Umatilla Project - Main Page
Facilities in Operation
|
Storage Dams |
2 |
|
Diversion Dams |
3 |
|
Canals |
137 mi |
|
Laterals |
106 mi |
|
Pumping Plants |
5 |
|
Drains |
14 mi |
|
Storage Facilities
Cold Springs Dam McKay Dam
Diversion Facilities
Feed Canal Diversion Dam
|
Type: |
Concrete, rock, and timber weir with embankment wing |
|
Location |
On the Umatilla River, 1.5 miles southeast of Echo, Oregon. |
|
Year Completed |
1907 |
|
Dimensions: |
|
|
Structural height |
8 ft |
|
Hydraulic height |
4 ft |
|
Crest length |
2,100 ft |
|
Crest elevation |
656.0 ft |
|
Volume |
14,100 yd3 |
|
Diversion capacity |
350 cfs |
|
Maxwell Diversion Dam
|
Type: |
Concrete and timber-crib weir with embankment wing |
|
Location |
On the Umatilla River, 1 mile west of Hinkle, Oregon. |
|
Year Completed |
1912 |
|
Dimensions: |
|
|
Structural height |
14 ft |
|
Hydraulic height |
4 ft |
|
Crest length |
400 ft |
|
Crest elevation |
529.0 ft |
|
Volume |
500 yd3 |
|
Diversion capacity |
140 cfs |
|
Three Mile Falls Diversion Dam
|
Type: |
Concrete multiple arch weir |
|
Location |
On the Umatilla River, 3 miles south of Umatilla, Oregon. |
|
Year Completed |
1914 |
|
Dimensions: |
|
|
Structural height |
24 ft |
|
Hydraulic height |
23 ft |
|
Crest length |
915 ft |
|
Crest elevation |
404.3 ft |
|
Volume |
5,100 yd3 |
|
Diversion capacity |
375 cfs |
|
Carriage Facilities
Feed Canal
|
Location |
From Feed Canal Diversion Dam generally northwest along the Umatilla River about 8 miles, then northeast to Cold Springs Reservoir. |
|
Construction period |
1906-1907. Enlarged 1913-1917 |
|
Length |
25 mi |
|
Diversion capacity |
350 cfs |
|
Typical section in earth: |
|
|
Bottom width |
23 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
5.5 ft |
|
West Extension Main Canal
|
Location |
From Three Mile Falls Diversion Dam generally west about 20 miles along the Columbia River. |
|
Construction period |
1913-1916 |
|
Length |
27 mi |
|
Diversion capacity |
140 cfs |
|
Maxwell Canal
|
Location |
From Umatilla River northeast to vicinity of Cold Springs Reservoir. |
|
Construction period |
Non-Reclamation construction. Enlarged in 1917 by Bureau of Reclamation. |
|
Length |
10 mi |
|
Diversion capacity |
140 cfs |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
River |
3 |
60 |
145 |
1,800 |
|
Columbia River |
6 |
282 |
335 |
12,000 |
|
Cold Springs |
6 |
158 |
63 |
1,500 |
|
Stanfield |
4 |
79 |
61 |
800 |
|
West Extension Irrigation District |
5 |
147 |
97 |
2,400 |
|
|