|
CUP - Jensen Unit - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Aqueducts |
11.70 mi |
|
Pumping Plants |
1 |
|
Drains |
6.17 mi |
|
Transmission Lines |
2.30 mi |
|
Storage Facilities
Red Fleet Dam
Carriage Facilities
Tyzack Aqueduct - Reach 1 and Reach 2
|
Type: |
Pre-tensioned concrete cylinder pipe |
|
Location |
Aqueduct begins at Red Fleet Reservoir and carries water to Vernal City and Jensen Water District. |
|
Construction period |
1983 |
|
Length |
11.7 mi |
|
Diversion capacity |
46 cfs |
|
Diameter of Pipe |
27-36 in |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
UWCD |
5 |
45 |
605 |
4,950 |
|
Drains
|
J1: Main Trunk Line |
9,101 ft |
|
J1A: Main Trunk Line |
2,986 ft |
|
J2: Main Trunk Line |
6,602 ft |
|
J3: Main Trunk Line |
1,815 ft |
|
J4: Main Trunk Line |
6,737 ft |
|
J1-1.0 Left: a lateral of J1 |
2,700 ft |
|
J1-1.4 Right: a lateral of J1 |
911 ft |
|
J4-0.74Right: a lateral of J4 |
1,738 ft |
|
|