Home | About Us | News | Programs & Activities | Library | Water Operations | Site Index
 CVP - San Felipe Division 
 Water Data

CVP - San Felipe Division  -  Main Page

Project Water Supply

Normal

20.82 in  

Maximum  -  1983

37.76 in  

Minimum   -  1977

11.17 in  

Gilroy, California 1961-1990

 

      Temperature

Mean Annual

59.9 °F  

Daily Maximum  -  07/15/1972

115 °F  

Daily Maximum  -  12/22/1990

17 °F  

Gilroy, California 1957-1996

 

Growing Season

345 days  

Elevation of irrigable area

234 ft  

      San Luis Creek

Drainage area at San Luis Dam

84.6 mi2  

Annual discharge

 

   Maximum

acre-ft  

   Minimum

acre-ft  

   Average

acre-ft  

                              Streamflows:  San Luis Creek near Los Banos, California (USGS)

Project Water Quality

 

Dams | Projects | Powerplants | Contact Us | Maps | Glossary | FAQ´s | Links