|
Washoe Project - Main Page
Facilities in Operation
|
Storage Dams |
2 |
|
Diversion Dams |
1 |
|
Fishway |
3.0 mi |
|
Powerplants |
1 |
|
Storage Facilities
Prosser Creek Dam Stampede Dam
Diversion Facilities
Marble Bluff Dam
|
Type: |
Zoned earthfill |
|
Location |
About 3 miles from the terminus of the Truckee River on the Pyramid Lake Indian Reservation. |
|
Year Completed |
1975 |
|
Dimensions: |
|
|
Structural height |
35 ft |
|
Hydraulic height |
22 ft |
|
Crest length |
1,622 ft |
|
Crest elevation |
3,866.0 ft |
|
Volume |
208,000 yd3 |
|
Spillway capacity at 3864.9 ft |
19,300 cfs |
|
Pyramid Lake Fishway |
|
|
Diversion capacity |
50 cfs |
|
Carriage Facilities
Pyramid Lake Fishway - Fish handling facilities are located at Marble Bluff Dam
|
Location |
From Marble Bluff Dam to Pyramid Lake. |
|
Construction period |
1975 |
|
Length |
3.0 mi |
|
Capacity |
50 cfs |
|
Typical section - initial reach |
|
|
Bottom width |
6 ft |
|
Side slopes |
1.75:1 |
|
Water depth |
4 ft |
|
Lining thickness |
1.5 ft |
|
Power Facilites
Stampede Powerplant
|