Owyhee Project - Main Page
Facilities in Operation
|
Storage Dams |
1 |
|
Canals |
172 mi |
|
Laterals |
543 mi |
|
Pumping Plants |
9 |
|
Drains |
227 mi |
|
Transmission Lines |
19.4 mi |
|
Substations |
7 |
|
Storage Facilities
Owyhee Dam
Carriage Facilities
North Canal
|
Location |
From Lake Owyhee north about 65 miles to the Snake River across from Weiser, Idaho. |
|
Construction period |
1930-1936 |
|
Total length |
61.5 mi |
|
Diversion capacity |
1,190 cfs |
|
Typical section in earth: |
|
|
Bottom width |
24 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
10.9 ft |
|
Typical section, concrete lined: |
|
|
Bottom width |
10.2 ft |
|
Side slopes |
1.25:1 |
|
Water depth |
10 ft |
|
Lining thickness |
4 in |
|
North Canal Tunnel No. 1
|
Location |
From Lake Owyhee near the dam, 3.5 miles northeast to Tunnel Canyon. |
|
Construction period |
1930-1932 |
|
Length |
3.5 mi |
|
Capacity |
1,840 cfs |
|
Diameter |
16.58 ft |
|
Cross section: |
Horseshoe |
|
Concrete lining |
8-16 in |
|
Malheur River Siphon - North Canal
|
Location |
In the valley of the Malheur River near Ontario, Oregon. |
|
Construction period |
1935 |
|
Length |
4.3 mi |
|
Capacity |
325 cfs |
|
Diameter (inside) |
6.67 ft |
|
Maximum head |
283 ft |
|
Material: |
Plate steel |
|
South Canal
|
Location |
From the end of North Canal Tunnel No.1 to Snake River opposite Marsing, Idaho. |
|
Construction period |
1930-1936 |
|
Total length |
37 mi |
|
Diversion capacity |
490 cfs |
|
Typical section in earth: |
|
|
Bottom width |
16 ft |
|
Side slopes |
1.5:1 |
|
Water depth |
7 ft |
|
South Canal Tunnel No. 5
|
Location |
From the end of North Canal Tunnel No. 1, southeast. |
|
Construction period |
1930-1932 |
|
Length |
4.2 mi |
|
Capacity |
650 cfs |
|
Diameter: |
|
|
Horseshoe section |
9.25 ft |
|
Circular section |
9.5 ft |
|
Lining |
6-10 in |
|
Pumping Plants
|
Designation |
Number of units |
Total capacity, cfs |
Total dynamic head, ft |
Total horsepower |
|
Mitchell Butte Division: |
|
|
|
|
|
Ontario-Nyssa |
4 |
130 |
120 |
2,250 |
|
Owyhee Ditch |
3 |
222 |
50 |
1,500 |
|
Dead Ox Flat Division: |
|
|
|
|
|
Dead Ox |
5 |
176 |
50-111 |
2,675 |
|
Succor Creek Division:1 |
|
|
|
|
|
Succor Creek No. 1 |
1 |
15 |
61 |
--- |
|
Succor Creek No. 2 |
1 |
15 |
66 |
--- |
|
Gem District: |
|
|
|
|
|
Gem Advancement District: |
9 |
334 |
76-180 |
7,610 |
|
South |
1 |
13 |
20 |
40 |
|
North |
1 |
5.5 |
33 |
30 |
|
Kingman Colony District: |
|
|
|
|
|
Kingman Colony |
1 |
6 |
44 |
40 |
|
1 Succor Creek No.1 and No. 2 are direct-connected hydraulic powered units. Other plants are supplied power from Boise Project powerplants. |
|