|
Newlands Project - Main Page
Project Water Supply
Historic Conditions:
|
Normal |
5.32 in |
|
Maximum - 1983 |
8.45 in |
|
Minimum - 1986 |
2.55 in |
|
Fallon, Nevada 1961-1990 |
|
|
|
Mean Annual |
50.1 °F |
|
Daily Maximum - 08/11/1940 |
105 °F |
|
Daily Minimum - 01/02/1942 |
-16 °F |
|
Reno, Nevada 1937-1996 |
|
|
Growing Season |
132 days |
|
Elevation of irrigable area |
3,965 ft |
|
|
Drainage area at Fort Churchill, Nevada |
1,450 mi2 |
|
Annual discharge |
|
|
Maximum - 1983 |
804,600 acre-ft |
|
Minimum - 1977 |
26,260 acre-ft |
|
Average - 1959-1997 |
276,400 acre-ft |
|
|
Drainage area at Vista, Nevada |
1,430 mi2 |
|
Annual discharge |
|
|
Maximum - 1983 |
2,017,000 acre-ft |
|
Minimum - 1992 |
114,600 acre-ft |
|
Average - 1959-1997 |
593,100 acre-ft |
|
Project Water Quality
|