Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Grants Pass Project 
 Engineering Data

Grants Pass Project  -  Main Page

Facilities in Operation

Diversion Dams

1      

Canals

67 mi  

Laterals

67 mi  

Pumping Plants

6      


Diversion Facilities

Savage Rapids Dam

Type:

Concrete, combination gravity and multiple arch, stoplogged crested

Location

On Rogue River, about 5 miles east of Grants Pass, Oregon.

Year Completed

1921

Dimensions:

 

   Structural height

39 ft

   Hydraulic height

30 ft

   Crest length

456 ft

   Crest elevation

953.0 ft

   Volume

5,600 yd3

Spillway:

Overflow through stoplog-controlled gate openings. Metal stoplogs in one 11- by 19-ft and fifteen 11- by 23-ft bays. Sluiceways: Four 4- by 6-ft gates at north end of dam.

   Capacity

2,000 cfs.

River outlets:

Two 7- by 16-ft top seal radial gates at center of dam.

   Capacity

6,000 cfs.

Headworks:

 

   Gravity diversion:

Two gates at left abutment for Grants Pass Irrigation District.

     Capacity

100 cfs

   Pumping diversion:

Pumping plant at right abutment with two pumps in series that have a lift of 150 ft for Tokay Canal. Also, a pump with a 90-ft lift for South Highline Canal.

     Capacity

50 cfs  for Tokay Canal and 75-cfs for South Highline Canal.


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Savage Rapids

2

125

90-150

1,800

Jerome Prairie

2

     24.5

   90

   325

Demaray

1

    8

 114

   125

Allen Creek

1

       4.2

      75.5

     50

Dowell Road

1

    2

   66

     25

C-Back

1

    1

   30

     25

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links