Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Rogue River Basin Project 
 Engineering Data

Rogue River Basin Project  -  Main Page

Facilities in Operation

Storage Dams

7      

Diversion Dams

20      

Canals

250 mi  

Laterals

197 mi  

Powerplants

1      


Storage Facilities

Diversion Facilities

Antelope Creek Diversion Dam

Type:

Stream drop inlet

Location

On Antelope Creek, about 12 miles northeast of Medford, Oregon.

Construction period

1966  

Dimensions:

 

   Height above streambed

7 ft  

   Crest length

104 ft  

   Crest elevation

1,524.0 ft  

   Volume

1,000 yd3  

   Diversion capacity

50 cfs  


Ashland Lateral Diversion Dam

Type:

Concrete ogee weir, earth dike

Location

On Emigrant Creek, 8 miles southeast of Ashland, Oregon.

Construction period

1966  

Dimensions:

 

   Height above streambed

5 ft  

   Weir crest length

74 ft  

   Crest elevation

2,410.5 ft  

   Volume (concrete)

500 yd3  

   Volume (total)

2,600 yd3  

   Overflow weir capacity

4,000 cfs  

Sluiceway:

One 10- by 9-ft radial gate.

Headworks:

Concrete structure controlled by one 72- by 48-in slide gate.

   Diversion capacity

48 cfs  


Beaver Dam Creek Diversion Dam

Type:

Rockfill, concrete core wall

Location

On Beaver Dam Creek near Ashland, Oregon.

Construction period

1960  

Dimensions:

 

   Height above streambed

4 ft  

   Weir crest length

75 ft  

   Crest length

168 ft  

   Crest elevation

4,670.5 ft  

   Volume

1,100 yd3  

   Overflow weir capacity

1,500 cfs  

Headworks:

Concrete structure with one 4- by 3-ft slide gate.

   Diversion capacity

65 cfs  


Conde Creek Diversion Dam

Type:

Concrete and rockfill weir

Location

On Conde Creek about 5 miles northeast of Ashland, Oregon.

Construction period

1958  

Dimensions:

 

   Height above streambed

4 ft  

   Weir crest length

109 ft  

   Crest length

109 ft  

   Crest elevation

4,567.4 ft  

   Volume

950 yd3  

Spillway:

Overflow weir

   Capacity at 4,570.0 ft

750 ft³/s  

Headworks

Controlled by 30-in slide gate.

   Diversion capacity

25 cfs  


Daley Creek Diversion Dam

Type:

Rockfill, timber core wall

Location

On Daley Creek near Ashland, Oregon.

Construction period

1960  

Dimensions:

 

   Height above streambed

4 ft  

   Weir crest length

30 ft  

   Crest length

112 ft  

   Crest elevation

4,692.5 ft  

   Volume

1,300 yd3  

   Overflow weir capacity

540 cfs  

Headworks:

Concrete structure with one 3- by 2-ft slide gate.

   Capacity

25 cfs  


Dead Indian Diversion Dam

Type:

Concrete and rockfill weir

Location

On Dead Indian Creek about 4 miles east of Ashland, Oregon.

Construction period

1958  

Dimensions:

 

   Height above streambed

4 ft  

   Crest length

131 ft  

   Crest elevation

4,538.0 ft  

   Volume

1,560 yd3  

Spillway:

Overflow weir

   Capacity at 4,541.0 ft

1,100 cfs  

Headworks:

Dead Indian Canal

   Diversion capacity

86 cfs  


Little Beaver Creek Diversion Dam

Type:

Concrete core wall and rockfill

Location

On Little Beaver Creek about 4 miles east of Lincoln, Oregon.

Construction period

1959  

Dimensions:

 

   Height above streambed

9 ft  

   Crest length

80 ft  

   Crest elevation

4,433.0 ft  

   Volume

1,300 yd3  

Spillway:

Overflow weir

Headworks:

Little Beaver Creek Feeder Canal

   Capacity at 4,438.8 ft

24 cfs  


Oak Street Diversion Dam

Type:

Concrete weir, stoplogged crest

Location

On Bear Creek just north of Ashland, Oregon.

Construction period

1961  

Dimensions:

 

   Height above streambed

5 ft  

   Crest length

133 ft  

   Crest elevation

1,711.0 ft  

   Volume

3,000 yd3  

   Diversion capacity

75 cfs  


Phoenix Canal Diversion Dam

Type:

Concrete weir, stoplogged crest

Location

On Bear Creek near Ashland, Oregon.

Construction period

1960  

Dimensions:

 

   Height above streambed

5 ft  

   Weir crest length

119 ft  

   Crest length

180 ft  

   Crest elevation

1,548.0 ft  

   Volume (concrete)

250 yd3  

   Volume (total)

1,520 yd3  

   Overflow weir capacity

7,560 cfs  

Headworks:

Concrete with two 48- by 42-in control gates.

   Diversion capacity

102 cfs  


Soda Creek Diversion Dam

Type:

Earthfill

Location

On Soda Creek, 6 miles east of Lincoln, Oregon.

Construction period

1959  

Dimensions:

 

   Height above streambed

13 ft  

   Crest length

430 ft  

   Crest elevation

4,478.0 ft  

   Volume

10,250 yd3  

Spillway:

Overflow weir

   Crest elevation

4,473.5 ft  

   Capacity at 4,475 ft

280 cfs  

Headworks:

Soda Creek Canal

   Capacity

11 cfs  


South Fork Little Butte Creek Diversion Dam

Type:

Rockfill, timber core wall

Location

On South Fork of Little Butte Creek near Ashland, Oregon.

Construction period

1960  

Dimensions:

 

   Height above streambed

4 ft  

   Weir crest length

100 ft  

   Crest length

400 ft  

   Crest elevation

4,681.5 ft  

   Volume

4,650 yd3  

   Overflow weir capacity

1,950 cfs  

Headworks:

Concrete structure with one 4- by 3-ft slide gate.

   Diversion capacity

65 cfs  


Carriage Facilities

Main Canal

Location

From North and South Forks of Little Butte Creek 17 miles northeast of Medford, Oregon, westerly to Bradshaw Drop, 11 miles northeast of Medford.

Construction period

Non-Reclamation construction. Replacement of eight existing flumes with bench flumes and concrete siphons by Reclamation.

Length

17 mi  

Diversion capacity

175 cfs  


Hopkins Canal

Location

From Bradshaw Drop on Main Canal about 11 miles northeast of Medford, Oregon, generally northwest to a point 2.5 miles northwest of Central Point, Oregon.

Construction period

Non-Reclamation construction. Replacement of two flumes with concrete siphons by Reclamation.

Length

28.5 mi  

Diversion capacity

50 cfs  


Medford Canal

Location

From Bradshaw Drop on Main Canal about 11 miles northeast of Medford, Oregon, generally southwest to a point about 1 mile south of Phoenix, Oregon, where it crosses under Bear Creek and is fed into the Phoenix Canal.

Construction period

Non-Reclamation construction. Replacement of two wooden siphons and one flume with concrete siphons by Reclamation.

Length

25 mi  

Diversion capacity

125 cfs  


Phoenix Canal

Location

From 1 mile south of Phoenix, Oregon, generally northwest to a point about 3.5 miles west of Central Point, Oregon.

Construction period

Non-Reclamation construction. Enlarged and improved by Reclamation as part of Talent Division construction

Length

18.1 mi  

Diversion capacity

102 cfs  


Howard Prairie Delivery Canal

Location

From Howard Prairie Dam, south and west to near Pinehurst, Oregon.

Construction period

1956-1959  

Length

18.7 mi  

Diversion capacity

60 cfs  

Typical section, concrete lined:

 

   Bottom width

6 ft  

   Side slopes

1.5:1  

   Water depth

3 ft  


South Fork Collection Canal

Location

About 25 miles east of Medford, Oregon.

Construction period

1958-1959  

Length

12.7 mi  

Diversion capacity

65 cfs  

Typical section in earth or rock

 

   Bottom width

6 ft  

   Side slopes:

 

     Unlined

1.5:1  

     Earth lined

2:1  

    Water depth

3.4 ft  


Daley Creek Collection Canal

Location

About 25 miles east of Medford, Oregon.

Construction period

1958-1960  

Length:

 

   At 25 ft³/s

2.7 mi  

   At 65 ft³/s

1.6 mi  

Diversion capacity

25 and 65 cfs  

Typical section in earth or rock:

 

   Bottom width

4 ft  

   Side slopes:

 

     Unlined

1.5:1  

     Earth lined

2:1  

   Water depth

2 ft  


Ashland Lateral1

Location

From Emigrant Creek below Green Springs Powerplant 8 miles southeast of Ashland, Oregon, northwesterly to city limits of Ashland.

Construction period

Non-Reclamation construction in about 1923, diverting from Sampson Creek. Enlarged, improved, and extended 3.2 miles up Emigrant Creek by Reclamation as part of Talent Division construction.

Length

16.9 mi  

Diversion capacity

48 cfs  


East Lateral1

Location

From Emigrant Reservoir about 4 miles southeast of Ashland, Oregon. Extends northwesterly on east side of Bear Creek for 11 miles to bifurcation structure for West Lateral, continues northwesterly for another 14 miles.

Construction period

Non-Reclamation construction in about 1925. Enlarged, improved, and extended by Reclamation at part of Talent Division construction.

Length

25 mi  

Diversion capacity

132 cfs  


West Lateral1

Location

From mile 11 of East Lateral about 1 miles north of Ashland, crosses Bear Creek in a steel-pipe siphon 6,730 ft long, continuing northwesterly on west side of Bear Creek for about 23 miles.

Construction period

Non-Reclamation construction in about 1925. Siphon replaced in 1944. Enlarged, improved, and extended 8.4 miles by Reclamation as part of Talent Division construction.

Length

23.2 mi  

Diversion capacity

39 cfs  


Talent Lateral1

Location

From Bear Creek about 0.5 miles north of Ashland, extending northwesterly on east side of Bear Creek to 1,640-ft siphon across the creek, continuing northwesterly about 17 miles to 1.5 miles southeast of Jacksonville, Oregon.

Construction period

Non-Reclamation construction sometime prior to 1925. Enlarged and improved by Reclamation as part of Talent Division construction.

Length (excludes Lower East Lateral)

19.4 mi  

Diversion capacity

65 cfs  

    1 Local usage designates canals diverting from Emigrant Reservoir or Bear Creek as Laterals.


Deadwood Tunnel

Location

About 24 miles east of Medford, Oregon.

Construction period

1956-1958  

Lining:

Concrete

Section:

Horseshoe

Diameter

6 ft  

Length

3,553 ft  

Capacity

130 cfs  


Billings Siphon

Location

From a point on East Lateral to a point on West Lateral near Ashland, Oregon.

Construction period

1959  

Diameter

30 in  

Length

1.27 mi  

Capacity

38.7 cfs  


Green Springs Power Conduit

Location

From Keene Creek Dam west to the beginning of the Green Springs Powerplant penstock.

Construction period

1957-1959  

Pressure pipe:

 

Diameter

60 in  

Length

4,154 ft  

Cascade Divide Tunnel:

 

   Diameter

6 ft  

   Lining:

Concrete

   Length

2,100 ft  

Green Springs Tunnel:

 

   Diameter

6 ft  

   Lining:

Concrete

   Length

4,833 ft  


Power Facilities

 

 