Emery County Project - Main Page
Facilities in Operation
|
Storage Dams |
2 |
|
Diversion Dams |
1 |
|
Canals |
20.5 mi |
|
Storage Facilities
Huntington North Dam Joes Valley Dam
Diversion Facilities
Swasey Diversion Dam
|
Type: |
Concrete ogee weir, embankment wings |
|
Location |
10 miles downstream from Joes Valley Dam on Cottonwood Creek. |
|
Year Completed |
1965 |
|
Dimensions: |
|
|
Structural height |
11 ft |
|
Weir crest length |
75 ft |
|
Volume |
9,000 yd3 |
|
Diversion capacity |
165 cfs |
|
Carriage Facilities
Cottonwood Creek-Huntington Canal
|
Type |
Concrete lined canal |
|
Location |
Heads at Swasey Diversion Dam, extends northward to vicinity of Huntington, terminating at the North Ditch |
|
Construction period |
1963-1965 |
|
Length |
16.7 mi |
|
Initial diversion capacity |
165 cfs |
|
Typical maximum section: |
|
|
Bottom width |
12 ft |
|
Side slopes |
2:1 |
|
Water depth |
4 ft |
|
Huntington North Reservoir Feeder Canal
|
Type |
Concrete lined canal |
|
Location |
Heads at North Ditch, extends southward to Huntington North Reservoir. |
|
Construction period |
1965-1966 |
|
Length |
0.3 mi |
|
Initial diversion capacity |
100 cfs |
|
Typical maximum section: |
|
|
Bottom width |
8 ft |
|
Side slopes |
2:1 |
|
Water depth |
3.4 ft |
|
Huntington North Service Canal
|
Type |
Concrete lined canal |
|
Location |
Heads at outlet works of Huntington North Reservoir; meanders eastward to terminus at south branch of Cleveland Canal. |
|
Construction period |
1965-1966 |
|
Length |
3.5 mi |
|
Initial diversion capacity |
35 cfs |
|
Typical maximum section: |
|
|
Bottom width |
6 ft |
|
Side slopes |
2:1 |
|
Water depth |
6 ft |
|
|