Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 Ventura River Project 
 Engineering Data

Ventura River Project  -  Main Page

Facilities in Operation

Storage Dams

1      

Diversion Dams

1      

Canals

4.5 mi  

Pumping Plants

5      

Pipelines

34.8 mi  


Storage Facilities

Diversion Facilities

Robles Diversion Dam

Type:

Rockfill weir, timber cutoff wall

Location

On the Ventura River about 12 miles north of Ventura, California.

Year Completed

1958  

Dimensions:

 

   Structural height

24 ft  

   Hydraulic height

13 ft  

   Crest length

530 ft  

   Crest elevation

765.0 ft  

   Volume

11,000 yd3  

   Diversion capacity

500 cfs  


Carriage Facilities

Robles-Casitas Canal

Location

From Robles Diversion Dam southwest to Casitas Reservoir

Construction period

1957-1958  

Length

4.5 mi  

Capacity

500 cfs  

Typical section - initial reach

 

   Bottom width

7 ft  

   Side slopes

1.5:1  

   Water depth

5.6 ft  


Main Pipeline System

Location

From Casitas Dam west to near Punta, California, northeast to the Upper Ojai Valley, and then south about 1 mile to Foster Park, California.

Construction period

1957-1959  

Length

33.9 mi  

Capacity

121 cfs  

Diameter

54-12 in  


Robles-Casitas Diversion Conduit

Location

An integral part of the Robles-Casitas Canal which extends from the Robles Diversion Dam to Casitas Reservoir.

Construction period

1957-1959  

Length

0.9 mi  

Capacity

500 cfs  

Type:

Reinforced concrete

Diameter

78 in  


Pumping Plants

Designation

Number of units

Total capacity, cfs

Total dynamic head, ft

Total horsepower

Rincon

2

  6

   900

1,040

Ventura Avenue No. 1

2

  2

   900

3,200

Ventura Avenue No. 2

4

  6

   429

1,800

Ojai Valley

3

50

   220

   900

Upper Ojai

3

48

1,040

   560

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links