|
Capacity |
1,800 cfs |
|
Tunnel No. 2 - Mile Post 2.50-7.40
|
Type |
Concrete horseshoe section |
|
Year completed |
1968 |
|
Length |
4.90 mi |
|
Inside diameter |
17.5 ft |
|
Method of construction |
Conventional |
|
Capacity |
1,800 cfs |
|
Unlined Canal Section - Mile Post 7.40-8.00
|
Type |
Trapezoidal section |
|
Year completed |
1968 |
|
Length |
0.60 mi |
|
Typical section |
|
|
Bottom width |
20 ft |
|
Side slopes |
1.25:1 and 1.5:1 |
|
Water depth |
14.85 ft |
|
Slope |
0.00023 and 0.00019 |
|
Capacity |
1,800 cfs |
|
Cutter Dam and Reservoir - Mile Post 8.00-8.90
|
Type |
Earth and rockfill dam |
|
Year completed |
1972 |
|
Length of reservoir |
0.90 mi |
|
Diversion capacity |
1,800 cfs |
|
M. P. 8.9 Siphon - Mile Post 8.90-9.40
|
Type |
Monolithic concrete section |
|
Year completed |
1969 |
|
Length of siphon |
0.50 mi |
|
Inside diameter |
17.5 ft |
|
Thickness of pipe wall |
19 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 9.40-10.60
|
Type |
Trapezoidal section |
|
Year completed |
1969 |
|
Length |
1.20 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Largo Siphon - Mile Post 10.60-12.25
|
Type |
Monolithic concrete section |
|
Year completed |
1969 |
|
Length |
1.65 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Length without steel liner |
793.5 ft |
|
Length with steel liner |
7,428.5 ft |
|
Thickness of pipe wall |
19 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 12.25-13.60
|
Type |
Trapezoidal section |
|
Year completed |
|
|
Mile Post 12.25-13.40 |
1969 |
|
Mile Post 13.40-13.60 |
1974 |
|
Length |
1.35 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Tunnel No. 3 - Mile Post 13.60-16.60
|
Type |
Concrete circular section |
|
Year completed |
1974 |
|
Length |
3.00 mi |
|
Inside diameter |
18.0 ft |
|
Method of construction |
Dresser boring machine |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 16.60-16.70
|
Type |
Trapezoidal section |
|
Year completed |
1974 |
|
Length |
0.10 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
M. P. 16.7 Siphon - Mile Post 16.70-16.80
|
Type |
Monolithic concrete section |
|
Year completed |
1971 |
|
Length |
0.10 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
19 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 16.80-17.90
|
Type |
Trapezoidal section |
|
Year completed |
1971 |
|
Length |
1.10 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
M. P. 17.9 Siphon - Mile Post 17.90-18.00
|
Type |
Monolithic concrete section |
|
Year completed |
1971 |
|
Length |
0.10 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
19 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 18.00-18.60
|
Type |
Trapezoidal section |
|
Year completed |
1971 |
|
Length |
0.60 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Tunnel No. 3A - Mile Post 18.90-19.20
|
Type |
Concrete circular section |
|
Year completed |
1971 |
|
Length |
0.60 mi |
|
Inside diameter |
18.0 ft |
|
Method of construction |
Dresser boring machine |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 19.20-20.20
|
Type |
Trapezoidal section |
|
Year completed |
1971 |
|
Length |
1.00 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Armenta Siphon - Mile Post 20.20-20.90
|
Type |
Cylinder prestressed concrete pipe |
|
Year conpleted |
1975 |
|
Length |
0.70 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
|
|
Maximum |
18.75 in |
|
Minimum |
14.50 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 20.90-23.10
|
Type |
Trapezoidal section |
|
Year completed |
1975 |
|
Length |
2.20 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Tunnel No. 4 - Mile Post 23.10-24.10
|
Type |
Concrete horseshoe section |
|
Year completed |
1975 |
|
Length |
1.00 mi |
|
Inside diameter |
17.5 ft |
|
Method of construction |
Conventional |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 24.10-26.40
|
Type |
Trapezoidal section |
|
Year completed |
1975 |
|
Length |
2.30 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
Kutz Siphon - Mile Post 26.40-27.60
|
Type |
Cylinder prestressed concrete pipe |
|
Year completed |
1975 |
|
Length |
1.20 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
|
|
Maximum |
18.75 in |
|
Minimum |
14.50 in |
|
Capacity |
1,800 cfs |
|
Lined Canal Section No. 1 - Mile Post 27.60-29.40
|
Type |
Trapezoidal section |
|
Year completed |
1975 |
|
Length |
1.80 mi |
|
Typical section |
See Section No. 1 above |
|
Capacity |
1,800 cfs |
|
West Kutz Siphon - Mile Post 29.40-30.10
|
Type |
Cylinder prestressed concrete pipe |
|
Year completed |
1975 |
|
Length |
0.70 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
|
|
Maximum |
18.75 in |
|
Minimum |
14.50 in |
|
Capacity |
1,625 cfs |
|
Lined Canal Section No. 2 - Mile Post 30.10-30.70
|
Type |
Trapezoidal section |
|
Year completed |
1975 |
|
Length |
0.60 mi |
|
Typical section |
|
|
Bottom width |
21 ft |
|
Height to top of lining |
13.5 ft |
|
Height to O&M road |
15.5 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
11.58 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.5 in |
|
O&M roads |
2 |
|
Width |
20 ft |
|
Slope |
0.0001 |
|
Capacity |
1,625 cfs |
|
State Highway 44 Crossing Tunnel - Mile Post 30.70-30.80
|
Type |
Concrete circular section |
|
Year completed |
1975 |
|
Length |
0.10 mi |
|
Inside diameter |
18.0 ft |
|
Method of construction |
Conventional |
|
Capacity |
1,625 cfs |
|
Lined Canal Section No. 2 - Mile Post 30.80-31.40
|
Type |
Trapezoidal section |
|
Year completed |
1975 |
|
Length |
0.60 mi |
|
Typical section |
See Section No. 2 above |
|
Capacity |
1,625 cfs |
|
Horn Siphon - Mile Post 31.40-31.90
|
Type |
Cylinder prestressed concrete pipe |
|
Year completed |
1975 |
|
Length |
0.50 mi |
|
Inside diameter of pipe |
17.5 ft |
|
Thickness of pipe wall |
|
|
Maximum |
18.75 in |
|
Minimum |
14.50 in |
|
Capacity |
1,625 cfs |
|
Lined Canal Section No. 2 - Mile Post 31.90-36.30
|
Type |
Trapezoidal section |
|
Year completed |
|
|
M. P. 31.9-32.8 |
1975 |
|
M. P. 32.8-36.3 |
1976 |
|
Length |
4.40 mi |
|
Typical section |
See Section No. 2 above |
|
O&M roads |
2 |
|
Width |
|
|
M. P. 31.9-33.1 |
20 ft |
|
M.P. 33.1-36.3 |
16 ft |
|
Capacity |
1,625 cfs |
|
Lined Canal Section No. 3 - Mile Post 36.30-42.50
|
Type |
Trapezoidal section |
|
Year completed |
1976 |
|
Length |
6.20 mi |
|
Typical section |
|
|
Bottom width |
20 ft |
|
Height to top of lining |
13.25 ft |
|
Height to O&M road |
15.20 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
11.31 ft |
|
Type of lining |
Concrete |
|
Thickness of lining |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
1,500 cfs |
|
East Gallegos Siphon - Mile Post 42.50-43.60
|
Type |
Cylinder prestressed or monolithtc concrete pipe |
|
Year completed |
1977 |
|
Length |
1.10 mi |
|
Inside diameter of pipe |
15.75 ft |
|
Capacity |
1,355 cfs |
|
Lined Canal Section No. 4 - Mile Post 43.60-45.80
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
2.20 mi |
|
Typical section |
|
|
Bottom width |
18.0 ft |
|
Height to top of lining |
13.00 ft |
|
Height to O&M road |
15.00 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
11.15 ft |
|
Type of lining |
Concrete |
|
Thickness of lining |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
1,355 cfs |
|
West Gallegos Siphon - Mile Post 45.80-46.20
|
Type |
Cylinder prestressed or monolithic concrete pipe |
|
Year completed |
1977 |
|
Length |
0.40 mi |
|
Inside diameter of pipe |
15.75 ft |
|
Capacity |
1,285 cfs |
|
Lined Canal Section No. 5 - Mile Post 46.20-46.30
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
0.10 mi |
|
Typical section |
|
|
Bottom width |
18.0 ft |
|
Height to top of lining |
12.50 ft |
|
Height to O&M road |
14.50 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
10.86 ft |
|
Type of lining |
Concrete |
|
Thickness of lining |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.0 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
1,285 cfs |
|
Gravity Main Canal
|
Location |
Begins at West Fork of Gallegos Canyon and terminates at Block 2 |
|
Construction period |
1976-1977 |
|
Length |
14.5 mi |
|
Concrete lined open canal |
12.5 mi |
|
Tunnel |
1.4 mi |
|
Siphons |
0.3 mi |
|
Diversion capacity |
1,285 cfs |
|
Lined Canal Section No. 1 - Mile Post 0.00-0.70
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
0.70 mi |
|
Typical section |
|
|
Bottom width |
18.0 ft |
|
Height to top of lining |
12.50 ft |
|
Height to O&M roads |
14.50 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
10.86 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.0 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
1,285 cfs |
|
Lined Canal Section No. 2 - Mile Post 0.70-5.40
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
4.70 mi |
|
Typical section |
|
|
Bottom width |
12.0 ft |
|
Height to top of lining |
10.50 ft |
|
Height to O&M roads |
12.20 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
8.94 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.0 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
670 cfs |
|
State Highway 371 Siphon - Mile Post 5.40-5.50
|
Type |
Reinforced concrete box |
|
Year completed |
1977 |
|
Length |
0.10 mi |
|
Inside size |
11 ft by 11 ft |
|
Capacity |
670 cfs |
|
Lined Canal Section No. 2 - Mile Post 5.50-7.20
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
1.70 mi |
|
Typical section |
See Section No. 2 above |
|
Capacity |
670 cfs |
|
Tunnel No. 5 - Mile Post 7.20-8.60
|
Type |
Concrete circular section |
|
Year completed |
1977 |
|
Length |
1.40 mi |
|
Inside diameter |
10.5 ft |
|
Method of construction |
Scott boring machine |
|
Capacity |
610 cfs |
|
Lined Canal Section No. 3 - Mile Post 8.60-9.60
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
1.00 mi |
|
Typical section |
|
|
Bottom width |
10.0 ft |
|
Height to top of lining |
10.25 ft |
|
Height to O&M roads |
12.10 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
8.98 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
4.0 in |
|
Reinforced |
3.0 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
610 cfs |
|
Lined Canal Section No. 4 - Mile Post 9.60-11.60
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
2.00 mi |
|
Typical section |
|
|
Bottom width |
7.0 ft |
|
Height to top of lining |
7.00 ft |
|
Height to O&M roads |
8.40 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5.96 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
225 cfs |
|
Road 4060 Siphon - Mile Post 11.60-11.70
|
Type |
Reinforced concrete box |
|
Year completed |
1977 |
|
Length |
0.10 mi |
|
Inside size |
7 ft by 7 ft |
|
Capacity |
225 cfs |
|
Lined Canal Section No. 4 - Mile Post 11.70-13.40
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
1.70 mi |
|
Typical section |
See Section No. 4 above |
|
Capacity |
225 cfs |
|
Highway No. 3003 Siphon - Mile Post 13.40-13.50
|
Type |
Reinforced concrete box |
|
Year completed |
1977 |
|
Length |
0.10 mi |
|
Inside size |
7 ft by 7 ft |
|
Capacity |
225 cfs |
|
Lined Canal Section No. 4 - Mile Post 13.50-14.20
|
Type |
Trapezoidal section |
|
Year completed |
1977 |
|
Length |
0.70 mi |
|
Typical section |
See Section No. 4 above |
|
Capacity |
225 cfs |
|
Amarillo Canal
|
Location |
Branches off the Gravity Main Canal at Amarillo Canyon and terminates in Block 3. |
|
Construction period |
1977-1978 |
|
Length |
11.4 mi |
|
Lined open canals |
11.3 mi |
|
Siphon |
0.10 mi |
|
Diversion capacity |
610 cfs |
|
Lined Canal Section No. 1 - Mile Post 0.00
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
0.10 mi |
|
Typical section |
|
|
Bottom width |
10.0 ft |
|
Height to top of lining |
10.25 ft |
|
Height to O&M roads |
12.10 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
8.98 ft |
|
Type of lining |
Concrete |
|
Thickness of lining, reinforced |
4 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
610 cfs |
|
Highway 371 Siphon - Mile Post 0.00-0.10
|
Type |
Reinforced concrete box |
|
Year completed |
1978 |
|
Length |
0.10 mi |
|
Inside size |
8.5 ft by 6 ft |
|
Capacity |
390 cfs |
|
Lined Canal Section No. 2 - Mile Post 0.10-0.90
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
0.80 mi |
|
Typical section |
|
|
Bottom width |
8.0 ft |
|
Height to top of lining |
8.80 ft |
|
Height to O&M roads |
10.50 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
7.70 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
390 cfs |
|
Lined Canal Section No. 3 - Mile Post 0.90-4.70
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
3.80 mi |
|
Typical section |
|
|
Bottom width |
8.0 ft |
|
Height to top of lining |
8.10 ft |
|
Height to O&M roads |
9.70 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
7.05 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
345 cfs |
|
Lined Canal Section No. 4 - Mile Post 4.70-7.70
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
3.00 mi |
|
Typical section |
|
|
Bottom width |
6.0 ft |
|
Height to top of lining |
6.60 ft |
|
Height to O&M roads |
8.10 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5.72 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
190 cfs |
|
Lined Canal Section No. 4A - Mile Post 7.70-8.30
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
0.60 mi |
|
Typical section |
|
|
Bottom width |
10.5 ft |
|
Height to top of lining |
6.60 ft |
|
Height to O&M roads |
8.10 ft |
|
Side slopes |
2:1 |
|
Water depth |
5.72 ft |
|
Type of lining |
10 mil Plastic membrane (polyethylene) |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0001 |
|
Capacity |
190 cfs |
|
Lined Canal Section No. 5 - Mile Post 8.30-10.80
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
2.50 mi |
|
Typical section |
|
|
Bottom width |
5.0 ft |
|
Height to top of lining |
5.25 ft |
|
Height to O&M roads |
6.70 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
4.40 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.0003 |
|
Capacity |
170 cfs |
|
Lined Canal Section No. 5A - Mile Post 10.80-11.40
|
Type |
Trapezoidal section |
|
Year completed |
1978 |
|
Length |
0.60 mi |
|
Typical section |
|
|
Bottom width |
10.75 ft |
|
Height to top of lining |
5.25 ft |
|
Height to O&M roads |
6.70 ft |
|
Side slopes |
2:1 |
|
Water depth |
4.40 ft |
|
Type of lining |
10 mil Plastic membrane (polyvinyl chloride) |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
0.00025 |
|
Capacity |
170 cfs |
|
Burnham Lateral West
|
Location |
Begins at Gallegos Pumping Plant at the Main Canal at West Gallegos Canyon and terminates in Block 11. |
|
Construction period |
1982-1994 |
|
Length |
3.70 mi |
|
Typical section in concrete: |
|
|
Bottom width |
14 ft |
|
Height to top of lining |
9.75 ft |
|
Height to O&M roads |
10.50 ft |
|
Side slopes |
2:1 |
|
Water depth |
9.85 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
Flat |
|
Capacity |
320 cfs |
|
Coury Lateral
|
Location |
Begins at Kutz Pumping Plant on the Main Canal and ends in Block 5. |
|
Construction period |
1979-1982 |
|
Length |
4.1 mi |
|
Typical section |
|
|
Bottom width |
6.0 ft |
|
Height to top of lining |
7.60 ft |
|
Height to O&M roads |
9.10 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5.80 ft |
|
Type of lining |
Concrete |
|
Lining thickness |
|
|
Unreinforced |
3.5 in |
|
Reinforced |
2.5 in |
|
O&M roads |
2 |
|
Width |
16 ft |
|
Slope |
Flat |
|
Capacity |
200 cfs |
|
Irrigation Distribution System
Block 1 Facilities
|
Date completed |
1976 |
|
Pipeline, 6 to 36 inch pipe diameter |
19.5 mi |
|
Multi-unit pumping plants, natural gas powered |
5 |
|
Single-unit pumping plants, natural gas powered |
11 |
|
Required installed horsepower |
3,700 |
|
Elevated tanks |
5 |
|
33.3R |
|
|
Capacity |
30,000 gal |
|
Height |
159 ft |
|
34.9R |
|
|
Capacity |
30,000 gal |
|
Height |
74 ft |
|
36.3R |
|
|
Capacity |
50,000 gal |
|
Height |
159 ft |
|
38.8R |
|
|
Capacity |
100,000 gal |
|
Height |
100 ft |
|
40.3R |
|
|
|
|